Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.0 L+₹28,751 (2.97%)Admitted-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | L2 | Admitted-Finance | |
| 3 | L3₹10.2 L+₹56,630 (5.85%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹9.7 L
EMD Value
₹20,000
Closing Date
19 Jan 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
D.G. Civil
5, SN, Banerjee Road, Kol-70013
BUILDING RENOVATION WORK AT PBGS, ELECTRICITY DEPARTMENT, 6/1 PALMER BAZAR ROAD IN WARD 55.
2025_KMC_979143_1
KMC/DGC/VI/055/005/2025-2026/R
Open Tender
CIVIL WORKS
Percentage
60 days
Br-VI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹20,000
29 Jan 2026
24 Dec 2025
21 Jan 2026
24 Dec 2025
19 Jan 2026
24 Dec 2025
BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A). ORIGINAL WORKS?.(9)Diagonally woven crushed bamboo mat including durma mat lining and both longitudinal and transverse intermediate stiffners (about 300 mm. centre each way) and tied with 18 B.W.G. galvanised wire fitted and fixed in position complete but excluding costof supporting frame work.(a) In wall fencing etc.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 3. Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly a) 3.90 metre height
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 3. Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly b) Extra for additional 3.6 height or part thereof
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 9)Labour for propping up overhead members as a precautionary measure against falling as directed with necessary planks, Eucalyptus props, packing nails, wire ropes, iron wires etc. including hire charges of all materials fitting, fixing dismantling and removing the props etc and all ancillary works in this connection complete. (Payment to be made on volume measurement considering the hight and contact area)
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof.
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. b) Extra rate for each addl. Floor over the rate of ground floor
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 11. Post Constructional Measures :(e) Spot application for insecticides using Aqua base spray for pest (for bugs, cockroaches, silverfish, spider, termites, mosquitoes) to walls and ceiling etc.with chemical emulsion by admixing chloropyrofos emulsifiable concentrates (1% concentration) with water by weight including spraying the emulsified chemical @ 0.5 litres per sq.m. by a hand operated pressure pump on wall surfaces, ceiling, electrical fixture,electrical lines including drilling holes inplaces where source of termite is detected squirting chemical solution into the holes and sealing the holes with cement grout. (Rate is per sq.m. of the floor area while actual work will be all walls ceiling, rack,partition and furniture).
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC.B. MISCELLANEOUS ITEMS 1 Labour for Chipping of concrete surface before taking up Plastering work.
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(6)Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).Using grey cement.(iii) 35 mm. thick.(Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A).
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC.B. MISCELLANEOUS ITEMS 4.Making V-groove line ( 12 mm wide,12 mm deep) in plastered surface.
BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . D. REPAIR & REHABILITATION 3. Repairs to roof cracks with cement and sand mortar (1:4)including cutting grooves and cleaning cracks and grouting the cracks with neat cement before repairs. (Cement 0.63 Kg/Mtr. )
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (a) 25 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS (E) ROOFING, SHEET WALLING &WATERPROOF TREATMENT . B. WATERPROOF TREATMENT 4. Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification onsmooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility < -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor. ( 3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 14. Add extra for basement and each additional floor over the rate for ground floor on item Nos. 5 to 10 and 13 of subhead A (a) Upto 4th floor
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?27?..Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge....b) 25 mm thick
