Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.9 LAccepted-AOC PLOT NO 46 SUGANDHA VIHAR NEAR NEW ERA PROGRASSIVE SCHOOL RAMPUR DIST KORBA 495677 | KORBA | CHHATTISGARH | 495677 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | L-2₹15.5 L+₹28,600 (1.88%)Rejected-Finance MIG 110 SHARDA VIHAR NEAR VAIBHAV HOMES KORBA KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status | |
| 3 | L-3₹16.7 L+₹1.5 L (9.71%)Rejected-Finance PLOT AA1 SHAKTI ROLLER SYSTEM LANE NO 4 ANAND PARBAT INDUSTRIA AREA CENTRAL DELHI DELHI 110005 | CENTRAL DELHI | DELHI | 110005 | L-3 | Rejected-Finance Rejected as the bidder attains L-3 status |
Tender Value
₹22.7 L
EMD Value
₹28,400
Closing Date
11 Mar 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Repairing of bottom rollers for 1600mm belt conveyors of New CHP and Silo Section at Dipka Expansion Project.
2025_SECL_330457_1
SECL/GM/DA/SO(EnM)/ e-tender/24-25/91 dtd-26/02/25
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
4 documents required · 4 mandatory
₹28,400
30 May 2025
27 Feb 2025
13 Mar 2025
27 Feb 2025
11 Mar 2025
28 Feb 2025
27 Feb 2025 - 6 Mar 2025
Amount
Repairing of Bottom rollers for 1600mm belt conveyor with providing and fixing of all internals (Old Shell amd shaft to be provided by SECL) as following: i). Supply and painting of complete roller with one coat of Red oxide primer and one coat of synthetic enamel paint as standards. ii). Supply and fitting Bearing housing with Seal Kit, Circlip, minor repair of shaft ends and all other component as per standards. iii). Supply and fitting of bearing 6308 ZZ make NBC/FAG/SKF or equivalent. iv). Co-Axially/ balancing of the rollers is to be maintained.
Note: i). All the required materials except shell and shaft will be in the scope of contractor. ii). Loading, unloading, collection, transporting, handling of old/damaged idlers etc from different conveyors to site as per instruction will be in the scope of contractor. iii). All fasteners, consumables, packing and other necessary items for above works are in the scope of contractor. iv). The repairing works shall be carried out at Contractors workshop. v). Old & repaired rollers shall be routed through Regional Stores, Dipka Area with due inspection. vi). Repaired rollers shall be deposited to Regional Stores, Dipka Area within 21 days from receipt of old materials. vii). Rates are inclusive of Contractors Profit, Tools & Tackles and Overhead expenses etc. (excluding GST).
Total impact of GST for the purpose of CTC
HEMS CORPORATION SERVICES INDIA LIMITED (BID ID -1138331)
Shakti roller systems (BID ID -1137385)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .