| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC | ₹15.4 L Quoted ₹13.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.3 LRejected-AOC NO 162 KARUMARIAMMAN KOIL STREET ATHIPATTU PUDU NAGAR CHENNAI 600 120 | THIRUVALLUR | TAMIL NADU | 600120 | ₹14.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C. PARTHIBAN CONTRACTOR L2 | RST Global Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning the surface of road by removing all waste, debris etc., and make the surface neat and clean to lay concrete including cost of all labour, lead, lift T&P etc., | 626.3 | m2 | 15 ₹9,394.5 | 13 ₹8,141.9 Lowest |
| 2.00 | Chipping the road and roughening the surface to receive patch concrete including cost of all materials, labour, lead, lift, etc., complete. | 626.3 | m2 | 55 ₹34,446.5 | 48 ₹30,062.4 Lowest |
| 3.00 | Supplying, cutting, bending, tying and placing in position of required dia RTS rods, lead, lift, transporting, binding wire, welding operation etc., complete as instructed by the Engineer at site. | 1,747 | Kgs | 103 ₹1,79,941 | 95 ₹1,65,965 Lowest |
| 4.00 | Providing M15 design mix concrete with minimum cement content of 250 kg/cum using 10 to 12 mm HBG metal including cost of all concrete, pump, admixtures, shuttering, lead, lift, Curing, labour charges, etc., complete. | 125.3 | m3 | 7,655 ₹9,59,171.5 | 7,050 ₹8,83,365 Lowest |
| 5.00 | Dismantling the existing concrete by using deploying machineries for providing drain to avoid the water stagnation infront of A/C Plant including cost of all labour, lead, lift, etc complete. | 1.8 | m3 | 4,025 ₹7,245 | 3,950 ₹7,110 Lowest |
| 6.00 | Earth work excavation in all soils, such as sand, silt, or other loose soil, light black cotton soil and ordinary earth including depositing the excavated earth away from the site with 1 Km lead over an initial lead of 10 m and a lift of 2m, levelling the area, including cost of all labour, lead, lift, etc complete. | 22.2 | m3 | 189 ₹4,195.8 | 172 ₹3,818.4 Lowest |
| 7.00 | Providing PCC 1:3:6 using O.P Cement and 20 mm HBG metal including cost of all materials, lead, lift, labour charges, etc., complete. | 5.6 | m3 | 6,885 ₹38,556 | 6,700 ₹37,520 Lowest |
| 8.00 | Brick work in CM 1:5 using Fly ash brick including cost of all materials, T&P, lead, lift etc., complete and as directed by Engineer in charge at site. | 17.1 | m3 | 6,890 ₹1,17,819 | 6,700 ₹1,14,570 Lowest |
| 9.00 | Plastering with CM 1:5, 12mm thick for Brick wall including cost of all materials, T&P, lead, lift, curing etc., complete and as directed by site Engineer incharge of the work. | 251.6 | m2 | 307 ₹77,241.2 | 290 ₹72,964 Lowest |
| 10.00 | Providing RCC Precast slab of M20 Grade (1:1.5:3) for road crossing drain using O.P Cement and 12 to 20mm HBG metal including cost of all materials, lead, lift, labour charges, shuttering charges etc., complete as instructed by the Engineer at site. | 0.5 | m3 | 13,590 ₹6,795 | 13,000 ₹6,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,400
Closing Date
21 Oct 2024, 2:00 pmClosed
SE CM NCTPS II
Office of SE CM NCTPS II Chennai-120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Raising the floor level by Providing RCC to avoid water stagnation at 0m level of Mill repair bay in front of A/C plant
2024_EB_491614_1
SE/CM/NCTPS-II/EE/CM/ 20/2024-25
Open Tender
Civil Works
Works
120 days
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,400
Yes
15 Jul 2026
7 Oct 2024
22 Oct 2024
7 Oct 2024
21 Oct 2024
7 Oct 2024
Amount
Cleaning the surface of road by removing all waste, debris etc., and make the surface neat and clean to lay concrete including cost of all labour, lead, lift T&P etc.,
Chipping the road and roughening the surface to receive patch concrete including cost of all materials, labour, lead, lift, etc., complete.
Supplying, cutting, bending, tying and placing in position of required dia RTS rods, lead, lift, transporting, binding wire, welding operation etc., complete as instructed by the Engineer at site.
Providing M15 design mix concrete with minimum cement content of 250 kg/cum using 10 to 12 mm HBG metal including cost of all concrete, pump, admixtures, shuttering, lead, lift, Curing, labour charges, etc., complete.
Dismantling the existing concrete by using deploying machineries for providing drain to avoid the water stagnation infront of A/C Plant including cost of all labour, lead, lift, etc complete.
Earth work excavation in all soils, such as sand, silt, or other loose soil, light black cotton soil and ordinary earth including depositing the excavated earth away from the site with 1 Km lead over an initial lead of 10 m and a lift of 2m, levelling the area, including cost of all labour, lead, lift, etc complete.
Providing PCC 1:3:6 using O.P Cement and 20 mm HBG metal including cost of all materials, lead, lift, labour charges, etc., complete.
Brick work in CM 1:5 using Fly ash brick including cost of all materials, T&P, lead, lift etc., complete and as directed by Engineer in charge at site.
Plastering with CM 1:5, 12mm thick for Brick wall including cost of all materials, T&P, lead, lift, curing etc., complete and as directed by site Engineer incharge of the work.
Providing RCC Precast slab of M20 Grade (1:1.5:3) for road crossing drain using O.P Cement and 12 to 20mm HBG metal including cost of all materials, lead, lift, labour charges, shuttering charges etc., complete as instructed by the Engineer at site.
C. PARTHIBAN CONTRACTOR (BID ID -1168779)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].