Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.4 LAccepted-AOC MALDA MECHANICAL DIVISION PHE DTE VILLAGE DAULATPUR POST MAHILA NEAR MALDA POLY TECHNIC PIN 732102 | MALDA | MALDA | WEST BENGAL | 732102 | 1 | Accepted-AOC Offered lowest rate. | |
| 2 | 3₹9.5 L+₹1,895 (0.20%)Rejected-Finance NORTH BALUCHAR P O DIST MALDA | MEDINIPUR WEST | WEST BENGAL | 721130 | 3 | Rejected-Finance HIGHER THAN THE L1 | |
| 3 | 3₹9.6 L+₹9,665 (1.02%)Rejected-Finance 18 1 CHANDI CHARAN GHOSH ROAD BARISHA KOLKA 700008 | KOLKATA | WEST BENGAL | 700008 | 3 | Rejected-Finance HIGHER THAN THE L1 |
Tender Value
₹9.5 L
EMD Value
₹18,951
Closing Date
24 Dec 2019, 5:00 pmClosed
Executive Engineer,Malda Arsenic Area W/S Divn,
MALDA ARSENIC AREA W/S DIVISION, P.H. ENGINEERING DIRECTORATE DOULATPUR PHE COMPLEX, MALIHA MALDA-732102
Day to day Operation Maintenance General repair of Raw water pipeline Clear water pipe line distribution system for Mahadipur Bholanathpur Distribution Zone of Gour Mahadipur Arsenic free W S scheme under Malda Arsenic Area W S Divn PHE Dte.
2019_PHED_255886_3
WBPHED/EE/MAAD/NIeT _06 of 2019-2020
Open Tender
CIVIL WORKS
Percentage
366 days
Malda Arsenic Area W/S Divn, PHE Dte.
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,951
Yes
3 Jun 2020
28 Nov 2019
26 Dec 2019
30 Nov 2019
24 Dec 2019
30 Nov 2019
eProcurement System of Government of West Bengal Created By: RAJAT NARAYAN SAHA Created Date/Time: 27-Dec-2019 05:50 PM Tender Title: WBPHED/EE/MAAD/NIeT _06 of 2019-20. SL - 03 Tender ID: 2019_PHED_255886_3
Tender Inviting Authority: The Executive Engineer Malda Arsenic Area W/S Division, P.H. Engineering Directorate, Doulatpur PHED-Complex, P.O. Maliha, District - Malda
Name of Work: Day to day Operation , Maintenance &General repair of Raw water pipeline, Clear water pipe line&distribution system for Mahadipur & Bholanathpur Distribution Zone of Gour Mahadipur Arsenic free W/S scheme under Malda Arsenic Area W/S Divn. PHE. Dte. ( For the period from 01/01/2020 to 31/12/2020 )=366 Days
Contract No: WBPHED/EE/MAAD/NIeT _06 of 2019-20. SL NO - 03
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Banik Brothers 541345376.98 -.12 946403.24 Nine Lakh Fourty Six Thousand Four Hundred and Three
2.00 FUTURE 541345376.98 .08 948298.32 Nine Lakh Fourty Eight Thousand Two Hundred and Ninty Eight
3.00 DEY CONSTRUCTION 541345376.98 .90 956068.15 Nine Lakh Fifty Six Thousand Sixty Eight
Lowest Amount Quoted BY: Banik Brothers(946403.24)
BOQ Summary Details Tender Title: WBPHED/EE/MAAD/NIeT _06 of 2019-20. SL - 03 Tender ID: 2019_PHED_255886_3
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Banik Brothers 946403.24 L1
2 FUTURE 948298.32 L2
3 DEY CONSTRUCTION 956068.15 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .