Tender Value
₹3.4 Cr
EMD Value
₹6.9 L
Closing Date
29 May 2026, 2:00 pmClosed
Executive Engineer, PWD,WD-I(B),DNH,Silvassa
PWD Campus Block No.I(bldg),DNH, Silvassa
External Development Work of Bus Stand At Silvassa, Dadra and Nagar Haveli
2026_UTDNH_8061_1
E-TENDER NOTICE NO.12 OF 2026-27 (BLDG)
Open Tender
Civil Works - Buildings
Item Rate
300 days
UT OF DNH
As per NIT refer
3 documents required · 3 mandatory
₹5,000
Executive Engineer, PWD,WD-I(B),DNH,Silvassa
₹6.9 L
29 May 2026
14 May 2026
29 May 2026
14 May 2026
29 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EXCAVATION upto 1.50 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in dense or Hard soil MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, cutting vegetation up to 1.5m ht if required and disposing off the excavated stuff upto all lead and lift. Note- All types of soil that can be removed by JCB/ Poclain bucket shall be classified under this item. | 1,837.5 | ONE CUBIC METER | - | - |
| 2 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard Murrum MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. | 1,837.5 | ONE CUBIC METER | - | - |
| 3 | FILLING with selected & approved available excavated earth (exluding rock) in excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 3,401.56 | ONE CUBIC METER | - | - |
| 4 | FILLING with selected & approved Murrum material brought by Contractor from outside client's premises, including Identification of Borrow pits and including Royalty charges & or duties as per requirement of local authority, in foundations, excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 18,750 | ONE CUBIC METER | - | - |
| 5 | Boring holes 3.5 m deep in ordinary soil (for cast in situpiles) and getting out the soil and disposal of the surplusexcavated soil as directed within a lead of 50 Meter for
following diameter of pipes (iii) 300 mm | 50 | EACH | - | - |
| 6 | Providing and laying RUBBLE SOLING wherever required in foundation and plinth including hand packing fillings interstices with chips and sand. Watering and compacting to consolidated thickness, etc complete as directed by engineer-in-charge | 201.25 | ONE CUBIC METER | - | - |
| 7 | Providing and laying Granular subbase (GSB) for preparing base of road by providing close graded Material, mixing in a mechanical mix plant at OMC(Optimum Moisture Content), carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete. | 690.06 | ONE CUBIC METER | - | - |
| 8 | Providing and laying PLAIN CEMENT CONCRETE 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) in foundations and superstructure including, machine mixing, leveling compacting, curing and formwork if any, scaffolding, staging etc. complete as directed and instructed by Engineer-in-Charge. Volume of PCC laid to be measured for payment. | 162 | ONE CUBIC METER | - | - |
| 9 | Providing and laying Dry Lean Concrete (DLC) of M15 grade with coarse aggregate not exceeding 25 mm nominal size, including mixing in batching plant/approved mixer, transporting, laying, spreading, compacting with vibratory roller, and finishing to required line, level, grade and camber, complete as per specifications and direction of Engineer-in-Charge. | 822 | ONE CUBIC METER | - | - |
| 10 | Providing and laying separation membrane of 125 micron thick polyethylene sheet of approved quality over prepared surface, including cleaning of surface, laying the sheet with proper alignment, and providing necessary overlaps (minimum 150 mm) at joints.
The membrane shall be laid flat without wrinkles, folds, or creases and properly secured to prevent displacement during subsequent operations. The work includes cutting, jointing, and placing in position complete as per specifications and direction of the Engineer-in-Charge. | 6,280 | ONE SQUARE METER | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.85 MB
BOQ_8253.xls
BOQ • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .