Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC | ₹18.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹18.9 LRejected-AOC C 2 411 VIBHAV KHAND GOMTI NAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹18.9 L | L2 | Rejected-AOC Accepted |
| 3 | Rejected-Technical VILLAGE POST PALSO GOVERDHAN MATHURA | MATHURA | MATHURA | UTTAR PRADESH | - | - | Rejected-Technical Required technical sepcification not fullfill by the firm |
Tender Value
₹19.0 L
EMD Value
₹38,000
Closing Date
26 May 2026, 3:00 pmClosed
PROJECT MANAGER
Indra Puri Near Police Chauki, Bhola Kheda Lucknow.
RENOVATION OF BACK FACADE WORKS OF OFFICE BUILDING AT VIDYUT SURAKSHA NIDESHALAYA, VIBHUTI KHAND-2 , GOMTI NAGAR, LUCKNOW (U.P.)
2026_UPPRC_1137952_2
02/PCL/PM/UNIT-8/2026-27/Dated 16-04-2026
Open Tender
Civil Works
Percentage
60 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹38,000
22 Aug 2026
21 May 2026
26 May 2026
21 May 2026
26 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.00_) | Dismantling brick work or stone work in cement mortar and including stacking of materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) | 22.25 | CUM | 1,592.47 | ₹35,432.46 |
| 0.00_) | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches
etc. complete | 1,748.51 | Sqm. | 15.27 | ₹26,699.75 |
| 0.00_) | 12mm thick plaster in inner walls with proportion of 1:6 cement & approved coarse sand | 1,661.08 | Sqm. | 265.63 | ₹4,41,232.68 |
| 0.00_) | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 253.96 | Cum | 204.03 | ₹51,815.46 |
| 0.00_) | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 6 coarse sand) | 22.25 | Cum. | 7,038.62 | ₹1,56,609.29 |
| 0.00_) | Float glass panes 5.0 mm thick glass panes (weight not less than 12.50 kg/sqm). | 131.18 | Sqm. | 2,010.07 | ₹2,63,680.98 |
| 0.00_) | Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacturer, over the plastered wall surfaceto prepare the surface even and smooth complete. | 1,748.51 | Sqm. | 120.62 | ₹2,10,905.28 |
| 0.00_) | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) ( as per exisitng building colour) | 1,748.51 | Sqm. | 132.26 | ₹2,31,257.93 |
| 0.00_) | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufactur | 477.02 | Sqm. | 136.24 | ₹64,989.2 |
| 0.00_) | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. | 1,589.55 | Sqm. | 261.46 | ₹4,15,603.74 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
technicalbid.pdf
Tender Documents • 3.24 MB
BOQ_2156118.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].