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster (3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS(R) ALUMINIUM WORKS??(15)Supplying,fitting & fixing of 2-Track / 3-Track Aluminium sliding Window of all Aluminium sections viz. window frame (top,bottom & side frame), shutter (top, bottom, side & interlock member) made of aluminium alloy extrusions conforming to IS 733-1983 & IS 1285-1975, annodised conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminium 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron thickness Annodizing film Natural white. For 2-Track window : Members for Bottom frame @ 0.875 Kg per Mtr. and for Top and Side frame @ 0.778 Kg per Mtr. and for shutter Bottom and Top member @ 0.472 Kg per Mtr., Style side member @ 0.493 Kg per Mtr. and Interlock member @ 0.612 Kg per Mtr. For 3-Track window : Members for Bottom frame @ 1.233 Kg per Mtr.and for Top and Side frame @ 1.067 Kg per Mtr. and for shutter Bottom and Top member @ 0.472 Kg per Mtr., Style side member @ 0.493 Kg per Mtr. and Interlock member @ 0.612 Kg per Mtr. [Note : for estimate purpose construction wing may consider weight of 2-track Aluminium window @ 5.5 Kg per Sq.M.and 3-track Aluminium window @ 6.5 Kg per Sq.M]
BUILDING WORKS(L) GLAZIER'S WORK?..(A)... ORIGINAL WORKS?.(1)Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete. (In all floors for internal wall & upto 6m height for external wall)(i) 3 mm thick (weighing 7.4 kg/Sq.m)
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 19. (a) Supplying, fitting and fixing steel rolling shutter profile type with 18 B.G . of approved type steel latche section 75mm wide, fitted with coil wire spring to necessiate the fitting of required Nos. of C.I. Pulleys on heavy type solid drawn seamless steel tube complete with locking arrangements both inside and outside specially builtup side guide channels including providing a hood for the steel rolling shutter in the room, painting two coats of approved aluminium paint over a coat of red lead primer complete. 1. (Measurement will be made on the area of opening covered by the rolling shutter corrected upto 2 decimal.) 2. Payment of painting to be separately. (3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS (G) WOOD AND PVC WORKS E. REPAIR WORKS 30.Labour for taking out door and window frame including shutter for repair orreplacement of different parts of the frame & refixing the same including mending good all damaes complete. (Concrete and brick work for mending damage will be paid separately)(a) Upto area 2.5 Sq.m
BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 1. Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (f) Sishu, Gamar, Champ, Badam, Bhola, Mogra, Hallak Note: Extra for Lifting Charges for each additional floor, i) Rs. 200/- per Cu.m (upto 4th floor) ii) Rs.250/-(above 4th floor)
BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 1. Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings.In ground floor. (In case of non-supply of single plank, penal rate of reduction of 20% will be made) (iii) 35mm thick shutters with 19mm thick panel of size 30 to 45 cm. (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Note: i) Lifting Charges for upper floors refer item H (2). (ii) In case of panel with Rly. Type batton the rates will be reduced by Rs.20.00 /Sq.m.)
BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 3. Supplying, fitting and fixing fibre reinforced polymer (FRP) Composite door frame as per approved section with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to safisfy IS: 4020 door testing performance criteria (i) 66mm x 90mm
BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 14. Supplying, fitting & fixing fibre reinforced polymer (FRP) Composite door shutters as per approved design with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to satisfy IS:4020 door testing performance criteria. In ground floor (i) 32 mm thick. (For upper floors refer to item H(4) also)
(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(6)Supplying, fitting and fixing Flat back urinal (half stall urinal) in white vitreous chinaware of approved make in position with brass screws on 75 mm X 75 mm X 75 mm wooden blocks complete.(ii) 470 mm X 280 mm X 340 mm
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 7. Supplying, fitting and fixing bib cock or stop cock. (a) (i) Chromium plated Bib Cock short body (Equivalent to Code No. 511 & Model - Tropical / Sumthing Special of ESSCO or similar brand).
(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(4)Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding 'P' or 'S' trap (excluding cost of concrete for fixing).(ii) 530 mm X 410 mm
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(14)Supplying,fitting and fixing cast iron 'P' or 'S' trap conformimg to I.S. 3989/ 2009 and 1729/ 2002 including lead caulked joints and painting two coats to the exposed surface. (Painting to be paid seperately).(A) 'P' Trap (i) 50 mm
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(23)Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992.(A)(i) Single Socketed 3 Metre Length.(b) 110 mm.
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(23)Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992.(B) Fittings.x) Bend 87.5....(b) 110 mm
SECTION (A) - PLUMBING WORKS (A)-(IV) CISTERN, G.I.TANKS WITH PARTS Item No. (a) Original Works Supplying, fitting and fixing 10 litre porcelain low-down cistern of approved make without fittings and brackets.
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(I) Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (a) For Exposed Work PVC Pipes (Dia) (a)15 mm
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(I) Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (a) For Exposed Work PVC Pipes (Dia) (c)25 mm
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 7. Supplying, fitting and fixing bib cock or stop cock. (b) (i) Chromium plated Stop Cock (Equivalent to Code No. 513(A) & 513(B) & Model - Tropical / Sumthing Special of ESSCO or similar
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 18. Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessary holes, chasing etc. in walls, floors etc. and making good damages complete. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) In ground floor. (Payment will be made on the area of the gate covered by two guard rails and two extreme channels) (3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25%for each addl. floor above 4th floor) (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking thephysical weight of fabricated grill and dividing the same by covered area of the same. N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld. (3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(20)Supplying, fitting and fixing 18 mm. to 22 mm. thick kota stone slab in wall, dado in 15 mm thick [avg] cement mortar (1:3) including making suitable arrangement to hold the stone properly by brass / copper hooks including pointing in cement mortar (1:2) (1 cement : 2 marble dust) with admixture of pigments matching the stone shade, including grinding and polishing all complete as per direction of Engineer-in-charge including cost of materials, labour, scaffolding, staging, curing complete. [Using cement slurry for bedding @4.4 kg/Sq.m and for jointing @1.8 kg/Sq.m] (3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles includingroughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall. With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (b) Area of each tile above 0.09 Sq.m (i) Coloured decorative. Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m (3rd Corrigenda & addenda dated 04.06.2018)
SECTION(A) PLUMBINGWORKS (A)(V) BASIN AND SINKS WITH PARTS (a) Original Works 2 Supplying, fitting and fixing white vitreous china best quality approved make wash basin with C.I. brackets on 75 mm X 75 mm wooden blocks, C.P. waste fittings of 32 mm dia., one approved quality brass C.P. pillar cock of 15 mm dia., C.P. chain with rubber plug of 30 mm dia., approved quality P.V.C. waste pipe with C.P. nut 32 mm dia., 900 mm long approved quality P.V.C. connection pipe with heavy brass C.P. nut including mending good all damages and painting the brackets with two coats of approved paint. (ii) 550 mm X 400 mm size
BUILDING WORKS(M) DRAIN, DOWN PIPES, CHIMNEY ETC?.(C). ADDITIONAL RATE?(21)Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.A) UPVC Pipes:(ii) 110 mm. Dia.
BUILDING WORKS(M) DRAIN, DOWN PIPES, CHIMNEY ETC?.(C). ADDITIONAL RATE?(21)Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.B) UPVC Fittings:c) Bend 87.5 degree. (ii) 110 mm. Dia
SECTION(A) PLUMBINGWORKS (A)(IV) CISTERN,G.I.TANKS WITH PARTS (a) Original Works 6 Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer (b) 1000 litre capacity
SECTION (A) - PLUMBING WORKS (A)-(III) CPVC PIPE WORKS AND FITTINGS Supply of Chlorinated Polyvinyl Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007Q) Ball Valve (c) 25mm
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 7 Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) (a) One Coat i) Water based interior grade Acrylic Primer.[This item to be done under specific instruction of the Superintending Engineer]
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 10 Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : With other than hi-gloss of approved quality-(iv) Two coats (with any shade except white)
SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor:(a) One Coat [This item to be done under specific instruction of the Superintending Engineer]N.B.:-Extra for each additional floor in external walls refer item 1 of subhead C
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Estimated amount
Add: 9%SGST
Add: 9%CGST
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_2386573.xls
BOQ • 0.37 MB
FORM.pdf
Tender Documents • 0.20 MB
C1.pdf
Tender Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .