Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹12.0 L
EMD Value
₹23,977
Closing Date
23 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-02 Ward-88 Chandapur Hata me Ramesh Kumar ke makan se Lalchandra Keshwani ke makan hote hue Shiv Babu Kesharwani tak CC dwara sadak evam nali marammat karya.
2026_NNAMC_1208532_4
23.11.2026 09 works
Open Tender
Civil Works
Percentage
60 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,416
AS PER DOCS
₹23,977
23 Nov 2026
14 Nov 2026
23 Nov 2026
14 Nov 2026
23 Nov 2026
14 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old exsisting interlockin tiels including sacking of servicble and disposal of unservicable material with in a distance of 50mtr as per E/C | 918 | Sqm | 9 | ₹8,262 |
| 2 | Earth work cutting in ordinary soil up to 1.5 m lift &30m led with all complete work (S.I.No.253) | 129.6 | cum | 87.3 | ₹11,314.08 |
| 3 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 3.31 | cum | 5,300 | ₹17,543 |
| 4 | 12mm thick plaster cement mortar consisting of 1 part cement and 4 parts of fine sand of 1.25 finerness modulus.SI 574 | 45 | Cum | 171 | ₹7,695 |
| 5 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 86.4 | cum | 1,654.8 | ₹1,42,974.72 |
| 6 | Providing&Laying 100 micron polythene with all complition of work | 1,080 | Rmt | 74.88 | ₹80,870.4 |
| 7 | Cement concrete with cement, sand & 20mm gauge stone grit with the proportion of (1:2:4) including all complete the work. | 108 | Cum | 8,200 | ₹8,85,600 |
| 8 | Cartage of earth upto 5 km. distance from site with all complete work. | 103.74 | cum | 183.5 | ₹19,035.56 |
| 9 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 1.2 | Cum | 9,300 | ₹11,160 |
| 10 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) | 70.65 | kg | 62 | ₹4,380.3 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_2293128.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .