Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 CrAccepted-AOC FLAT NO 401 TULSANI HEIGHTS 4TH FLOOR GREEN PARK SOCIETY AKURDI GURUDWARA TO WALHEKAR WADI ROAD CHINCHWAD PUNE 411033 | PUNE | MAHARASHTRA | 411033 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹11.4 Cr+₹24.6 L (2.20%)Rejected-Finance 5 KEDAR APARTMENTS 484 60 PARVATI MITRAMANDAL COLONY PARATI PUNE 411 009 | PUNE | PUNE | MAHARASHTRA | 411009 | L2 | Rejected-Finance Not lowest | |
| 3 | L3₹12.0 Cr+₹80.6 L (7.20%)Rejected-Finance 223 3 E B 1 MALTI TOWER TARABAI PARK KOLHAPUR 416 003 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416003 | L3 | Rejected-Finance Not lowest | |
| 4 | L4₹12.3 Cr+₹1.1 Cr (9.73%)Rejected-Finance BHAPKAR PATIL PLOT NO 24 GRUHSHILP HOUSING SOCIETY SATBHAI MALA DELHIGATE AHMEDNAGAR 414 001 | AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 414001 | L4 | Rejected-Finance Not lowest | |
| 5 | L5₹12.8 Cr+₹1.6 Cr (14.4%)Rejected-Finance 116 RUNWAL DIAMOND OPP PALACE ORCHARD N I B M UNDRI ROAD MOHAMADWADI PUNE 411 060 | PUNE | PUNE | MAHARASHTRA | 411060 | L5 | Rejected-Finance Not lowest |
| Sl No | Description | Qty | Unit | United Sales Corporation L5 | M/s S. R. Constructions L4 | Hariom Projects Pvt Ltd L6 | D R CONSTRUCTION L3 | Mehta Construction Co. L2 | SHAILENDRA B TULSANI L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the Contractor for “BUILDINGS AND STRUCTURES" as listed in Schedule ‘A’ Part - I representing ________________ % ____________________ percent Above / Below the lump sum price of `7,80,87,000.00 inserted by the MES in Schedule ‘A’ Part - I | 1 | LUMPSUM | 7,75,00,000 ₹7,75,00,000 | 7,70,00,000 ₹7,70,00,000 | 7,92,00,000 ₹7,92,00,000 | 6,90,00,000 ₹6,90,00,000 Lowest | 7,10,59,170 ₹7,10,59,170 | 7,41,82,650 ₹7,41,82,650 |
| 2.00 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part - II representing ________________ % _________________________ percent Above / Below the lump sum price of `62,765.35 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 75,000 ₹75,000 | 80,000 ₹80,000 | 70,000 ₹70,000 | 68,000 ₹68,000 | 57,116.47 ₹57,116.47 | 56,488.5 ₹56,488.5 Lowest |
| 3.00 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `13,46,948.00 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMPSUM | 13,46,948 ₹13,46,948 | 15,00,000 ₹15,00,000 | 14,00,000 ₹14,00,000 | 14,94,405 ₹14,94,405 | 14,68,173.32 ₹14,68,173.32 | 12,12,253.2 ₹12,12,253.2 Lowest |
| 4.00 | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTHWORK & SITE CLEARANCE AND AREA DEVELOPMENT” as listed in Schedule ‘A’ Part - IV representing ____________ % __________________ percent Above / Below the lump sum price of ₹1,01,64,641.10 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 1,01,64,641.1 ₹1,01,64,641.1 | 95,00,000 ₹95,00,000 | 1,25,00,000 ₹1,25,00,000 | 1,09,53,784 ₹1,09,53,784 | 74,20,188 ₹74,20,188 Lowest | 76,23,480.82 ₹76,23,480.82 |
| 5.00 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - V representing _____________ % ___________________ percent Above / Below the lump sum price of ₹94,256.55 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 94,256.55 ₹94,256.55 | 1,00,000 ₹1,00,000 | 1,00,000 ₹1,00,000 | 1,56,000 ₹1,56,000 | 1,02,739.64 ₹1,02,739.64 | 75,405.24 ₹75,405.24 Lowest |
| 6.00 | Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - VI representing ___________ % ___________________ percent Above / Below the lump sum price of ₹12,45,490.40 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 12,45,490.4 ₹12,45,490.4 | 13,00,000 ₹13,00,000 | 15,00,000 ₹15,00,000 | 16,72,746 ₹16,72,746 | 6,85,019.72 ₹6,85,019.72 Lowest | 10,08,846.9 ₹10,08,846.9 |
| 7.00 | Lump sum price worked out by the Contractor for “FENCING / COMPOUND WALL / GATE” as listed in Schedule ‘A’ Part - VII representing ____________ % ____________________________ percent Above / Below the lump sum price of `11,37,002.43 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 11,37,002.43 ₹11,37,002.43 | 12,00,000 ₹12,00,000 | 15,00,000 ₹15,00,000 | 11,48,137 ₹11,48,137 | 8,30,011.77 ₹8,30,011.77 Lowest | 9,89,192.11 ₹9,89,192.11 |
| 8.00 | Lump sum price worked out by the Contractor for “ROADS / PATH / CULVERT / HARDSTANDING” as listed in Schedule ‘A’ Part - VIII representing __________ % __________________________ percent Above / Below the lump sum price of ₹46,46,333.14 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | LUMPSUM | 50,00,000 ₹50,00,000 | 45,00,000 ₹45,00,000 | 50,00,000 ₹50,00,000 | 32,50,000 ₹32,50,000 Lowest | 38,09,993.17 ₹38,09,993.17 | 36,24,193.74 ₹36,24,193.74 |
| 9.00 | Lump sum price worked out by the Contractor for “TRENCH FOR CABLE” as listed in Schedule ‘A’ Part - IX representing __________ % __________________________ percent Above / Below the lump sum price of ₹9,09,538.45 inserted by the MES in Schedule ‘A’ Part - IX | 1 | LUMPSUM | 9,09,538.45 ₹9,09,538.45 | 12,00,000 ₹12,00,000 | 11,00,000 ₹11,00,000 | 10,78,624 ₹10,78,624 | 7,45,821.53 ₹7,45,821.53 Lowest | 7,73,107.68 ₹7,73,107.68 |
| 10.00 | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - X representing _________% ___________________ percent Above / Below the lump sum price of ₹85,027.60 inserted by the MES in Schedule ‘A’ Part - X | 1 | LUMPSUM | 1,00,000 ₹1,00,000 | 1,00,000 ₹1,00,000 | 1,00,000 ₹1,00,000 | 1,05,750 ₹1,05,750 | 92,680.08 ₹92,680.08 | 78,224.84 ₹78,224.84 Lowest |
Tender Value
₹13.0 Cr
EMD Value
₹9.7 L
Closing Date
3 Nov 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD PICKET OPP JUBILEE BUS STATION SECUNDERABAD 500003
CONSTRUCTION OF STATIC ROCKET TEST CENTRE SRTC AT ARDE UNDER GE I RnD PASHAN PUNE
2025_MES_733099_1
81400
Open Tender
Civil Works
Lump-sum
450 days
Pashan
Class S Category a(i)
8 documents required · 8 mandatory
₹3,000
GE I RND Pashan Pune
₹9.7 L
Yes
12 Feb 2026
27 Sept 2025
6 Nov 2025
27 Sept 2025
3 Nov 2025
27 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part-I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl item No. 1.01 to 1.07) are not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | |||||
| 1.01 | Lumpsum price worked out by the contractor for Construction of Static Rocket Testing Centre Building including all fittings and fixtures complete all as specified and as shown on drawings. | 1 | EACH BLOCK | - | - |
| 1.02 | Lumpsum price worked out by the contractor for Construction of Control Room Building including all fittings and fixtures complete all as specified and as shown on drawings. | 1 | EACH BLOCK | - | - |
| 1.03 | Lumpsum price worked out by the contractor for Construction of Instrumentation Room Building including all fittings and fixtures complete all as specified and shown on drawings. | 1 | EACH BLOCK | - | - |
| 1.04 | Lumpsum price worked out by the contractor for Construction of Mechnical Equipment Room Building including all fittings and fixtures complete all as specified and shown on drawings. | 1 | EACH BLOCK | - | - |
| 1.05 | Lumpsum price worked out by the contractor for Construction of Toilets for Ladies ans Gents Building including all fittings and fixtures complete all as specified and shown on drawings. | 1 | EACH BLOCK | - | - |
| 1.06 | Lumpsum price worked out by the contractor for Construction of Pump House Building including all fittings and fixtures complete all as specified and shown on drawings. | 1 | EACH BLOCK | - | - |
| 1.07 | Lumpsum price worked out by the contractor for Construction of Parking Shed Block - A (10 Nos.) & Block - A (05 Nos.) Building [Car Parking Shed for 10 Cars & Car Parking Shed for 05 Cars] including all fittings and fixtures complete all as specified and shown on drawings. | 1 | EACH BLOCK | - | - |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part - II representing ________________ % _________________________ percent Above / Below the lump sum price of `72,032.95 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 72,032.95 | ₹72,032.95 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `13,46,948.00 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMPSUM | 13,46,948 | ₹13,46,948 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tender.pdf
Tender Documents • 1.85 MB
PrepricedSchedules.pdf
Additional Documents • 0.39 MB
OriginalDrawings.rar
Additional Documents • 23.24 MB
BOQ_820824.xls
BOQ • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .