Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance GROUND FLOOR WZ 301 GALI NO 10 LAJWANTI GARDEN NAGAL RAYA NEW DELHI 110046 | NEW DELHI | DELHI | 110046 | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹4.5 L (2.07%)Admitted-Finance | ₹2.2 Cr+₹4.5 L (2.07%) | L2 | Admitted-Finance |
| 3 | L3₹2.9 Cr+₹72.8 L (33.6%)Admitted-Finance 2 44 A 4 KALU SARAI HAUZ KHAS DELHI SOUTH WEST DELHI DELHI 110016 | SOUTH DELHI | DELHI | 110016 | ₹2.9 Cr+₹72.8 L (33.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWASTIK ELECTROTECH PVT LTD L3 | Dhapola Elevators and Engineering L1 | guruji elevator L2 |
|---|---|---|---|---|---|---|
| 1.00Round the clock (24 X 7)Operation of Lifts including rescue operation of Lifts in IIT camps by providing following staff per day for Six days of the week throughout the year (12 months) as per detail given below :- (a) 01 Technical supervisor (b) 11(9+2) No. – Lift Operator (c) 07(6+1) No. – Helper Scope of work includes: 1. Operation and Rescue operation of Lift 2. Cleaning of Lifts. 3. Repair & Maintenance of electrical installations (Installed in Lifts and Machine rooms) 4. Repair & Maintenance of ceiling fans, exhaust fans.(Installed in Lifts and Machine rooms) 5. Repair & maintenance of Electrical boards in machine room/control room. 6. Minor repair work of Lifts. 7. Any others work assigned by AE/AEE/EE(ED-II) 8. Stationary required/Log book of lifts submitting daily/ weekly/ monthly/ yearly report shall be provided by the contractor. 9. All measuring instruments to note down the reading wherever measuring meters are not installed shall be provided by contractor. Work shall be carried out as per preventive maintenance schedule. (One job means to carry out above work by deputing above specified staff for one month as per duty chart.) | ||||||
| 2.00 | Technical Supervisor (01 No) | 312 | Man-days | 1,581 ₹4,93,272 | 700 ₹2,18,400 Lowest | 1,500 ₹4,68,000 |
| 3.00 | Skilled Grade/ Lift Operator (Rescue operator) / Mechanic (11 Nos.) | 3,459 | Man-days | 1,456 ₹50,36,304 | 690 ₹23,86,710 Lowest | 1,400 ₹48,42,600 |
| 4.00 | Un-Skilled (Helper) Grade: (07 Nos.) | 2,202 | Man-days | 1,195 ₹26,31,390 | 710 ₹15,63,420 Lowest | 1,300 ₹28,62,600 |
| 5.00Comprehensive Annual maintenance contract of following make & capacity Lifts including servicing routine check-up of all installations, safety devices, alarms system, panels and other accessories as applicable etc. complete as required all lifts installed at various buildings in IIT Delhi campus. Details of lifts are as under (one job means CAMC of one lift per month) :- | ||||||
| 6.00 | 02 Nos. 08 Passengers (544 kg)/Lift (G + 6) Johnson Make lifts installed in M.S building Speed 1 Mtr/Second, Type of Lift with Machine Room ( Installation of year : 2006). | 24 | Job | 14,506 ₹3,48,144 | 13,500 ₹3,24,000 | 10,584 ₹2,54,016 Lowest |
| 7.00 | 02 Nos. 08 Passengers (544 kg)/Lift (G + 7) Omega Make lifts installed in M.S building Speed 1.5 Mtr/Second, Type of Lift without Machine Room (Installation of year : 2022). | 24 | Job | 8,246.7 ₹1,97,920.8 | 12,000 ₹2,88,000 | 6,000 ₹1,44,000 Lowest |
| 8.00 | 02 Nos. 08 Passengers (544 kg)/Lift (B + G + 4) Johnson Make lifts installed in SIT building Speed 1 Mtr/Second, Type of Lift with Machine Room, (Installation of Year : 2014). | 24 | Job | 19,393 ₹4,65,432 | 15,000 ₹3,60,000 | 13,000 ₹3,12,000 Lowest |
| 9.00 | 02 Nos. 10 Passengers (680 kg)/Lift (B + G + 4) Johnson Make lifts installed in Bharti School building Speed 1 Mtr/Second, Type of lift with Machine Room, (Installation of year : 2005). | 24 | Job | 15,376 ₹3,69,024 | 15,000 ₹3,60,000 | 11,218 ₹2,69,232 Lowest |
| 10.00 | 07 Nos. 20 Passenger (1500 kg)/Lift (G + 3) Omega Make lifts installed in Block I to VI, Speed : 1.5 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2015). | 84 | Job | 10,302 ₹8,65,368 | 13,000 ₹10,92,000 | 7,516 ₹6,31,344 Lowest |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
11 Jul 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer (Electrical-II), Works Department, MZ-108, IIT Delhi, Hauz Khas, New Delhi - 110016
Round the clock operation with rescue operation of lifts including comprehensive annual maintenance contract of lifts in whole campus at IIT Delhi
2025_IIT_867373_1
IITD/WORKS (SP-5050)/2025
Open Tender
Miscellaneous Works
Works
365 days
Indian Institute of Technology Delhi Hauz Khas
As per tender documnets
15 documents required · 15 mandatory
₹0
₹4.6 L
13 Aug 2025
4 Jul 2025
14 Jul 2025
4 Jul 2025
11 Jul 2025
4 Jul 2025
Amount
Round the clock (24 X 7)Operation of Lifts including rescue operation of Lifts in IIT camps by providing following staff per day for Six days of the week throughout the year (12 months) as per detail given below :- (a) 01 Technical supervisor (b) 11(9+2) No. – Lift Operator (c) 07(6+1) No. – Helper Scope of work includes: 1. Operation and Rescue operation of Lift 2. Cleaning of Lifts. 3. Repair & Maintenance of electrical installations (Installed in Lifts and Machine rooms) 4. Repair & Maintenance of ceiling fans, exhaust fans.(Installed in Lifts and Machine rooms) 5. Repair & maintenance of Electrical boards in machine room/control room. 6. Minor repair work of Lifts. 7. Any others work assigned by AE/AEE/EE(ED-II) 8. Stationary required/Log book of lifts submitting daily/ weekly/ monthly/ yearly report shall be provided by the contractor. 9. All measuring instruments to note down the reading wherever measuring meters are not installed shall be provided by contractor. Work shall be carried out as per preventive maintenance schedule. (One job means to carry out above work by deputing above specified staff for one month as per duty chart.)
Technical Supervisor (01 No)
Skilled Grade/ Lift Operator (Rescue operator) / Mechanic (11 Nos.)
Un-Skilled (Helper) Grade: (07 Nos.)
Comprehensive Annual maintenance contract of following make & capacity Lifts including servicing routine check-up of all installations, safety devices, alarms system, panels and other accessories as applicable etc. complete as required all lifts installed at various buildings in IIT Delhi campus. Details of lifts are as under (one job means CAMC of one lift per month) :-
02 Nos. 08 Passengers (544 kg)/Lift (G + 6) Johnson Make lifts installed in M.S building Speed 1 Mtr/Second, Type of Lift with Machine Room ( Installation of year : 2006).
02 Nos. 08 Passengers (544 kg)/Lift (G + 7) Omega Make lifts installed in M.S building Speed 1.5 Mtr/Second, Type of Lift without Machine Room (Installation of year : 2022).
02 Nos. 08 Passengers (544 kg)/Lift (B + G + 4) Johnson Make lifts installed in SIT building Speed 1 Mtr/Second, Type of Lift with Machine Room, (Installation of Year : 2014).
02 Nos. 10 Passengers (680 kg)/Lift (B + G + 4) Johnson Make lifts installed in Bharti School building Speed 1 Mtr/Second, Type of lift with Machine Room, (Installation of year : 2005).
07 Nos. 20 Passenger (1500 kg)/Lift (G + 3) Omega Make lifts installed in Block I to VI, Speed : 1.5 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2015).
01 No Physically Challenged, 01 Passenger/Lift, Opera Make lift installed in Block II, Type of Lift : Machine Room Less, Speed : 0.5 Mtr/Second.
01 No Physically Challenged, 01 Passenger/Lift, Opera Make lift installed in Seminar Hall, Type of Lift without Machine Room , Speed : 0.5 Mtr/Second.
01 No 08 Passengers (544 kg)/Lift (G + 3) Otis Make lifts, Speed: 1.0 Mtr/Second, Type of Lift with Machine Room, installed in Synergy building AND 01 No Books Lift, Otis Make lift,(G+2), Type of Lift with Machine Room, Speed : 0.5 Mtr/Second, installed in Central Library.
01 No 15 Passengers (1020 kg)/Lift (G + 4) Schindler Make lifts, Speed: 1.0 Mtr/Second, Type of Lift without Machine Room, (Installation of Year: 2020), installed in Block III.
01 No 15 Passengers (1020 kg)/Lift (G + 4) Schindler Make lifts, Speed: 1.0 Mtr/Second, Type of Lift without Machine Room, (Installation of Year: 2020), installed in Block III.
01 No 15 Passengers (1020 kg)/Lift (G + 4) Schindler Make lifts, Speed: 1.0 Mtr/Second, Type of Lift without Machine Room, (Installation of Year: 2020), installed in Block IV.
01 No 15 Passengers (1020 kg)/Lift (G + 4) Schindler Make lifts, Speed: 1.0 Mtr/Second, Type of Lift without Machine Room, (Installation of Year: 2020), installed in Block IV.
04 Nos. 20 Passengers (1500 kg)/Lift (B + G + 5) Johnson Make lifts installed in LHC, Speed : 1.0 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2016).
05 Nos. 20 Passengers (1500 kg)/Lift (B + G + 5) Johnson Make lifts installed in LHC, Speed : 1.0 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2016).
04 Nos. 16 Passengers (1088 kg)/Lift (-G + 6) Johnson Make lifts installed in Academic Building 99B, Speed : 1.5 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2023).
02 Nos. 2000 kg good Lift (-G+6)Floor lifts installed in Academic Building 99B, Speed : 1.0 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2023).
02 Nos. 16 Passengers (1088 kg)/Lift (-G + 6) Johnson Make lifts installed in Academic Building 99C, Speed : 1.5 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2023).
02 Nos. 16 Passengers (1088 kg)/Lift (-G + 6) Johnson Make lifts installed in Academic Building 99C, Speed : 1.5 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2023).
02 Nos. 2000 kg good Lift (B+G+6)Floor lifts installed in Academic Building 99C, Speed : 1.0 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2023).
01 No. 10 Passengers (680 kg)/Lift (B+G + 5) Johnson Make lifts installed in Academic Building 99C, Speed : 1.5 Mtr/Second, Type of Lift with Machine Room (Installation Year : 2023).
03 Nos. 10 Passengers (680 kg)/Lift (G + 0) Johnson Make lifts installed in Himadri Girls Hostel Speed 1.5 Mtr/Second, Type of Lift with Machine Room, (Installation of Year: 2010).
04 Nos. 13 Passengers (1020 kg)/Lift (G + 0) KONE Make lifts installed in Sahayadri Girls Hostel Speed 1.5 Mtr/Second, Type of Lift without Machine Room, (Installation of year: 2022).
02 Nos. 20 Passengers (1500 kg)/Lift (B + G + 6) TK Elevator (Thyssenkrupp) Make lifts installed in Vishwakarma Bhawan Speed 1 Mtr/Second, Type of Lift with Machine Room (Installation of year: 2016).
08 Nos. 13 Passengers (1020 kg)/Lift (B + G + 7) OTIS Elevator Make lifts installed in Vikremshila Apartment (Block 1,2,3 and 4) Speed 1.5 Mtr/Second, Type of Lift with Machine Room(Installation of year:2012).
12 Nos. 15 Passengers (1020 kg)/Lift (G + 8) OTIS Elevator Make lifts installed in AVANTI Apartment (Tower 1,2,3,4,5 and 6) Speed 1.5 Mtr/Second, Type of Lift without Machine Room (Installation of year: 2021).
06 Nos. 08 Passengers (544 kg)/Lift (G + 7) TK Elevator (Thyssenkrupp) Make lifts installed in NEW NALANDA Apartment Speed : 1.0 Mtr/Second, Type of Lift with Machine Room(Installation of year: 2020).
04 Nos. 08 Passengers (544 kg)/Lift (G + 5) TK Elevator (Thyssenkrupp) Make lifts installed in TAXILA Apartment(Block 1 & 2) Speed 1.0 Mtr/Second, Type of Lift with Machine Room ( Installation of year : 2010 & 2011)*( 1 No. Lift of Block-I).
04 Nos. 08 Passengers (544 kg)/Lift (G + 5) TK Elevator (Thyssenkrupp) Make lifts installed in VAISHALI Apartment(Block 1 & 2) Speed 1.0 Mtr/Second, Type of Lift with Machine Room , (Installation of year : 2010 & 2011).
04 Nos. 13 Passengers (1020 kg)/Lift (B + G + 8) OTIS Elevator Make lifts installed in GIRNAR HOSTEL Speed 1.5 Mtr/Second, Type of Lift with Machine Room( Installation of year:2012).
04 Nos. 13 Passengers (1020 kg)/Lift (B + G + 8) OTIS Elevator Make lifts installed in UDAIGIRI HOSTEL Speed 1.5 Mtr/Second, Type of Lift with Machine Room ( Installation of year: 2012).
04 Nos. 13 Passengers (1020 kg)/Lift (G + 7) OTIS Elevator Make lifts installed in DRONAGIRI HOSTEL Speed 1.5 Mtr/Second, Type of Lift without Machine Room (Installation of year:2022).
04 Nos. 13 Passengers (1020 kg)/Lift (G + 7) OTIS Elevator Make lifts installed in SAPTAGIRI HOSTEL Speed 1.5 Mtr/Second, Type of Lift without Machine Room( Installation of year:2022).
01 No 08 Passenger (544 kg) /Lift (G + 2) Johnson Make lifts installed in Mittal Sports Complex Speed 1.5 Mtr/Second, Type of Lift with Machine Room (Installation of year: 2021-22).
01 No. Goods lift in Dronagiri & Saptagiri hostel kitchen.
guruji elevator (BID ID -3245233)
SWASTIK ELECTROTECH PVT LTD (BID ID -3246354)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .