| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.4 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹6.1 L+₹67,420 (12.4%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹7.0 L+₹1.6 L (28.7%)Rejected-Finance | L-3 | Rejected-Finance L-3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Document not as per requirement | |
| 5 | Rejected-Technical | - | Rejected-Technical Document not as per requirement |
Tender Value
₹5.4 L
EMD Value
₹6,000
Closing Date
28 Feb 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
132 KV S/S GHAZIPUR
DISMANTLING OF 40MVA T/F BBL MAKE, ITS SHIFTING AND SHIFTING OF 63MVA T/F TAL MAKE, ITS ERECTION AND ALL OTHER ASSOCIATED WORK AT 132KV S/S DOHRIGHAT UNDER ETD-MAU
2022_UPTCL_673979_2
Short Term E-Tender No. 93 ETC(GZP)/2021-22
Open Tender
Electrical Works
Lump-sum
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹708
EE ETD Ghazipur
₹6,000
12 Apr 2022
23 Feb 2022
2 Mar 2022
23 Feb 2022
28 Feb 2022
23 Feb 2022
180 days
Amount
Dismantling of 40 MVA T/F BBL make drain out T/F oil upto required level, removal of all radiators, conservator tank, oil pipe lines, HV/LV neutral bushing, removal of the HV/LV turrets, fan & marshalling box etc. blanking of radiators, oil pipe lines, conservator tank proper gasket along with nuts and bolts etc.
Shifting of main tank of 40 MVA T/F BBL Make from plinth upto near open space upto 20 meter distance including turning the T/F tank and performing all other associated work.
Additional shifting of main tank upto 100 meter @5.00 meter/Job.
Shifting of main tank of 63 MVA T/F TAL make from unloading place to plinth with the help of rail, pulling device, slippers etc. upto 20 meter distance including turning the tank and performing all other associated work.
Additional shifting of main tank upto 90 meter @5.00 meter/Job.
Complete erection of 63 MVA T/F TAL make including radiators, conservator tank, HV/LV neutral bushing, turrets, connecting all pipe lines, cooling fans, control cables. Motor drive mechanism of OLTC, RTCC panels etc. topping up of transformer (not circulation) and final oil filling in tank and attending leakage if any all other associated work for satisfactorily completion of work.
Dismantling of all cable connection of 40 MVA T/F BBL make and its RTCC panels, re-termination and re-ferruling as per new cable schedule of 63 MVA T/F TAL make and its RTCC panel.
Complete earthing of 63 MVA T/F TAL make as per standard practice with 75x10mm/ 50x6mm M.S. flat main tank of the T/F, marshalling box, drive mechanism of cooling fans etc. shall be earthed as per standard practice including all material and T&P.
Earthing of 63 MVA T/F TaL Make natural with 75x10 mm and 50x6 mm flat, its grounding painting and connecting with delta with flat at two point and other associated work M.S. flat to be provided by the contractor at his own cost.
Jumpering of the 63 MVA T/F TaL Make
HV side with single ACSR panther conductor
LV side with single ACSR moose/zebra conductor
Laying of following size of control cables in the cable trenches from control panels to marshalling boxes/equipments/junction boxes etc. in switchyard for new 63 MVA T/F TAL Make as per cable schedule along with its sanding at every 750 mm distance with M.S. saddles of size 25x3mm including carriage of cable drums from store to laying site and shifting back to the store after completion of works and all other associated works to complete the job satisfactorily as per technical specification.
2C x 2.5 mm unarmoured
4C x 2.5 mm unarmoured
Proper packing of HV/LV neutral bushing of dismantle T/F uncluding proper wrapping with polythene sheets in the wooden crates got emptied after taking out bushing of 40 MVA T/F BBL Make
Dismantling of 132 KV LA opening of jumpers cutting of earthing etc, re-erection of 132 KV LA and related associated work to complete the job satisfactorily.
Replacement of 3 No. 33 KV CT with new 3 No. 33 KV CT as per 63 MVA T/F Tal Make and associated work i.e. jumpering earthing etc.
Complete centrifuging of 132/33 KV 63 MVA TAL make power transformer oil at 132 KV sub-station Dohrighat including the cost of PPM at site upto desired value & complete DGA test of T/F oil upto desired values.
Meena Elect & Engg. Works
Preeti Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .