Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
1 Oct 2026, 6:00 pm
Executive Engineer
Irrigation Division Pulwama
LIS Barsoo- Modernization from RD 0 to 500 mts and RD 500 to 1500 mts
2026_IFC_323903_4
NIT 14 of 2026-27
Open Tender
Civil Works
Percentage
90 days
Irrigation Division Pulwama
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
Executive Engineer
₹2.8 L
8 Sept 2026
8 Sept 2026
2 Oct 2026
8 Sept 2026
1 Oct 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: | 42.39 | Cum | 479.3 | ₹20,317.53 |
| 2 | Earth work in bulk excavation by manual means over areas(exceeding 30 cm in depth as well as 10 sqm on plan)including disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by Engineer-in-charge.All kinds of soil. | 532.1 | Cum | 592.9 | ₹3,15,482.09 |
| 3 | Earth work in bulk excavation by mechanical means(hydraulic excavator) over areas(exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m,as directed by Engineer-in-Charge. | 1,016.16 | Cum | 187.3 | ₹1,90,326.77 |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked materials. | 4.46 | Cum | 89.75 | ₹400.29 |
| 5 | Excavating,supplying anf filling of local earth(including royalty)mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenching,plinth,sides of foundation etc.complete. | 115.2 | Cum | 276.6 | ₹31,864.32 |
| 6 | Silt clearance from canals.Inclusive of initial lead and lift(50 m & 1.50 m) Dry | 163.71 | Cum | 111 | ₹18,171.81 |
| 7 | Boring with hydraulic pilling rigs with power units, providing and installing cast-in-situ single under
reamed pile of specified grade concrete mix diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc all complete (Length of pile for payment shall be measured upto the bottom of pile cap).400 mm dia piles M-25 (A) For foundation block | 90 | R M | 3,555.15 | ₹3,19,963.5 |
| 8 | Providing and laying stone soling tightly hand packed under foundations footing etc. including carriages of materials from source to site of work complete in all respects. | 140.58 | Cum | 937.9 | ₹1,31,849.98 |
| 9 | Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering all works upto plinth level.1:4:8 (1 cement: 4coarse sand:8 graded stone aggregate 20mm nominal size) crushed aggregrate | 116.17 | Cum | 5,202.9 | ₹6,04,420.89 |
| 10 | Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering all works upto plinth level1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed aggregrate | 405.46 | Cum | 5,733.6 | ₹23,24,745.46 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_1091694.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .