Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.0 L
EMD Value
₹15,980
Closing Date
5 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ASSISTANT GARRISON ENGINEER (I) AIR FORCE AMRITSAR
ASSISTANT GARRISON ENGINEER (I) AIR FORCE AMRITSAR-143001
REPAIR/REPLACEMENT OF STP PIPE LINES, VALVES AND OTHER CONNECTED WORKS AT AF STN AMRITSAR
2026_MES_781515_2
AGE (I) AF/ASR/T-17/2026-27
Open Tender
Civil Works
Item Rate
120 days
ASSISTANT GARRISON ENGINEER (I) AF STN AMRITSAR
As perr tender documents
8 documents required · 8 mandatory
₹500
AGE (I) AF AMRITSAR
₹15,980
15 Oct 2026
15 Oct 2026
12 Nov 2026
15 Oct 2026
5 Nov 2026
29 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for Cleaning of Coarse Bar screen chamber of size 750X1200X450 mm as described including removal of accumulated screenings, waste, silt and other deposited materials from the coarse bar screen chamber, manual cleaning of screen bars, collection, loading, transportation of waste out outside MoD land as per State Pollution Control Board Norms,washing of the chamber with clean water including all labour, tools as directed by Engr-in-charge | 1 | Each Job | - | - |
| 2 | Material and labour for Cleaning of Fine Bar Screen chamber of size 400X1200X450 mm as described including removal of accumulated screenings, waste, silt and other deposited materials from the coarse bar screen chamber, manual cleaning of screen bars, collection, loading, transportation of waste outside MoD land as per State Pollution Control Board Normswashing of the chamber with clean water including all labour, tools as directed by Engr-in-charge | 1 | Each Job | - | - |
| 3 | Material and labour for Cleaning of settling chamber (Secondary clarifier) of size 1200 X 950 X 1000 mm as described including dewatering, removal of settled sludge, grit,slit and other deposit from the chamber,manual/mechanical cleaning of wall, floor,outlet, collection, loading, transportation and disposal of sludge outside MoD land as per State Pollution Control Board Norms,washing of the chamber with clean water including all labour, tools as directed by Engr-in-charge | 1 | Each Job | - | - |
| 4 | Material and labour for Cleaning and painting of Equalization tank of size 7100 X 7100 X 2500 mm as described including dewatering, removal of settled sludge, grit,slit and other deposit, cleaning of tank floor, wall, inlet and outlet channels, washing and drying of surface,surface prparation by wire scraping to remove rust, old paint and application of one coat of epoxy primer followed by two coats of chemical resistant epoxy paint on all internal RCC walls, floor, MS surfaces,ladders,pipe supports and other steel components,collection , loading, transportation and disposal of removed sludge outside MoD land as per State Pollution Control Board Normsincluding all labour, tools as directed by Engr-in-charge | 1 | Each Job | - | - |
| 5 | Material and labour for Cleaning and painting of MBBR tank of size 2500 X2500 X 5000 mm as described including isolation and dewatering of the tank, removal of MBBR media and storage, removal of settled sludge, biofilm deposits and settled solids, cleaning of tank floor, walls, aeration grid,screens,inlet and outlet arrangements,washing with clean water and refiling up with new filter media in layers all as per maufactures/reommendations/exsiting including testing and commissioning etc. (Media will be paid seperately under particular schedule of BOQ), surface preparation of exposed MS structures by scrapping apllication of one coat of epoxy primer followed by two coats of chemical resistant epoxy paint on all all internal RCC walls, floor, MS surfaces,ladders,pipe supports and other steel components,collection , loading, transportation and disposal of removed sludge outside MoD land as per State Pollution Control Board Norms, including all labour, tools as directed by Engr-in-charge | 2 | Each Job | - | - |
| 6 | Material and labour for Cleaning of Tube Settler of size 5200X3000x2700 mm as described including isolation and dewatering of the tank, removal of tube settler modules,cleaning of tube media, inlet and outlet channels, sludge collection, refixing of tube settler modules, loading, transportation and disposal of removed sludge outside MoD land as per State Pollution Control Board Norms including all labour, tools as directed by Engr-in-charge | 1 | Each Job | - | - |
| 7 | Material and labour for Cleaning and painting of Chlorine Contact tank of size 5200X1700X1500 mm as described including isolation and dewatering of the tank, removal of MBBR media and storage, removal of settled sludge, biofilm deposits and settled solids, cleaning of tank floor, walls, aeration grid,screens,inlet and outlet arrangements,washing with clean water and reinstallation of MBBR media with new (paid seperately under particular schedule of BOQ), surface preparation of exposed MS structures by scrapping apllication of one coat of epoxy primer followed by two coats of chemical resistant epoxy paint on all all internal RCC walls, floor, MS surfaces,ladders,pipe supports and other steel components,collection , loading, transportation and disposal of removed sludge outside MoD land as per State Pollution Control Board Norms including all labour, tools as directed by Engr-in-charge | 1 | Each Job | - | - |
| 8 | Material and labour for Cleaning and painting of Chlorine Dosing tank of size 5200X1700X1500 mm as described including isolation and dewatering of the tank, removal of MBBR media and storage, removal of settled sludge, biofilm deposits and settled solids, cleaning of tank floor, walls, aeration grid,screens,inlet and outlet arrangements,washing with clean water and reinstallation of MBBR media with new (paid seperately under particular schedule of BOQ), surface preparation of exposed MS structures by scrapping apllication of one coat of epoxy primer followed by two coats of chemical resistant epoxy paint on all all internal RCC walls, floor, MS surfaces,ladders,pipe supports and other steel components,collection , loading, transportation and disposal of removed sludge outside MoD land as per State Pollution Control Board Norms including all labour, tools as directed by Engr-in-charge | 1 | Each Job | - | - |
| 9 | (i)S & F in repair of the Chemical Dosing HDPE Tank of 200 Litres chemical dosing system complete all as specified and directed. | 1 | Each Job | - | - |
| 10 | (ii) S & F in repair of agitators for chemical dosing pump system having 20 W Capacity, operational Voltage of 100-240V AC, pressure upto 20 bar alongwith Chemical mixed rod & Plastic Injection pipe complete all as specified and directed. | 2 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
genpages.pdf
Tender Documents • 1.29 MB
appendixb.pdf
Additional Documents • 0.92 MB
BOQ_890592.xls
BOQ • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .