Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 CrAccepted-AOC F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | ₹11.3 Cr Quoted ₹15.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹16.1 CrRejected-AOC 2 HOUSE NO 214 FRIENDS COLONY RAJIV NAGAR MANDI DABWALI 125104 | MANDI DABWALI | SIRSA | HARYANA | 125104 | ₹16.1 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹16.2 CrRejected-AOC | ₹16.2 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹16.3 CrRejected-AOC | ₹16.3 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹16.7 CrRejected-AOC | ₹16.7 Cr | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹12 L
Closing Date
13 Nov 2021, 5:00 pmClosed
Executive Engineer
184, Giani Zail Singh Nagar
Survey, Soil testing, Design, Supply and Construction, Installation, Commissioning of 10 MLD STP (Zone-II) at Kharar Town based on any suitable, sustainable and proven technology including other appurtenant works on turnkey basis as per DNIT.
2021_DLG_74829_1
16 of 2021 (01) dated 18.10.2021
Open Tender
Miscellaneous Works
365 days
Kharar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹12 L
7 Jan 2022
22 Oct 2021
15 Nov 2021
22 Oct 2021
13 Nov 2021
22 Oct 2021
Amount
10 MLD STP at Kharar
Survey, Soil testing, Design, Supply and Construction, Installation, Commissioning of 10 MLD STP (Zone-II) at Kharar Town based on any suitable, sustainable and proven technology including other appurtenant works on turnkey basis as per DNIT, Including Operation & Maintenance for a period of 60 months after stabilization period of 3 months or more.
Description of Work / Item(s)
Amount
Survey, Soil testing, Design, Supply and Construction, Installation, Commissioning of 10 MLD STP (Zone-II) at Kharar Town based on any suitable, sustainable and proven technology including other appurtenant works on turnkey basis as per DNIT, Including Operation & Maintenance for a period of 60 months after stabilization period of 3 months or more.
CREDIT OF SLUDGE (-)
Description of Work / Item(s)
Survey, Soil testing, Design, Supply and Construction, Installation, Commissioning of 10 MLD STP (Zone-II) at Kharar Town based on any suitable, sustainable and proven technology including other appurtenant works on turnkey basis as per DNIT, Including Operation & Maintenance for a period of 60 months after stabilization period of 3 months or more.
TOTAL AVERAGE DAILY GUARANTEED POWER CONSUMPTION
Hydrotech Paryavaran India Pvt. Ltd.
21st Century Enviro Engineers Pvt. Ltd.
M/s Raj Kumar Contractor
HI-Tech WAter Solutions Pvt. Ltd.
HI-Tech WAter Solutions Pvt. Ltd.
Hydrotech Paryavaran India Pvt. Ltd.
M/s Sourabh Construction Pvt. Ltd.
M/s Raj Kumar Contractor
M/s Raj Kumar Contractor
Hydrotech Paryavaran India Pvt. Ltd.
21st Century Enviro Engineers Pvt. Ltd.
M/s Sourabh Construction Pvt. Ltd.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid