Tender Value
₹21.7 L
EMD Value
₹44,000
Closing Date
31 Aug 2026, 11:15 am7d left
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
2026_DOA_173851_1
DSWC/SAN/2026-27/21
Open Tender
Pipe Laying Works
Percentage
180 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹1,500
₹44,000
19 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
FINANCIAL BID NO.: DSWC/SGR/2026-27/21
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 250 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Khandebad (C/o 81803/81961/R , Tehsil Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2103.3 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1845 /Mtrs 70 Rupee Seventy Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 738 /Joints 91.92 Rupees Ninty One and ninty two Paise Only 30 11.77 50
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (250mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 0 -
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (250 mm) 18 /Cut hole 62 Rupees Sixty Two Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 9 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (250mm) 18 /Riser & Valve 437.6 Rupees Four Hundred Thirty Seven and Sixty Paise Only
Fixing of PUMP STAND (900 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 4 /Pump Stand 6729.01 Rupees Six Thousand sevan Hundred twnity nine and zero one only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 9 /Air pipe 288.4 Rupees Two Hundred Eighty Eight and forty Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3852.97 Rupees Three Thousand Eight Hundred fiftyThree and Ninty Seven Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5112.35 Rupees Five Thousand One Hundered twelve and three five Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5049.1 Rupees Five Thousand Forty Six and Sixty Two Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 210.1 Rupees Two Hundred and Ten Paise Only
RCC Slab 1:2:4 0.21 cum 8209.96 Rupees Eight Thousand Two Hundred Nine and Ninty Six Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for one Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Fixing of gate valve (250 mm) 6 each 1223.24 Rupees One Thousand Two Hundered Twenty Three and Twenty Four Paise Only
Nimar for jointing the pipe (250mm) 47.97 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 102.23 per tonnes 160.3 Rupees One Hundred Sixty and Three paise only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Dudiya (C/o 13170/L), Tehsil lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 304.43 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 205 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 82 /Joints 208.54 Rupees Two Hundred eight and five Four Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2777.03 Rupees Two Thousand Seven Hundered Seventy Seven and Three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 3 /Cut hole 105 Rupees One hundered Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 1 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 3 /Riser & Valve 703.74 Rupees Seven Hundred Three and Seventy Four Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 1 /Air pipe 286.35 Rupees Two Hundred Eighty Six and Thirty Five Paise Only
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Fixing of gate valve (400 mm) 1 each 2048.75 Rupees Two Thousand Forty Eight and Seventy Five Paise Only
Nimar for jointing the pipe (400mm) 11.31 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 20.496 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - FATEHGARH (C/o 29230-R)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 4441.5 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 2520 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 299.8 Rupees Two Hundred Ninety Nine and Twenty Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (500 mm) 22 /Cut hole 127 Rupees One Hundred Twenty Seven Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 10 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (500 mm) /Riser & Valve 899.5 Rupees Eight Hundred Ninty Five Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 289 Rupees Two Hundred Eighty Eight Only
Fixing of Gate valves with C.C 1:2:4 (500 mm) 14 /Gate Valve 2283 Rupees Two Thousand Two Hundared Seventy Eight and Fifty Paise Only
Fixing of PUMP STAND (1200 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 7 /Pump Stand 6667 Rupees Two Thousand Four Hundared Fifteen Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3870 Rupees Three Thousand Eight Hundred Seventy Only
Plain Cement Concrete 1:2:4 0.14 cum 5104 Rupees Five Thousand One Hundred Four Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5045 Rupees Five Thousand Fourty Five Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.1 Rupees Two Hundred Two and Ten Paise Only
RCC Slab 1:2:4 0.21 cum 8200.5 Rupees Eight Thousand Two Hundred and Fifty Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 212.89 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 389.258 Ton 209.86 Rupees Two Hundred Nine and Eighty Six Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Arkwas (C/o 201162-L)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2056.73 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1385 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 208.15 Rupees Two Hundred Eight Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 11 /Cut hole 105 Rupees One Hundred Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 6 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400 mm) /Riser & Valve 706 Rupees Seven Hundred Seven Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 287 Rupees Two Hundred Eighty Nine Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 6 /Gate Valve 2051 Rupees One Thousand Four Hundared Fifty Five and Forty Six Paise Only
Fixing of PUMP STAND (1100 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 3 /Pump Stand 6624 Rupees Two Thousand One Hundared Seventy Three and Ninty Eight Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3874 Rupees Three Thousand Eight Hundred Seventy Nine Four Only
Plain Cement Concrete 1:2:4 0.14 cum 5114 Rupees Five Thousand One Hundred Fourteen Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 4566.4 Rupees Four Thousand Five Hundred Sixty Six and Forty Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.35 Rupees Two Hundred Two and Thirty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8210 Rupees Eight Thousand Two Hundred Ten Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 76.452 Kg 60 Rupees Sixty Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Bishanpura Khokhar (C/o 11000-L)(Extension), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 222.75 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 150 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 208 Rupees Two Hundred Eight and Sixty Six Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 1 /Cut hole 105 Rupees One Hundred Twenty Seven Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 1 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400 mm) /Riser & Valve 710 Rupees Seven Hundred Ten and Forty Three Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 289 Rupees Two Hundred Eighty Nine and Twenty Six Paise Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 1 /Gate Valve 2055 Rupees Two Thousand Fifty Five and Forty Three Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3881 Rupees Three Thousand Eight Hundred Eighty One Only
Plain Cement Concrete 1:2:4 0.14 cum 5132 Rupees Five Thousand One Hundred Thirty Two Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5050 Rupees Five Thousand Fifty Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.5 Rupees Two Hundred Two and Fifty Paise Only
RCC Slab 1:2:4 0.21 cum 8226 Rupees Eight Thousand Two Hundred Twenty Six Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 8.28 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 0 Ton 209.86 Rupees Two Hundred Nine and Eighty Six Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Grand Total (A+B+C+D+E) 1598520 501017 69230
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
NITUGPL262721.pdf
Tender Documents • 0.52 MB
FBUGPL262721.xls
Additional Documents • 0.17 MB
DNITUGPL262721.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].