Tender Value
₹3.2 L
EMD Value
₹3,500
Closing Date
16 Oct 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-II ALIGARH
ALIGARH
EDC2A-54/2023-24
2023_DVVNL_843365_1
EDC2A-54/2023-24
Open Tender
Electrical Works
Item Rate
30 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL AGRA WEBSITE
₹3,500
26 Oct 2023
26 Sept 2023
16 Oct 2023
26 Sept 2023
16 Oct 2023
26 Sept 2023
Amount
Cartage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
PCC Poles 8.5 Mtr. Long
ST Poles 11 Mtr. Long
Cartage of line material viz L.T./H.T.Cable, Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
Erection of PCC Poles 8.5 Mtr. Long single support including complete H.T/L.T fittings (with Drilling and cutting) as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
Erection of double pole on ST pole 11 Mtr. Long including the work of complete line as per RESSPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
Provding & Fixing of TPMO Complete including the work of complete fitting as per RESSPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
Safe carriage & Installation of 250 KVA Distribution transformer from Store Center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labour, T&P and carrier etc. required for proper completion of work. (Distance 0 to 50 Km.)
Laying of L.T. Cable 1x250 Sq.mm. Jumphering from L.T. Site transformer to Line.
Plinth foundation and Fabrication & Erection of Fencing of 250 KVA Distribution Transformer as per RESSPO norms including the supply of all material, labour, carrier and T & P etc. required for proper completion of work.
Body and neutral earthing of 250 KVA L.T. distribution Transformers installed by digging of pit up to water level depth (approx. 100’) and then inserting 1-1/4" dia G.I. pipe of "B" grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work. Details given below.
Erection & Grouting of complete stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work.
Laying, sagging, stringing, binding and jumpering etc. of ACSR Weasal Conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Grouting of PCC poles 8.5 Mtr.Long as per RESSPO norms
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
Chopping of tree branches which are touching to HT/LT lines.
Providing & Fixing of following material as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Stone Pad 300x300x75 mm
Clamp for LT with Bolt & Nut
Holding Clamp with Bolt & Nut
Danger Plate
P.G. Clamp
Providing & Fixing of missing Nut bolts and washer as per RESSPO norms.
Dismantling and removal of existing conductor/cable/GI Wire from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage (from respective site to store centre), cost of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Conductor (Scrap)
G.I. Wire (Scrap)
P K ENTERPRISES
SHARMA ELECTRIC WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .