Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹4.9 Cr Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | ₹4.9 Cr | L1 |
| 2 | L2₹4.9 Cr+₹5.1 L (1.05%) Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | ₹4.9 Cr+₹5.1 L (1.05%) | L2 |
| 3 | L3₹5.1 Cr+₹23.0 L (4.70%) Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | ₹5.1 Cr+₹23.0 L (4.70%) | L3 |
| 4 | L4₹5.8 Cr+₹87.6 L (17.9%) Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | ₹5.8 Cr+₹87.6 L (17.9%) | L4 |
| 5 | L5₹5.8 Cr+₹90.0 L (18.4%) Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi | ₹5.8 Cr+₹90.0 L (18.4%) | L5 |
| Sl No | Description | Qty | Unit | AJAY SINGH L5 | YOGESH SIKKA L2 | M/S AWADH CONSTRUCTION L4 | M/s Singh Builders L1 | Hemendra and Sons Infrastructure L3 |
|---|---|---|---|---|---|---|---|---|
| 1 | Composite work | - | - | -21.85 ₹5,79,32,237.07 | -33.3 ₹4,94,44,404.51 | -22.17 ₹5,76,95,022.54 | -33.99 ₹4,89,32,910.67 Lowest | -30.89 ₹5,12,30,926.48 |
Tender Value
₹7.4 Cr
EMD Value
₹14.8 L
Closing Date
16 Sept 2025, 3:00 pmClosed
EE&SM( C) -1
ANIKET SINHA
O/o Executive Engineer and SM(C)-2, BHU Project Varanasi, CPWD, BHU, Varanasi-221005
Construction of Mezzanine floor and Upgradation of VIGA/EIGA power manufacturing machine lab at Department of Mechanical Engineering, IIT(BHU), Varanasi
125106
02/EE/BHUPD-1/2025-26
OPEN
Civil Works - Buildings
NCB
7 months
Kanpur Nagar, Uttar Pradesh
6 documents required · 6 mandatory
₹14.8 L
Not Applicable
16 Sept 2025
30 Aug 2025
16 Sept 2025
16 Sept 2025
12 Sept 2025
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT022025-26.pdf
document • 6.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .