| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹19.3 L+₹3.2 L (19.5%)Rejected-Finance VILL R AMRAI 126102 | JIND | JIND | HARYANA | 126102 | 2 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹21,420
Closing Date
29 Dec 2021, 5:00 pmClosed
Executive Engineer, Jind
Jind Water Services Division, Jind
Construction of out of norms V.R. Bridge at RD 7950 Nizampur Bhairon Khera Ramkali Link Drain
2021_HRY_196154_10
8877
Open Tender
Civil Works
Works
120 days
Jind
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹21,420
Yes
5 Mar 2022
17 Dec 2021
30 Dec 2021
17 Dec 2021
29 Dec 2021
17 Dec 2021
Amount
1. Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm in depth, 1.50 mts in width as well as 10 sqm on plan) incluling getting out and disposal of excavated earth lead up to 50 mts and lift up to 1.50 mts as directed by Engineer- in-charge. as per HSR Item No 4.12.1 for all kind of soils
Dressing of bed and preparation of sub grade for lining. HSR Item No 14.1
Centering and shuttering including strutting, propping etc and removal of form work for foundations, footings, bases of columns HSR Item No 6.29.1
Plain cement concrete in open foundations PCC grade M- 15 complete as per drawing and design as per HSR Item No 6.22.2.2
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement contents as per approved design mix, including pumping of concrete to site of laying but exluding the cost of centering and shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of concrete, improve workablilty with out impairing strength and durability as per direction of Engineer-in-charge with cement contents 330 kg per cum for all works up to plinth level. HSR Item No 6.25.1
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement contents as per approved design mix, including pumping of concrete to site of laying but exluding the cost of centering and shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of concrete, improve workablilty with out impairing strength and durability as per direction of Engineer-in-charge with cement contents 330 kg per cum for all works above plinth level up to floor iv level HSR Item no 6.25.2
Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, posts and struts. HSR Item No 6.29.3
Centering and shuttering including strutting propping etc and removal of form work for suspended floors, roofs, landings, balconies, and access platforms. HSR Item No 6.30.3
Providing & fixing in position 20mm thick pre- moulded bituminous joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 mts spans to cater for a movement upto 20 mm covered with sealant complete as per drawing and technical specifications as per HSR item No. 27.51.3
Rehandling or filling available earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering lead up to 50 mts and lift up to 1.50 mts HSR Item No. 4.32
Brick masonary work in cement mortar 1:3 in superstructure complete excluding pointing and plastering as per drawing and technical specifications. HSR Item No 15.6.1
Ist class brick work laid in mud mortar in foudation and plinth. New HSR Item No 18.1
Cement pointing on brick work with cement mortar 1:3 raised and cut pointing (HSR item No.11.25.2)
10 mm Thick cement sand plaster 1:3 HSR Item No 11.4.2
Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carrriage of all material, labour charges, scaffolding, sundries etc complete as per HSR Item No 11.58
Steel reinforcement Thermo-Mechanically Treated bars of grade Fe-500D or more for RCC work including staightening, cutting, bending, binding, placing in position and binding all complete as per HSR Item No 6.34.6
Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter HSR Item No 9.57.2
Excavating, Supplying and filling of local earth (inclusding royality) by mechanical transport up to a lead of 1 Km also including ramming and watering of the earth in layers and not exceeding 20 cm in trenches, plinth, sides of foundation etc complete as per HSR Item No 4.33
Dimolishing RCC work manually / by mechanical means including stacking of steel bars and disposal of unserviciable material with in 50 mts lead and cutting reinforcement bars as per HSR Item No 5.25
Dimolishing cement concrete manually/ by mechanical means including disposal of material with in 50 mts lead as per direction of Engineer-in -charge nominal concrete 1:2:4 or leaner mix (including equivalent cum design mix) HSR Item No 5.23.2
Credit of old and dismentled brick work
Credit of old and removed steel from slabs
THE RAM RAI MAHA LUXMI CO OP L C SOCIETY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .