Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹2.7 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹2.7 LRejected-Finance SANTINEKATAN ROAD BOLPUR | BOLPUR | ₹2.7 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹2.7 LRejected-Finance 218 PASCHIM DASPARA NISCHINTA PUR ROAD | ₹2.7 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | AHALYA ENGINEERING WORKS L3 | SINHA ELECTRICALS L2 | DEY ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00PART-A Labour charges for 1(one) no operating personnel for operation of pumping machinery of each pump house by automatic panel including operation of valves, disinfection arrangement, internal/ external illuminations as per specification and round the clock guarding of the whole installation with all accessories. | ||||||
| 1.01 | For CWR | 276 | days | 596.44 ₹1.6 L | 596.26 ₹1.6 L | 596.09 ₹1.6 L |
| 1.02 | ESIC Contribution for Employers for Sl No. 1 @3.25% | 276 | Days | 15.11 ₹4,170.36 | 15.11 ₹4,170.36 | 15.11 ₹4,170.36 |
| 1.03 | EPF Contribution for Employers for Sl No. 1 @13% | 276 | Days | 60.45 ₹16,684.20 | 60.45 ₹16,684.20 | 60.45 ₹16,684.20 |
| 2.00PART-B Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments, overhead expenditures as per specification and direction of E.I.C. | ||||||
| 2.01 | For CWR | 9 | Months | 8,687.76 ₹78,189.84 | 8,685.23 ₹78,167.07 | 8,682.7 ₹78,144.30 |
| 3.00 | Add Cess @ 1% | 1 | item | 2,636.62 ₹2,636.62 | 2,635.89 ₹2,635.89 | 2,635.2 ₹2,635.20 |
Tender Value
Refer Docs
EMD Value
₹5,400
Closing Date
23 Apr 2025, 4:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operation and Guarning of pumping machinery including all allied electro-mechanical components installed at ALINAGAR DISTRIBUTION ZONE in the district of MALDA under MLMD, PHE Dte.
2025_PHED_831433_2
WBPHED/EE/MLMD/NIeT_42 of 2024-2025
Open Tender
Electrical Work/ Equipment
276 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,400
Yes
25 May 2026
3 Apr 2025
25 Apr 2025
3 Apr 2025
23 Apr 2025
3 Apr 2025
Amount
PART-A Labour charges for 1(one) no operating personnel for operation of pumping machinery of each pump house by automatic panel including operation of valves, disinfection arrangement, internal/ external illuminations as per specification and round the clock guarding of the whole installation with all accessories.
For CWR
ESIC Contribution for Employers for Sl No. 1 @3.25%
EPF Contribution for Employers for Sl No. 1 @13%
PART-B Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments, overhead expenditures as per specification and direction of E.I.C.
For CWR
Add Cess @ 1%
SINHA ELECTRICALS (BID ID -6310838)
AHALYA ENGINEERING WORKS (BID ID -6308971)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid