Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.3 LAdmitted-Finance | ₹41.3 L | L1 | Admitted-Finance |
| 2 | L2₹44.2 L+₹2.9 L (7.06%)Admitted-Finance | ₹44.2 L+₹2.9 L (7.06%) | L2 | Admitted-Finance |
| 3 | L3₹49.6 L+₹8.3 L (20.0%)Admitted-Finance | ₹49.6 L+₹8.3 L (20.0%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Malik Brothers Electrical Contractor and Suppliers L2 | M/S RATHER CONSTRUCTIONS AND TRADERS L1 | M/S BRIGHT WAVE L3 |
|---|---|---|---|---|---|---|
| 2.00A-SUPPLY PART | ||||||
| 3.00PERMANENT RESTORATION OF HT LINES /TAPS IN Bhella Chiralla FEEDERS | ||||||
| 4.00 | 9 Mtr. Long Pole (ST-410 SP33) | 55 | Nos | 10,72,500 ₹10,72,500 | 8,52,500 ₹8,52,500 Lowest | 11,27,500 ₹11,27,500 |
| 5.00 | Channel X-arm including clamps and braces | 1,210 | Kg | 1,51,250 ₹1,51,250 | 1,21,000 ₹1,21,000 Lowest | 1,51,250 ₹1,51,250 |
| 6.00 | 30 mm² ACSR Conductor | 13.7 | km | 1,37,000 ₹1,37,000 Lowest | 4,65,800 ₹4,65,800 | 2,05,500 ₹2,05,500 |
| 7.00 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting
Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 165 | Nos | 11,000 ₹33,000 Lowest | 16,500 ₹49,500 | 11,000 ₹33,000 Lowest |
| 8.00 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 55 | Nos | 16.5 ₹5.5 Lowest | 82,500 ₹27,500 | 16.5 ₹5.5 Lowest |
| 9.00 | Nuts and Bolts | 55 | kg | 6,600 ₹6,600 Lowest | 8,800 ₹8,800 | 6,600 ₹6,600 Lowest |
| 10.00PERMANENT RESTORATION OF LT LINES /TAPS OF Bhella Chiralla FEEDERS | ||||||
| 11.00 | 8 Mtr. Long Pole(ST-410 SP15) | 127 | Nos | 22,22,500 ₹22,22,500 | 14,60,500 ₹14,60,500 Lowest | 23,49,500 ₹23,49,500 |
Tender Value
₹40.2 L
EMD Value
₹80,500
Closing Date
8 May 2026, 4:00 pmClosed
XEN ED Doda
ED DODA
Survey, Supply, Transportation, Erection, Testing and Commissioning for permanent Restoration of Infrastructure Damaged due to flash floods in the month of Aug 2025 in respect of Bhella Chiralla Feeder of Electric sub div II Doda , in district Do
2026_PDD_308529_1
ED/Doda/JPDCL/11 of 2026-27
Open Tender
Electrical Works
Turn-key
60 days
ED DODA
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
XEN ED-Doda
₹80,500
12 May 2026
23 Apr 2026
9 May 2026
23 Apr 2026
8 May 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | A-SUPPLY PART | - | - | - | - |
| 3 | PERMANENT RESTORATION OF HT LINES /TAPS IN Bhella Chiralla FEEDERS | - | - | - | - |
| 4 | 9 Mtr. Long Pole (ST-410 SP33) | - | Nos | - | - |
| 5 | Channel X-arm including clamps and braces | - | Kg | - | - |
| 6 | 30 mm² ACSR Conductor | - | km | - | - |
| 7 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting
Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | - | Nos | - | - |
| 8 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | - | Nos | - | - |
| 9 | Nuts and Bolts | - | kg | - | - |
| 10 | PERMANENT RESTORATION OF LT LINES /TAPS OF Bhella Chiralla FEEDERS | - | - | - | - |
| 11 | 8 Mtr. Long Pole(ST-410 SP15) | 127 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.75 MB
Tendernotice_3.pdf
PDF • 7.52 MB
BOQ_999731.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .