Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 CrAdmitted-Finance | ₹27.8 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive by CE JJM vide letter 16330-331 dated 21.12.2022 Due to non fulfillment of Project execution criteria, key component of water treatment plant criteria and deposition of less than desired tender fee |
| Sl No | Description | Qty | Unit | GRG INFRA L1 |
|---|---|---|---|---|
| 1.00 | FILTER PLANT 5.0 MLD - Design, construction, execution, testing and commissioning of Rapid Gravity filterTreatment Plant capacity 5.00 MLD including all relevant civil, electrical , mechanical ,instrumentation and automization works at Deoli Hulla H/W. | 1 | Job | 1,41,00,000 ₹1.4 Cr |
| 2.00 | Replacement of Filter media (at existing 1.85 MLD Deoli Hulla RGFP) with granular materials/stone crushed aggregates including pipes, valves, etc. satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per technical specification including all material, labour, machinery as per clause 710.1.4 of IRC:78 and clause 2200 of MoRT&H specification. | 1 | Job | 14,51,000 ₹14.5 L |
| 3.00 | Construction of Sectional valve ( BF/SV/FCV) Chambers ( 24 Nos) | 1 | Job | 3,31,000 ₹3.3 L |
| 4.00 | Construction of Scour Valve Chambers ( 10 nos) | 1 | Job | 51,000 ₹51,000 |
| 5.00 | Construction of Air Valve Shaft/chambers (39 Nos) | 1 | Job | 1,51,000 ₹1.5 L |
| 6.00 | Construction of village transfer chamber as per approved design & drawing & specification given for material of construction and completion of all works of installation of sluice valves, D.joints, C.I. pipes, specials etc. complete in all respect to achieve the work as given in the scope of work. ( Three high altitude OH) (04 nos.) | 1 | Job | 1,51,000 ₹1.5 L |
| 7.00 | Providing supplying , erection and commissioning of Electro-magnetic flow meters with transmitter, & flow Integrator (with Digital display in Instrument Panel in Control Rom) complete in all respect as per the scope of work & specifications of following sizes: 100 ( in mm) (4 nos) | 1 | Job | 3,51,000 ₹3.5 L |
| 8.00 | Repair and extension of existing Pump House at Deoli Hulla HW | 1 | Job | 2,51,000 ₹2.5 L |
| 9.00 | Provision for Campus Development at Deoli Hulla H/W | 1 | Job | 2,51,000 ₹2.5 L |
| 10.00 | Operation and Maintenance
O&M of the major components of schemes up to the point mentioned in work order (Villages Boundary) as per scope of work. It includes cost of Basic Service Charges, Administration and Management, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Cost of material required for maintenance & repairs, Cost of Lubricants, other Consumables, Spare Parts as per Scope of Work & terms & conditions of contract for 5 years (after completion of defect laibility period of one year) complete in all respect. No payment for O&M during one year defect liability period will be admissible.
Note :- The work of O&M will be carried out up to the point mentioned in work order (Village boundary)
(O&M amount will be divided in 5 years with yearly increment @5% totaling to approved quoated amount for O&M for 5 years)
O&M of entire system for 5 years of O&M period | 1 | Job | 77,51,500 ₹77.5 L |
Tender Value
₹24.8 Cr
EMD Value
₹49.7 L
Closing Date
21 Nov 2022, 6:00 pmClosed
ACE PHED Region I Jodhpur
O/o ACE PHED Region I Jodhpur
WORK OF REGIONAL WATER SUPPLY SCHEME DEOLI HULLA BAGARI NAGAR UNDER JJM INCLUDING OANDM FOR FIVE YEARS AFTER ONE YEAR DEFECT LIABILITY PERIOD TEHSIL SOJAT DISTRICT PALI
2022_PHCJO_299324_1
NIT NO 27/2022-23 ACE PHED REGION I JODHPUR
Open Tender
Civil Works - Water Works
365 days
Pali
As per TD
2 documents required · 2 mandatory
₹10,000
EE PHED Dn Sojat City through Egrass Challan
₹49.7 L
Yes
O/o ACE PHED Region I Jodhpur
12 Jan 2023
1 Oct 2022
22 Nov 2022
1 Oct 2022
21 Nov 2022
21 Oct 2022
18 Oct 2022
Amount
FILTER PLANT 5.0 MLD - Design, construction, execution, testing and commissioning of Rapid Gravity filterTreatment Plant capacity 5.00 MLD including all relevant civil, electrical , mechanical ,instrumentation and automization works at Deoli Hulla H/W.
Replacement of Filter media (at existing 1.85 MLD Deoli Hulla RGFP) with granular materials/stone crushed aggregates including pipes, valves, etc. satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per technical specification including all material, labour, machinery as per clause 710.1.4 of IRC:78 and clause 2200 of MoRT&H specification.
Construction of Sectional valve ( BF/SV/FCV) Chambers ( 24 Nos)
Construction of Scour Valve Chambers ( 10 nos)
Construction of Air Valve Shaft/chambers (39 Nos)
Construction of village transfer chamber as per approved design & drawing & specification given for material of construction and completion of all works of installation of sluice valves, D.joints, C.I. pipes, specials etc. complete in all respect to achieve the work as given in the scope of work. ( Three high altitude OH) (04 nos.)
Providing supplying , erection and commissioning of Electro-magnetic flow meters with transmitter, & flow Integrator (with Digital display in Instrument Panel in Control Rom) complete in all respect as per the scope of work & specifications of following sizes: 100 ( in mm) (4 nos)
Repair and extension of existing Pump House at Deoli Hulla HW
Provision for Campus Development at Deoli Hulla H/W
Operation and Maintenance O&M of the major components of schemes up to the point mentioned in work order (Villages Boundary) as per scope of work. It includes cost of Basic Service Charges, Administration and Management, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Cost of material required for maintenance & repairs, Cost of Lubricants, other Consumables, Spare Parts as per Scope of Work & terms & conditions of contract for 5 years (after completion of defect laibility period of one year) complete in all respect. No payment for O&M during one year defect liability period will be admissible. Note :- The work of O&M will be carried out up to the point mentioned in work order (Village boundary) (O&M amount will be divided in 5 years with yearly increment @5% totaling to approved quoated amount for O&M for 5 years) O&M of entire system for 5 years of O&M period
Bidder Name
Amount
GRG INFRA(GSTN-08AAQFG9219B1Z9)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
TD_DEOLI_HULLA_BAGRINAGAR_EPROC.pdf
Tender Documents • 19.76 MB
BOQ_531095.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid