Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-Finance | ₹6.8 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹10.0 L+₹3.2 L (47.3%)Accepted-Finance 150 BC LINE MALL ROAD MEERUT CANTT 250001 | MEERUT | UTTAR PRADESH | 250001 | ₹10.0 L+₹3.2 L (47.3%) | L2 | Accepted-Finance 2nd lowest |
| 3 | L3₹10.6 L+₹3.9 L (57.0%)Accepted-Finance | ₹10.6 L+₹3.9 L (57.0%) | L3 | Accepted-Finance 3rd lowest |
| 4 | L4₹11.4 L+₹4.6 L (67.8%)Accepted-Finance | ₹11.4 L+₹4.6 L (67.8%) | L4 | Accepted-Finance 4th lowest |
| 5 | Rejected-Technical | - | - | Rejected-Technical No categorty |
| Sl No | Description | Qty | Unit | M/S V K TRADERS L4 | Ashoka Engineers L3 | Malpotra Enterprises L1 | VIRAT CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|
| 1.00REPAIRS TO EICHER 10.75 | |||||||
| 1.01 | M&L Opening/Dismantaling Suspension System (Complete) from the EICHER 10.75 and replacement wornout part of Front Suspension Complete, Anti-Roll Bars, Rear Suspension worn out part complete, spring type Shock Absorbers, tension the leaf spring by heat process including adjustment the same as required with necessary Nut, Bolts, Washers and rubber gaskets including minor respect of parts etc.complete all as specified and as directed. MAKE : EICHER 10.75 or as approved. | 2 | Each Job | 12,500 ₹25,000 | 12,500 ₹25,000 | 7,300 ₹14,600 Lowest | 10,850 ₹21,700 |
| 1.02 | M&L Brake Master Cylinder Kit suitable for EICHER 10.75 including Taking out existing Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed.
MAKE : TVS/ TATA/BOSCH | 2 | Each job | 5,500 ₹11,000 | 5,500 ₹11,000 | 2,800 ₹5,600 Lowest | 4,550 ₹9,100 |
| 1.03 | Taking down Self Starter from EICHER 10.75 for Servicing/Overhauling at Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed.
MAKE : MICO/LUCAS. | 3 | Each Job | 7,900 ₹23,700 | 7,900 ₹23,700 | 1,800 ₹5,400 Lowest | 7,900 ₹23,700 |
| 1.04 | M&L for Taking out front and rear wheels complete from vehicle, cleaning, polishing and overhauling of brake system (of 02X04 Nos of wheels) by providing new wheel cylinder kit 2xeach wheel and replacement brake shoe, brake liner, brake pipes complete (Make: TVS/Rane/Bosch), cleaning & polishing of wheel drum, greasing of front and rear and front wheels bearing, taking out complete each wheels, cleaning of each wheels/disc/rims after making smooth surface, re-assembling of wheels and re-fixing all parts & wheel from workshop complete with recommendations etc testing on complition for Eicher 10.75 complete all as as specified and directed. | 2 | Each Job | 12,600 ₹25,200 | 12,600 ₹25,200 | 8,800 ₹17,600 Lowest | 12,400 ₹24,800 |
| 1.05 | M&L Taking down the existing Clutch System from EICHER 10.75, Replacement of Clutch Plate (MAKE : REPCO/ TATA ), Pressure Plate (MAKE : REPCO/ TATA /Value) With Bearing (MAKE : SKF/ REPCO/ TATA /Value) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed.
NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate. | 2 | Each Job | 18,000 ₹36,000 | 18,000 ₹36,000 | 8,800 ₹17,600 Lowest | 14,800 ₹29,600 |
| 1.06 | Taking down complete differential assembly of EICHER 10.75 and replacement diffrential side gear,spider gear,ring gear,axle shafts ,drive pinion,change complete differential oil and testing on completion,complete all as specified and directed. | 2 | Each Job | 9,500 ₹19,000 | 9,500 ₹19,000 | 13,500 ₹27,000 | 8,480 ₹16,960 Lowest |
| 1.07 | Taking down propeller shaft of EICHER 10.75 and replacement universal joint,U-joint spider,snap ring,intermediate shaft, bearings,roller bearing,oil rings,U- joint flange yoke,nut, bolt,washer, testing on completion,complete all as specified and directed. | 2 | Each Job | 9,300 ₹18,600 | 9,300 ₹18,600 | 4,300 ₹8,600 Lowest | 8,350 ₹16,700 |
| 1.08 | M&L Opening Complete Window with Inner Flap, locking arrangement. Servicing and repairs for Opening and Closing of Window glass including replacement of locking system with complete machine, ,inner flap,Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle and re-fixing of all Parts, Testing on completion, complete all as specified and as directed.(as per sample) | 2 | Each set of Two | 6,400 ₹12,800 | 6,400 ₹12,800 | 1,400 ₹2,800 Lowest | 5,500 ₹11,000 |
| 1.09 | Taking down unsv wiper blade and replacement wipper blade complete including service of motor.
Make-TVS/LUCAS,Value. | 4 | Set of two | 800 ₹3,200 | 800 ₹3,200 | 500 ₹2,000 Lowest | 750 ₹3,000 |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
20 Aug 2026, 6:00 pmClosed
Garrison Engineer (N) Mamun
Garrison Engineer (N) Mamun PIN-145001
REPAIR/ MAINTENANCE/ SERVICE OF B VEHICLE UNDER AGE E/M-II OF GE (N) MAMUN
2026_MES_780373_1
GE(N)/M-47/2026-27
Open Tender
Shipping/ Transportation/ Vehicle
Item Rate
180 days
Garrison Engineer (N) Mamun
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Garrison Engineer (N) Mamun
₹20,000
5 Sept 2026
23 Jul 2026
27 Aug 2026
23 Jul 2026
20 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1REPAIRS TO EICHER 10.75 | |||||
| 1.01 | M&L Opening/Dismantaling Suspension System (Complete) from the EICHER 10.75 and replacement wornout part of Front Suspension Complete, Anti-Roll Bars, Rear Suspension worn out part complete, spring type Shock Absorbers, tension the leaf spring by heat process including adjustment the same as required with necessary Nut, Bolts, Washers and rubber gaskets including minor respect of parts etc.complete all as specified and as directed. MAKE : EICHER 10.75 or as approved. | 2 | Each Job | - | - |
| - | M&L Brake Master Cylinder Kit suitable for EICHER 10.75 including Taking out existing Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed.
MAKE : TVS/ TATA/BOSCH | 2 | Each job | - | - |
| - | Taking down Self Starter from EICHER 10.75 for Servicing/Overhauling at Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed.
MAKE : MICO/LUCAS. | 3 | Each Job | - | - |
| - | M&L for Taking out front and rear wheels complete from vehicle, cleaning, polishing and overhauling of brake system (of 02X04 Nos of wheels) by providing new wheel cylinder kit 2xeach wheel and replacement brake shoe, brake liner, brake pipes complete (Make: TVS/Rane/Bosch), cleaning & polishing of wheel drum, greasing of front and rear and front wheels bearing, taking out complete each wheels, cleaning of each wheels/disc/rims after making smooth surface, re-assembling of wheels and re-fixing all parts & wheel from workshop complete with recommendations etc testing on complition for Eicher 10.75 complete all as as specified and directed. | 2 | Each Job | - | - |
| - | M&L Taking down the existing Clutch System from EICHER 10.75, Replacement of Clutch Plate (MAKE : REPCO/ TATA ), Pressure Plate (MAKE : REPCO/ TATA /Value) With Bearing (MAKE : SKF/ REPCO/ TATA /Value) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed.
NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate. | 2 | Each Job | - | - |
| - | Taking down complete differential assembly of EICHER 10.75 and replacement diffrential side gear,spider gear,ring gear,axle shafts ,drive pinion,change complete differential oil and testing on completion,complete all as specified and directed. | 2 | Each Job | - | - |
| - | Taking down propeller shaft of EICHER 10.75 and replacement universal joint,U-joint spider,snap ring,intermediate shaft, bearings,roller bearing,oil rings,U- joint flange yoke,nut, bolt,washer, testing on completion,complete all as specified and directed. | 2 | Each Job | - | - |
| - | M&L Opening Complete Window with Inner Flap, locking arrangement. Servicing and repairs for Opening and Closing of Window glass including replacement of locking system with complete machine, ,inner flap,Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle and re-fixing of all Parts, Testing on completion, complete all as specified and as directed.(as per sample) | 2 | Each set of Two | - | - |
| - | Taking down unsv wiper blade and replacement wipper blade complete including service of motor.
Make-TVS/LUCAS,Value. | 4 | Set of two | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tender47.pdf
Tender Documents • 0.78 MB
BOQ_874124.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .