Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-Finance | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹3.5 L+₹1,752 (0.50%)Accepted-Finance | 2 | Accepted-Finance Satisfied | |
| 3 | 3₹3.5 L+₹5,208.50 (1.50%)Accepted-Finance | 3 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹5,500
Closing Date
21 Jun 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS I CT II Painting of Outer surface Hot water header pipes pipe supports hot water raiser pipes with support structure Hot water header drain pipe line in Cooing Tower II during AOH 2021 2022 of Unit II
2021_EB_202769_1
SE / M-I / MTPS-I / CA/OT. 99 / 2021-22
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹5,500
Yes
28 Jun 2021
15 Jun 2021
22 Jun 2021
15 Jun 2021
21 Jun 2021
15 Jun 2021
Amount
Charges for removing the rust and old paint from Painting of Outer surface Hot water header pipes, pipe supports, hot water raiser pipes with support structure, Hot water header drain pipe line in Cooing Tower -II
Charges for painting with one coat of rust convertor , one coat of epoxy red oxide primer and Two coat of epoxy sea green one over the other with proper intervals for in the outer surface of hot water header pipe up to 12m height and 11m horizontal length for the same height of hot water raiser pipe and butterfly valve (P.O red) and hot water header pipes its supports, hot water header drain pipe line.
Providing & dismantling of Scaffolding & Plat form arrangements and platform at every 1m height arround the the hot water raiser pipe of dia 1600mm up to 14m height and 11m horizontal length for the same height of hot water raiser pipe upto cooling tower-II civil structure in cooling tower-II by using casurina poles and wooden planks(Required scaffolding materials are under contractor scope)
Supply of Painting for SL.No.2 (Required quantities of paints Rust Convertor – 125kg , Epoxy red oxide primer-137Litre, Epoxy Sea Green paint -236Litre, Epoxy Thinner-56Litre etc are of contractor scope).
Charges for transporting for Sl.No.3 Charges for transporting & hire charges of casurina poles &wooden planks from outside MTPS-I to inside MTPS-I including manila rope etc.
Charges for Consumable and T & P
ARP Engineering Contractor
P.K.ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .