Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 CrAccepted-AOC | ₹3.1 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹3.2 Cr+₹3.8 L (1.20%)Rejected-AOC | ₹3.2 Cr+₹3.8 L (1.20%) | 2 | Rejected-AOC 2 |
| 3 | 3₹3.2 Cr+₹5.6 L (1.79%)Rejected-AOC | ₹3.2 Cr+₹5.6 L (1.79%) | 3 | Rejected-AOC 3 |
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
28 Jun 2017, 2:00 pmClosed
Deputy Conservator of forest
Forest and Wildlife Department, 2nd Floor, Paryavaran Bhawan, Madhya Marg, Sector 19B, Chandigarh
Plantation, Maintenance of Plantation, Maintenance of Road, Raising of Nursery and its maintenance, Minor SMC works and its maintenance etc
2017_CHD_38384_1
FOR/17/1242/21.06.2017
Open Tender
Composite Works
Item Rate
365 days
Chandigarh
As per tender document
6 documents required · 6 mandatory
₹0
₹6.0 L
22 Aug 2024
21 Jun 2017
28 Jun 2017
21 Jun 2017
28 Jun 2017
21 Jun 2017
21 Jun 2017 - 28 Jun 2017
Amount
Item with Detailed Specifications
Repair of chain link fencing boundary wall damaged due to nallah water coming from village Kansal in Lake Beat
Maintenance of Inspection House and maintenance of its plantation in Lake Beat
Clearance of diversion channel/canal from Saketri bridge to Regulator End in Lake Beat
Plantation of fruit bearing plants to create habitat for wildlife including its maintenance in Lake Beat
Plantation and its maintenance in Lake Beat
Installation of chain link fencing along chandigarh-Kaimbwala road towards Rock Garden in Lake Beat
Maintenance of Smriti Upvana in Lake Beat
Vigilant the forest area in Lake Beat
Maintenance of plantation in 50 acre land of village kaimbwala in Lake Beat
Raising and maintenance of nursery in Lake Beat
Raising and maintenance of nursery in Lake Inspection House in Lake Beat
Maintenance of old plantation in Lake Beat
Clearance of area in City Forest developed under Nagar Van Udyan Yojana in Lake Beat
Maintenance of plantation carried out under Nagar Van Udyan Yojana in City Forest in Lake Beat
Maintenance of Vegetative plantation planted during 2016-17 along track/walkways under Nagar Van Udyan Yojana
Mazdoor engaged to vigilant the City Forest developed under Nagar Van Udyana Yojana in Lake Beat
Maintenance of grass planted on walkways/tracks under Nagar Van Udyan Yojana in Lake Beat
Maintenance of plantation carried out in 6 acres in Lake Beat
Maintenance of Nature Interpretation Centre in Lake Beat
Mazdoor engaged to sensitize the citizens about the migratory birds and to provide binoculars to the visitors at Sukhna Lake
Sweepers for the maintenance of tracks, visitor sheds and meditation huts constructed under Nagar Van udyan Yojana in Lake Beat
Preparation of flowering beds and plantation of flowering plants at Inspection House in lake Beat
Maintenance of lawn in Inspection House in Lake Beat
Maintenance of plantation carried out in 28 acres in Lake Beat
Gatekeeper on main entry gate of and mazdoor engagaged to vigilant on Nature Trail in Lake Beat
Balance work required forthe installation of chain link fencing near Rock Garden Gate No.3 to control the illegal parking of vehicles in Lake Beat
Clearance of diversion channel/canal from Saketri bridge to Regulator End in Lake Beat
Maintenance of CAMPA plantation carried out in 2015-16 in lieu of diversion of 0.04 Ha. Of forest land for laying of Storm Water Drainage in lake Beat (400 Plants)
Plantation of ornamental plants for the beautification of main entry gate & other important sites of City Forest in Lake Beat
construction of rockeries near main entry gate of City Forest in Lake Beat
Improvement of road/Nature Trail in Lake Beat
Improvement of track from barrigate towards regulator end to track along Sukhna Lake towards Regulator End forthe sighting of migratory birds in Lake Beat
Mazdoor engaged for the protection of solar equipments installaed at Dhanas Lake in Patiala Ki Rao beat
Transplantation from small P.Bags to bigger one for raising tall plants at Patiala Ki Rao Nursery
Plantation and its maintenance in Patiala Ki Rao Beat
Installation of chain link fencing backside of water body & along road in Patiala Ki Rao Beat
vigilant duty on water bodies of Dhanas in Patiala Ki Rao Beat
Cutting of grass manually with lawn mover on water bodies of Village Dhanas
Maintenance of plants in Peacock and Peahen Park in Sector-39, Chandigarh
Raising and maintenance of nursery in Patiala Ki Rao Beat
Maintenance of old plantation in Patiala Ki Rao Beat
Maintenance of fruit bearing plot and its plantation (planted during 2015-16) in Patiala Ki Rao beat
Maintenance of fruit bearing plot and its plantation (planted during 2016-17) in Patiala Ki Rao beat
Maintenance of fruit bearing plot and its plantation (planted during 2013-14) in Patiala Ki Rao beat
Vigilant duty and picking of garbage in plantation area adjoining to village Karoran in Patiala Ki Rao beat
Maintenance of Bougainvillea and other plants on water bodies along Khuda Lahora-Dadu Majra road in Patiala Ki Rao Beat
Maintenance of Darata hedge plantation surrounding Dhanas water bodies in Patiala Ki Rao Beat
Preparation of brick wall on old stone masonry wall to control the illegal dumping of garbage in forest area near Janta Colony in Patiala Ki Rao beat
Maintenance of CAMPA plantation in 3.31 acres (1.34 Ha.) CA site in Khuda Lahora
Maintenance of CAMPA plantation carried out over an area of 16.71 acres (6.80 Ha.) in village Maloya for compensatory afforestation in lieu of diversion of land 1.30 acre (15.41+1.30=16.71 acres)for I.T habitat near I.T
Maintenance of CAMPA plantation carried out during 2015-16 in lieu of diversion of39.862 ha. Of forest land for construction of various building in PGIMER (4200 Plants)
Maintenance of CAMPA plantation carried out during 2015-16 in Patiala Ki Rao Beat in lieu of diversion of 39.862 ha. Of forest land for providing SWD line through forest area from PEC(1000 Plants)
Maintenance of CAMPA plantation carried out during 2015-16 in Patiala Ki Rao Beat in lieu of diversion of 39.862 ha of forest land for construction of various building in PGIMER (1700 Plants)
Maintenance of CAMPA plantation carried out during 2015-16 in village Maloya in Lieu of diversion of 0.6758 ha for construction of Christian Cemetary in Sector-25, diversion of 4.86 ha. For construction of route No.2 from Chandigarh-Pkl and Diversion of 0.526 ha. for IT habitat near Kishangarh and plantation work in Khuda Lahora in lieu of diversion of 1.34 ha. for forest land for widening of Chandigarh-Kalka (2490 Plants)
Maintenance of CAMPA plantation carried out in Patiala Ki Rao Beat during 2015-16 in lieu of diversion of 0.607 Ha. Land for widening and STG of RD from Uttar Marg to village Kaimbwala (675 Plants)
Transplantation from small p.bags to bigger one for raising tall plants at Southern Sectors Forest Nursery
Maintenance of old plantation in Southern Sectors
Maintenance of southern Sectors plantation plots
Raising and maintenance of nursery in southern Sectors
Plantation and its maintenance in Southern Sectors
Clearance of plantation area i.e. Picking of poly bags, garbage in Southern Sectors
Labour engaged for the pruning of trees in southern Sectors
Labour engaged to vigilant in southern Sectors i.e. From sector-39 to sec-47 and sec-48 to sec-56
Labour engaged to vigilant at mining site in southern Sectors
Installation of chain link fencing along Chandigarh-Kaimbwala road towards Smriti Upvana under Nagar Van Udyan Yojana in Lake Beat
Construction of 2 Nos. toilet blocks under Nagar Van Udyan Yojana in Lake Beat
Construction of visitor shed /rain shelter under Nagar Van Udyan Yojana in Lake Beat
Surinder Singh
MS SHAHDAR ALI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .