Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹54.9 LAdmitted-Finance | -3.25% | ₹54.9 L | L1 | Admitted-Finance |
| 2 | L2₹56.0 L+₹1.1 L (1.91%)Admitted-Finance | -1.40% | ₹56.0 L+₹1.1 L (1.91%) | L2 | Admitted-Finance |
Tender Value
₹56.8 L
EMD Value
₹1.1 L
Closing Date
14 Aug 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-06 Ward-05 Peepalgaon me Rahul Bhartiya ke ghar se Shivala hote hue Triple IIT Road tak sadak sudhar karya.
2026_NNAMC_1174183_10
40 work of 14.08.2026
Open Tender
Civil Works
Percentage
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,726
AS PER DOCS
₹1.1 L
14 Sept 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 371.25 | cum | 1,654.8 | ₹6,14,344.5 |
| 2 | Providing and applying primer coat with SS1 Grade bitumen emulsion on prepared surface of ranular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using technical means. | 3,715.54 | Cum | 39.7 | ₹1,47,506.94 |
| 3 | Providing & Laying D.G.B.M.-50mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumen VG-30 grade bluk @3.40% of weight of mix and including all completion of work as per MORT 7 Hspecification-504 | 185.63 | cum | 11,335.1 | ₹21,04,134.61 |
| 4 | Providing&Applying of tack coat at the rate of 0.25kg/sqm includig material laboured all complition of work | 7,705.6 | cum | 15.3 | ₹1,17,895.68 |
| 5 | Providing & Laying B.C-30 mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumenC.R.M.B bluk55grade @5.00% of weight of mix and including all completion of work as per MORT & Hspecification-508 | 192.5 | cum | 12,798.1 | ₹24,63,634.25 |
| 6 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 945.15 | cum | 87.3 | ₹82,511.6 |
| 7 | Cartage of earth upto 5 km. distance from site with all complete work. | 755.81 | cum | 183.5 | ₹1,38,691.13 |
| 8 | Supply & Fixing granite stone work display board including painting lettering etc | 1 | Job | 7,350 | ₹7,350 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
Tendernotice_2.pdf
PDF • 1.51 MB
BOQ_2206399.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .