All Bids
RequiredContractors are eligible as per G.O Ms. No. 21, dated: 13-04-2017 issued by Govt. of Telangana
RequiredElectrical contractor?s should have Electrical Grade ? A or B License.
RequiredPAN allotment reference
RequiredGST registration.
RequiredThe tenderer who have quoted more than 25 percentage less over ECV has to upload the DD towards ASD, the DD should be drawn after tender notification in favour of Commissioner, GHMC. If the tenderer who ever quoted less below 25 percentage of ECV should upload the undertaking letter. If any tender uploaded undertaking and found that he has quoted less by more than 25% estimate values shall be l
RequiredContractor has to submit Consent letter for taking responsibility for any kind of electrical incidents, and arrange the sufficient number of electricians for attending the faults, during the entire contract period
RequiredContractor has to submit single D.D from concern agency only. If not, the Agency will be rejected.
RequiredEven though the tender meet the above qualification criteria , they are subject to be disqualified if they have made misleading or false representation in the forms, statements and attachments submitted in proof of the qualification requirements
RequiredThe bidder should upload required documents only as per tender conditions if uploaded un necessary documents. the agency will be rejected.
RequiredVerification Protocols: The Contractor shall produce detailed verification protocols for all citizen participants. Verification shall include either physical verification or video call verification, supported by valid identity proof issued by any Government authority.
RequiredPenalties for Manipulation: In the event that any manipulation, falsification, or irregularity is detected in the social audit or verification process at any stage, suitable penalties shall be imposed on the Contractor, which may include blacklisting and other actions as deemed appropriate by the Competent Authority.
RequiredThe Successful Bidder shall ensure that all temporary / decorative lights are switched OFF before 06:00 AM every day without fail. If any light is found glowing during daytime, it will be treated as day burning and penalty shall be imposed. The penalty amount shall be deducted from the contractor?s work bill. Repeated violations will attract further action as per tender conditions.