Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.3 LAccepted-AOC | L1 | Accepted-AOC RECOMMENDED BY TC | |
| 2 | L2₹43.0 L+₹4.7 L (12.2%)Rejected-Finance JAYANT NEAR JAI HIND SCHOOL LAXMI MARKET SINGRAULI 486890 MADHYA PRADESH INDIA | SINGRAULI | MADHYA PRADESH | 486890 | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹44.1 L+₹5.8 L (15.1%)Rejected-Finance DHOTI VINDHYANAGAR WAIDHAN DISTT SINGRAULI MP | WAIDHAN | SINGRAULI | MP | L3 | Rejected-Finance NOT L1 |
Tender Value
Refer Docs
EMD Value
₹58,000
Closing Date
24 Aug 2024, 11:00 amClosed
GM (Excv), Dudhichua Area
Office of the GM (Excavation), Dudhichua Project PO Khadia, Distt. Sonebhadra, UP - 231222
Offloading work to outside agency towards wheel removal and fitment of 27.00X49 / 37.00X57 / 40.00X57 size OTR tyres of 100Te and 190Te dumpers on as and when required basis at Dudhichua Project for 2 years
2024_NCL_314693_1
DCH/GM (Excv)/120Te /2024-25/38
Open Tender
Excavation Department Work
Item Rate
730 days
NCL, DUDHICHUA PROJECT
Please refer Tender documents
4 documents required · 4 mandatory
₹58,000
24 Oct 2024
9 Aug 2024
26 Aug 2024
9 Aug 2024
24 Aug 2024
10 Aug 2024
9 Aug 2024 - 17 Aug 2024
Amount
Total cost including labour charge, contractor profit, CMPF, tools & tackles charge (exclusive of GST) as per SCOPE OF WORK and NIT towards Wheel removal from Dumper 27.00X49 size OTR tyres [Work completion period within 2 Hour for each job]
Total cost including labour charge, contractor profit, CMPF, tools & tackles charge (exclusive of GST) as per SCOPE OF WORK and NIT towards Wheel fitment to Dumper 27.00X49 size OTR tyres [Work completion period within 2 Hour for each job]
Total cost including labour charge, contractor profit, CMPF, tools & tackles charge (exclusive of GST)as per SCOPE OF WORK and NIT towards Wheel removal from Dumper 37.00X57 size OTR tyres [Work completion period within 3 Hour for each job]
Total cost including labour charge, contractor profit, CMPF, tools & tackles charge (exclusive of GST)as per SCOPE OF WORK and NIT towards Wheel fitment to Dumper 37.00X57 size OTR tyres [Work completion period within 3 Hour for each job]
Total cost including labour charge, contractor profit, CMPF, tools & tackles charge (exclusive of GST)as per SCOPE OF WORK and NIT towards Wheel removal from Dumper 40.00X57 size OTR tyres [Work completion period within 3 Hour for each job]
Total cost including labour charge, contractor profit, CMPF, tools & tackles charge (exclusive of GST)as per SCOPE OF WORK and NIT towards Wheel fitment to Dumper 40.00X57 size OTR tyres [Work completion period within 3 Hour for each job]
Total impact of GST for the purpose of CTC
SARWESHWARI ENTERPRISES
RD CONSTRUCTION COMPANY
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_326124.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .