Loading…
Loading…
Tender Value
₹33.6 L
EMD Value
₹67,200
Closing Date
25 Aug 2026, 3:00 pm2d left
Exe. Eng. Minor Irrigation Division, Latehar
Exe. Eng. Minor Irrigation Division, Latehar
Construction of PCC Road from PWD Road Mccluskieganj to Akhara, Block Chandwa, Panchayat Dumaro, Village Belgarha Distt. Latehar
2026_WRD_117423_1
WRD/MID/Lateh/F2-07/2026-27Dt 10-08-26
Open Tender
Civil Works
Percentage
180 days
BLOCK CHANDWA, DISTRICT LATEHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹67,200
17 Aug 2026
17 Aug 2026
27 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Subgrade and Earthen Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. SOR. ITEM NO. 3.18 RDD | 660.83 | M³ | 131.3 | ₹86,766.98 |
| 2 | Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. SOR. ITEM NO. 4.01 B(iii)RDD | 270.34 | M3 | 1,680.3 | ₹4,54,252.3 |
| 3 | Providing and laying in position cament concrete of specification grade excluding the cost of centering and shuttering - All Work to plinth level. (1:1.5:3) (1 cement :1.5 coarse and (Zone -III): 3 Graded stone aggregate 20mm nominal size | 333.75 | M3 | 4,961.73 | ₹16,55,977.39 |
| 4 | Centering and Shuttering including strutting propping etc. and removal of form for foundation Footing bases of columns etc for mass conctete | 178 | M3 | 194.5 | ₹34,621 |
| 5 | Carriage of materials
(i) Cement – Lead 15 km(s) + 1 km(k) | 137.45 | MT | 570.4 | ₹78,401.48 |
| 6 | (ii) Sand – Lead 15 km(s) + 1 km(k) | 143.51 | M3 | 372.28 | ₹53,425.9 |
| 7 | (iii) Stone Chips – Lead 40 km(s) + 1 km(k) | 546.55 | M3 | 744.28 | ₹4,06,786.23 |
| 8 | (iv) Stone Dust – Lead 40 km(s) + 1 km(k) | 64.88 | M3 | 744.28 | ₹48,288.89 |
| 9 | After adding GST @18% on total estimated value the total estimated amount is | - | % | 0.12 | - |
| 10 | Labour Cess @1% on above total estimated amount | - | %a | 0.01 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.46 MB
tenderdocuments.pdf
Tender Documents • 0.62 MB
BOQ_158708.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].