Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC | ₹1.1 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.2 Cr+₹7.8 L (7.09%)Rejected-AOC | ₹1.2 Cr+₹7.8 L (7.09%) | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THE GILL SOCIETY L2 | G M DEVELOPERS GROUP L1 |
|---|---|---|---|---|---|
| 1.00 | Scraping Mud Plaster | 5,593.82 | Sq.Mtr | 5 ₹27,969.1 Lowest | 7 ₹39,156.74 |
| 2.00 | Repairs to plaster in patches of Area 2.5 Sq.Mtr and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 Metres lead
With cement mortar 1:4 (1 cement: 4 sand) Taking area 2.5 Sq.Mtr | 5,593.82 | Sq.Mtr | 220 ₹12,30,640.4 | 210 ₹11,74,702.2 Lowest |
| 3.00 | Removing Doors and Windows (Steel or wood) with chowkhats by making recesses in walls when the wall is not to be dismantled Doors of area 3 Sq.Mtr and below | 176 | Nos. | 250 ₹44,000 Lowest | 250 ₹44,000 Lowest |
| 4.00 | Removing Doors and Windows (Steel or wood) with chowkhats by making recesses in walls when the wall is not to be dismantled Windows of area 3 Sq.Mtr and below | 78 | Nos. | 300 ₹23,400 | 250 ₹19,500 Lowest |
| 5.00 | Regrading terracing of mud plaster covered with 75mm Earth fill by removing mud plaster, preparing the surface of mud plaster to proper, slope, relaying mud plaster Gobri leaping under poltyhene 250 micron thick below earth fill | 1,527.5 | Sq.Mtr | 400 ₹6,11,000 Lowest | 425 ₹6,49,187.5 |
| 6.00 | Top Khurra 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement concrete 1:8:16 | 94 | Nos. | 100 ₹9,400 Lowest | 100 ₹9,400 Lowest |
| 7.00 | Bottom khurra on ground 1.2m 0.6m consisting of bricks on edge laid in cement mortar 1:3 over 7.5 cm cement concret 1:8:16 including 12.5mm thick cement plaster 1:3 | 94 | Nos. | 500 ₹47,000 Lowest | 600 ₹56,400 |
| 8.00 | Cement concrete 1:2:4 gola 10cm x 10cm concave quadrant along junction of roofs with parapet wall finished smooth, where specially specified. | 1,306.91 | mtr | 60 ₹78,414.6 Lowest | 70 ₹91,483.7 |
| 9.00 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two or more coats to get required finish | 5,593.82 | Sq.Mtr | 90 ₹5,03,443.8 | 83 ₹4,64,287.06 Lowest |
| 10.00 | Distempering with Acrylic washable oil bound distemper (of approved manufacture) two or more coats over one priming coat to give an even shade | 5,593.82 | Sq.Mtr | 90 ₹5,03,443.8 | 82 ₹4,58,693.24 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
17 Sept 2025, 10:00 amClosed
Xen Fazilka Canal And Ground Water Division CC FZR
Xen Fazilka Canal And Ground Water Division CC FZR
ESTIMATE FOR REPAIR OF J, JD, O, S, SD TYPE QUATERS AND DISPENSARY IN CANAL COLONY FEROZEPUR.
2025_WR_148164_1
007/FazilkaCanal/2025-26 dated 22/08/2025
Open Tender
Civil Works - Canal
Item Wise
180 days
Xen Fazilka Canal And Ground Water Division CC FZR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹2.1 L
4 Nov 2025
25 Aug 2025
17 Sept 2025
25 Aug 2025
17 Sept 2025
25 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .