| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹61.6 L−₹4.5 L (6.84%)Accepted-AOC NO 2 TOWN HALL COMPLEX PUDUKKOTTAI 622001 | PUDUKKOTTAI | TAMIL NADU | 622001 | H2 | Accepted-AOC Lowest Amount | |
| 2 | H1₹66.2 LRejected-Finance 47 EZHIL NAGAR PUDUKKOTTAI 622 005 | PUDUKKOTTAI | TAMIL NADU | 622005 | H1 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | JPS CONSTRUCTION H1 | K INFRA H2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401Laying and Jointing PVC Pipe. Heading | 795 | m3 | 2,500 ₹19,87,500 | 2,333 ₹18,54,735 Lowest |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with waterat OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 530 | M3 | 2,750 ₹14,57,500 | 2,642 ₹14,00,260 Lowest |
| 3.00 | Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 5,300 | m2 | 90 ₹4,77,000 | 84.5 ₹4,47,850 Lowest |
| 4.00 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 5,300 | m2 | 22 ₹1,16,600 | 18 ₹95,400 Lowest |
| 5.00 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | 265 | m3 | 1,150 ₹3,04,750 | 1,082.7 ₹2,86,915.5 Lowest |
| 6.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30 kgs of VG30( 60/70) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30t on capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9mpaver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 159 | M3 | 12,500 ₹19,87,500 | 11,418 ₹18,15,462 Lowest |
| 7.00 | Supplying and Spreading of well Gravel from approved quarry in Layer of not more than 15cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidential charges etc., complete as per Standard Specification. | 68 | m3 | 400 ₹27,200 | 315 ₹21,420 Lowest |
| 8.00 | Providing and laying of hot applied thermoplastic compound f2.5mm thick including refllectorising glass beads @ 250grms per sqm area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 the Finished surface to be level, uniform and free from steaks and holes etc., complete as per MORT & H Specification NO.803 | 271 | m2 | 950 ₹2,57,450 | 890 ₹2,41,190 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
5 Mar 2026, 3:00 pmClosed
Executive officer
Executive officer Karambakkudi Townpanchayat
Earthern Road Converted to BT Road at Mela Harizana Street Karumaali street Busstop opposite Cross Road,Ward Number13 Kanakar Street to Vinayagar Kovil south,Sulaimaan Nagar Sweeper Coloney Near Cross Road,Pallivasal street Albathriya NagarKasim Ko
2026_DTP_668721_1
1048/2025/A1
Open Tender
Civil Works
Works
Karambakkdui Townpanchayat
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
10 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401Laying and Jointing PVC Pipe. Heading | - | m3 | 100 | - |
| 2 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with waterat OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | - | M3 | 100 | - |
| 3 | Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | - | m2 | 100 | - |
| 4 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | - | m2 | 10 | - |
| 5 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | - | m3 | 10 | - |
| 6 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30 kgs of VG30( 60/70) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30t on capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9mpaver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | - | M3 | 10 | - |
| 7 | Supplying and Spreading of well Gravel from approved quarry in Layer of not more than 15cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidential charges etc., complete as per Standard Specification. | - | m3 | 10 | - |
| 8 | Providing and laying of hot applied thermoplastic compound f2.5mm thick including refllectorising glass beads @ 250grms per sqm area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 the Finished surface to be level, uniform and free from steaks and holes etc., complete as per MORT & H Specification NO.803 | - | m2 | 10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 0.09 MB
Tendernotice_3.pdf
PDF • 0.84 MB
BOQ_803461.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .