| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance 6 JAGRITI OLD KOLKATA ROAD KOLKATA 700123 | KOLKATA | KOLKATA | WEST BENGAL | 700123 | L1 | Accepted-Finance L1 | |
| 2 | L2₹4.7 L+₹2,558.52 (0.55%)Rejected-Finance N A | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.7 L+₹2,605.90 (0.56%)Rejected-Finance 3 K N MUKHERJEE ROAD TALPUKUR BARRACKPORE NORTH 24 PARGANAS KOL 700123 | BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 700123 | L3 | Rejected-Finance L3 | |
| 4 | L4₹4.7 L+₹4,453.72 (0.95%)Rejected-Finance N A | L4 | Rejected-Finance L4 | |
| 5 | L5₹4.7 L+₹4,501.10 (0.96%)Rejected-Finance 11 PRAMATHA CHOWDHURY SARANI KOLKATA 700053 | KOLKATA | WEST BENGAL | 700053 | L5 | Rejected-Finance L5 |
Tender Value
₹4.7 L
EMD Value
₹9,476
Closing Date
6 Apr 2026, 1:00 pmClosed
Assistant Engineer,PWD,
M. R . BANGUR HOSPITAL COMPOUND 241, DESHAPRAN SHASMAL ROAD, TOLLYGUNGE, KOLKATA-700033
Emergent removing of old roof treatment of IPD building within the campus of Bijoygarh S G Hospital, Jadavpur during the year 2025-26 .
2026_WBPWD_1022391_8
WBPWD/SKHSD-I/AE/eNIT-15 OF 2025-2026
Open Tender
CIVIL WORKS
Percentage
21 days
Bijoygarh S G Hospital
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,476
Yes
20 Jul 2026
13 Mar 2026
8 Apr 2026
13 Mar 2026
6 Apr 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bituminous filler of approved type in expansion joints of dummy joints including finishing the top surface as directed. | 0.34 | Cu.M. | 55,541.46 | ₹18,884.1 |
| 2 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75 m as directed | 256 | Sq.M | 22.64 | ₹5,795.84 |
| 3 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface]
(ii) With 1:4 cement mortar
(b) 15 mm thick plaster | 256.2 | Sq.M | 194.55 | ₹49,843.71 |
| 4 | (a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification | 256.31 | Sq.M | 104.88 | ₹26,881.79 |
| 5 | Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.
A) UPVC Pipes:
(ii) 110 mm. Dia. | 30.4 | Mtr. | 299.14 | ₹9,093.86 |
| 6 | c) Bend 87.5 degree
(ii) 110 mm. Dia. | 24 | each | 166.85 | ₹4,004.4 |
| 7 | d) Shoe
(ii) 110 mm. Dia. | 8 | each | 132.28 | ₹1,058.24 |
| 8 | Preparation of drainage spout on roof for bituminous waterproofing treatment after required grading and shaping of the under bed with Cement Concrete (1:2:4) or Cement Mortar (1:4) as directed, Chamfering and moulding the parapet wall to form a bell mouth entry, if required and providing full course treatment with bituminous felt to facilitate quick and smooth drainage of watwr into the down pipes complete including cost of all materials and labour according to satisfaction of the Engineer - in - Charge. (This item shall be done for reparing works only and shall not be used when original/renewal of tarfelting work is proposed to be undertaken)
All floor | 52 | each | 131.1 | ₹6,817.2 |
| 9 | Emergent roof treatment by application of ready to use, non- toxic, water based, cold applied, single component, elastomeric- in-situ seamless monolythic, acrylic modified bituminious liquid water proofing membrane (terfeit L.M. or any other equivalent product) after preparing the surface by cleaning and repairing the roof creacks by cement and sand mortar (1:40) perferably with anti shrinkage mortar (repair by mortar to paid seperately) if any. apply one coat (@0.7 kg?sqm without dilution with water) after application of priming coat (dituted with water in the ratio of 50:50 and apply @400grm/sqm of the mixture) (time gap between coats- after priming coat allow it to touch dry, and after final coat allow 36 hour for any further works.) including cost of materials and base cleaning, tools & plants complete as per direction of engineer-in-charge. (conduct ponding test after 7 days curing at ambient temperature) (cover layer not required) | 479.27 | Sq.M | 266.3 | ₹1,27,629.6 |
| 10 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per
relevant IS codes.
Pakur variety | 5.4 | cum | 6,394.28 | ₹34,529.11 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
2911ii.pdf
Tender Documents • 0.50 MB
BOQ_2512915.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .