Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 627 BAKSHI KHURD DARAGANJ TEHSIL SADAR PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical TENDER CONDITION NOT QUALIFIED |
Tender Value
₹11 L
EMD Value
₹11,000
Closing Date
17 May 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, EDCH, MVVNL
SE, EDC, ASHA NAGAR, HARDOI(UP)
Increasing Capacity of 2 5 to 1 5 1 10 of 33 11 KV S s UPSIDC Old Sandila and Bifurcation of 11 KV outgoing feeder AND its associated work Under Jurisdiction of Electricity Distribution Division-Sandila, Hardoi.
2021_MVVNL_577335_2
180/EDC(H)/2020-21
Open Tender
Miscellaneous Works
Item Rate
180 days
HARDOI
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹3,540
A/C No. 11102369142 , IFSC Code SBIN 0000649
₹11,000
2 Jun 2021
30 Apr 2021
18 May 2021
30 Apr 2021
17 May 2021
30 Apr 2021
180 days
Amount
Carriage of all the concerning material from store centre to JE's dump store & from dump store to the site work including loading, unloading and proper stacking at the site etc.
33 KV VCB with Structure
33 KV Lightening Arrestor
Incoming 600/300/5A 350 MVA
Outgoing 300/100/5A 350 MVA
11 KV 3x300 sq. mm. XLPE Cable
11 KV 3x185 sq. mm. XLPE Cable
ST Pole 11 Mtr
ACSR rabbit Conductor
Shifting of line isolator structure and all other material from store to site
Safe Loading and Carriage of 10 MVA Transformer from store to site
Transformer Work
Construction of Plinth of size 3.46x3.46 Mtr. Suitable for 10 MVA T/F above ground level, 0.5 Mtr. The Work including excavation of foundation, base concreting in CC 1:6:12 ratio (cement, fine sand & brick ballast) first class brick work in cement mortar of ratio 1:4 foundation CC in 1:4:8 ratio (cement, coarse sand and sore grit of 20 mm gauge using MS Bars of 10 mm dia (for) in reinforcement including its cutting bending & binding in required shape. The work also includes 2 Nos, 3.46 Mts. Long each rail places complete with cutting welding & proper fitting etc.
Safe Installation and erection of 10 MVA Transformer on plinth
ISOLATOR STRUCTURE: reparing of isolator structure properly finished with smoothening of edges.
LIGHTENING ARRESTOR & P.I.: repairing of lightening arrestor & P.I. structure and installation and commissioning properly finished with chambering of edges etc.
C.T.: repairing structure and installation and commissioning properly finished with chambering of edges etc.
PLINTH FOR VCB: Repairing of VCB structure and installation and commissioning properly finished with chambering of edges etc. per Nos.
Earthing by way of boring and lowering of "B" class GI pipe 50mm dia from ground upto the water level (minimum 80 meter deep) as per standard practice earthing including material supplied by contractor.
Fabrication and grouting of M.S. Angle 65x65x6mm in L shape & in proper size and alignment to provide support for the two separate earthing strips for power transformer neutral including supply and fixing of two nos. Flexible copper bonds for natural ear thing.
Fabrication and erection of cable support made of two pieces of M.S. channel 100x50 mm, 03 Mtr. Long joined to each other by means of 5 Nos. M.S. Flat 50x6 mm places of size 150 mm long each by welding at equal intervals as per drawing and grouting ready mixed primer and two coats of aluminium paint. This includes providing of four nos M.S. clamp made of M.S. flat holding the cable including nuts and bolts and fixing of XLPE Cable.
INSTALLATION OF ISOLATORS: Assembling and installation of line/bus isolator on the isolator structure adjusting of opening mechanism in proper alignment so as to ensure smooth operation of the same in case of line isolator proper operation of earth links shall also be insured. The work includes fabrication for proper flexing if required.
INSTALLATION OF LIGHTENING ARRESTORS: Assembling and installation Mounting of 3 Nos. (1 set) lightening arrestors on the L.A. Structure complete with making earth connections (separate0 and line connections the work includes fabrication for proper fixing if required.
INSTALLATION OF POST INSULATOR: Assembling and installation Mounting of 6 Nos (1 se) Post Insulator on the PI. Structure complete with making earth connections (separate) and line connections the work includes fabrication for proper fixing if required
INSTALLATION OF CT: Installation of 3 Nos. (1 set) CT’s on the/Ct’s structure. Along with C.T. J/B. The work includes fabrication for proper fixing if required.
INSTALLATION OF VCB: Installation of 33 KV VCB complete works including commissioning.
INSTALLATION OF SWITCHGEARS IN CONTROLROOM: Shifting carefully & safely 11 kv I/C & O/G switchgear, 11 KV Bus Coupler from outside of the switchgear room, including grouting the two No. 100x50x6mm channels pieces (each 800 mm long including cutting to size) and foundation bolts in 1:2:4 CC (Including cutting of CC of the floor and finishing of floor) as per direction of Engineer in charge, placing and fixing of switchgear on foundation providing G.I. Nuts & Bolts of proper size in proper position and alignment and checking, complete work with Mounting of P.T. incoming S/G.
Fixing and making bus bar connection in between all switchgears after cleaning and tapping with H.T. Tape, empire tape and PVC Tape properly, providing and fixing of 6mm thick Bakelite separat9ors and plugging of all opening & holes with plastic compound complete work including cost of all material (except copper Bus Bars) strictly to the satisfaction of site in charge.
EARTHING OF 11 KV & 33 KV SWITCHGEARS Laying of earth mate for earthing of indoor equipments by means of M.S. strip 50x6mm connecting to Pipe type earthing as per RESSPO norms. Joints will be welded with high quality are welding.
Supply & Installation of 24 Volt 15 AH Battery and Battery Charger & its commissioning.
Fabrication and erection of Outgoing Feeder D/P for 11 KV Line. On 11 m long ST. Pole with fixing of necessary clamp & other accessories like one no. To-p channel 100x50. Angle 65x65x6mm its grouting 300mm above ground Level, painting of pole contractor shall provide necessary clamps & other accessories.
Opening of Jumpers of HV side, LV side 11 KV cable of 5 MVA T/F and earthing strip of T/F neutral bracket & 11 KV cable stand and Safe dragging of 5 MVA T/F from plinth to safe place in/out of the switch yard including draining of oil from radiator & opening of radiator. (Oil Drum arrange by the contractor.)
H.T. CABLE LAYING: Laying & dressing of 11 KV 3x300 sq. mm underground cable from 10 MVA T/F to 11 KV incoming switchgear in the trench 450 mm wide, 900 mm deep providing 150mm fine sand, cushion beneath and 150mm fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & stone slab. The work includes supplying of fine sand, bricks and stone slab are refilling and ramming of the left out soil, closing the trench and levelling.
Erection & Commissioning & Stringing of 11 KV Line
Fabrication, erection of 11 mtr long Double Pole with fixing of necessary clamps, dropper channel, top channel, angle & all accessories required including supply and fixing and digging of pit as well as grouting and plinthing of pole as per RESPO norms with hoisting of cable
Erection of ST pole 11 mtr long
Stringing of three phase 11 KV line.
Grouting and Nozzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick, blast & cement). All material except stay wire shall be supplied by the contractor.
Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except rod shall be supplied by the contractor.
Looping & chopping of tree branches for clearance of HT/LT line after clearance of line throughout pieces of tree branches of site (Approx 160 M.)
XLPE Cable laying charge 3x300 Sq.mm. (Kaccha) with bricks and stone
GI Pipe 6 "dia
11 KV 3x185 sq. mm. XLPE Cable
33 KV high pressure testing
Cost PF Guarding for 11 kV H.T. Line overhead Line for Spam of 40
Painting of substation all structures
Supply & Fixing of Cable jointing kit With fitting
Cost of rubber mat seat 8/10 mm, 2x4 mtr
Re-hoisting of 11 KV 3x300 sq mm cable on cable stand & 11 KV switch gear without M.S. Pipe.
Dismantling of existing cable stand and re-erection, grounting and plinthing of existing cable stand after placement of T/F.
Dismantling of existing Natural stand and re erection, grounting and plinthing of existing neutral stand after placement of T/F including providing & fixing copper bond ( All material shall be providing by contractor etc.
Jumpering HV & LV Sadie of new installed T/F with 1x630 sq. mm. PVC Cable including providing of Lugs, L piece/ connector etc.
M/s Khushi Enterprises
A. A. ENGINEERING CO.
Sidhi Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .