Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 CrAccepted-AOC AT P O PANIKOILI DIST JAJPUR 750001 | 750001 | L1 | Accepted-AOC QUALIFIED BIDDER |
Tender Value
₹17.8 Cr
EMD Value
₹17.8 L
Closing Date
3 Jun 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER OPHWC
OPHWC BHUBANESWAR
Building Work
2023_OSPHW_89164_2
08/OPHWC/2023-24
National Competitive Bid
Civil Works - Buildings
Percentage
360 days
MAYURBHANJ
Please refer Tender documents
3 documents required · 3 mandatory
₹11,800
₹17.8 L
Yes
10 Jul 2023
20 May 2023
5 Jun 2023
20 May 2023
3 Jun 2023
20 May 2023
20 May 2023 - 24 May 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 10 Nos. E type Qtrs. at Baripada Town PS, Mayurbhanj | - | - | - | - |
| 2 | CVL | - | - | - | - |
| 3 | 50000000
"Earth work in hard soil or gravelly soil within 50m. initial lead and 1.5m. initial lift including rough dressing and breaking clodsto maximum 5cm. to 7cm. and laying and layers not exceeding 0.3m. in depth. "
Ground Floor | 532.72 | CUM | 197.61 | ₹1,05,270.8 |
| 4 | 50000003
"Providing and laying plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone agregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring, shuttering etc.complete all depth and height. "
Ground Floor | 88.42 | CUM | 3,949.22 | ₹3,49,190.03 |
| 5 | 50000008
"Providing and laying reinforced cement concret of M-20 grade with 20mm and down grade black hard grinite(crusher broken) stone chips including cost of all materials, labours T&P etc. Complete but excluding the cost of reinforcement. "
Ground Floor | 277.12 | CUM | 4,450.1 | ₹12,33,211.71 |
| 6 | First Floor | 104.66 | CUM | 4,537.68 | ₹4,74,913.59 |
| 7 | Second Floor | 105.04 | CUM | 4,638.4 | ₹4,87,217.54 |
| 8 | Third Floor | 61.29 | CUM | 4,754.23 | ₹2,91,386.76 |
| 9 | Forth Floor | 8.58 | CUM | 4,887.43 | ₹41,934.15 |
| 10 | 50000009
"Rigid and smooth centering and shuttering false, levelled works and dismentalling then after casting including cost of mterials complete for Plinth band & Column Footing. "
Ground Floor | 376.86 | SQM | 103.79 | ₹39,114.3 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_438574.xls
BOQ Document • 2.60 MB
121324902.pdf
Tender Document • 0.87 MB
DTCN2.pdf
Tender Document • 1.29 MB
121324904.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .