Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
8 Nov 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer REW Budgam
Rural Engineering Complex Budgam
Upgradation of Class Room at MS Nendvendpora , Halqa Harda Batpora
2021_RDPR_146090_7
NIT_60_REW Budgam of 2021-22
Open Tender
Civil Works
Item Rate
60 days
HARD BATAPORA BUDGAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Rural Development and Panchayati Raj
Exempted
9 Nov 2021
1 Nov 2021
9 Nov 2021
1 Nov 2021
8 Nov 2021
1 Nov 2021
120 days
Amount
Provision for Site Clearence making site workable dismentling of dammaged ply and celing, taking out nwindoew from wall of main building and then to be re fixed in newly constructed room ( Unskilled labours )
Providing and laying of dry stone soling hand packed in foundations
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns /slab etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. 1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars
Providing and fixing of wood work in frames of dooras and shutters (K D Wood)
12 mm thick cement sand plaster of (1:4) mix
Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) Ordinary cement without any pigment.
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 25mm thick with 12.5 mm nominal size stone aggregate
Providing and fixing of 12 mm thick ply board for kitchen celing
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc
Engagement of carpenters for for repairment of dammaged wood work ( Ist class carpenter)
Carriage of sand for 10 Kms average lead from Source to site of work
Carriage of Aggrigate for 15 Kms average lead from Source to site of work
Carriage of Boulders for 10 Kms average lead from Source to site of work
Carriage of Cement for 3 Kms average lead from Source to site of work
Carriage of Bricks for 7 Kms average lead from Source to site of work
Add provisions for CIB ,carrage of cement photographs and other unforseen items
nisar ahmad darDAR
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .