Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹10.1 L+₹637.06 (0.06%)Admitted-Finance TUNDLA FIROZABAD UTTAR PRADESH | TUNDLA | FIROZABAD | UTTAR PRADESH | L2 | Admitted-Finance | |
| 3 | L3₹10.3 L+₹18,480.46 (1.83%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹10.7 L+₹60,054.89 (5.94%)Admitted-Finance YADUVANSHAM NAGAR MAINPURI | MAINPURI | MAINPURI | UTTAR PRADESH | L4 | Admitted-Finance | |
| 5 | L5₹10.8 L+₹73,111.36 (7.23%)Admitted-Finance ANWALKHEDA MR | CHHINDWARA | MADHYA PRADESH | 460663 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Mani Construction L4 | M/s SHRI MAHIPAL SINGH L6 | M/s SADANBABU CONTRACTOR L1 | M/s GAYATRI CONTRACTOR and SUPPLER L3 | M/S SHIVAM SINGH CONTRACTOR L5 | M/s CHANDRA PAL SINGH L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete, RCC & RB work in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in charge | 45.96 | Cum | 299 ₹13,742.34 | 175 ₹8,043.18 Lowest | 396.16 ₹18,207.91 | 400 ₹18,384.4 | 424.76 ₹19,522.39 | 200 ₹9,192.2 |
| 2.00 | Earth work in Foundation in dry ordinary soil including liftup to 1.50 meter and lead up to 30 meter including back filling, watering and ramming of excavated earth including cost of all materials, labour , dewatering and T&P complete etc . | 188.01 | Cum | 59 ₹11,092.77 | 40 ₹7,520.52 | 76.48 ₹14,379.23 | 60 ₹11,280.78 | 82 ₹15,417.07 | 30 ₹5,640.39 Lowest |
| 3.00 | Cement concrete 1:4:8 in foundation with cement, coarse sand , and stone grit 20-40 mm size including cost of all materials, labour , T&P complete etc . | 20.15 | Cum | 2,999 ₹60,426.85 Lowest | 4,800 ₹96,715.2 | 4,168 ₹83,981.03 | 4,200 ₹84,625.8 | 4,468.83 ₹90,042.46 | 4,800 ₹96,715.2 |
| 4.00 | Ist class brick work (M 15) in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc | 65.46 | Cum | 5,299 ₹3,46,893.74 | 5,200 ₹3,40,412.8 | 4,150.57 ₹2,71,712.91 Lowest | 5,200 ₹3,40,412.8 | 4,450.14 ₹2,91,323.97 | 5,000 ₹3,27,320 |
| 5.00 | Cement Pointing(Struck deep) on Brick Masonry with cement mortar 1:2 including cost of all materials, Labour and T& P etc | 68.78 | Sqm | 199 ₹13,686.42 | 120 ₹8,253.12 | 107.84 ₹7,416.6 | 100 ₹6,877.6 Lowest | 115.62 ₹7,951.88 | 135 ₹9,284.76 |
| 6.00 | Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintel,sun shades, columns and wall etc | 80.9 | Sqm | 199 ₹16,099.9 | 400 ₹32,361.6 | 439.76 ₹35,578.34 | 150 ₹12,135.6 Lowest | 471.5 ₹38,146.24 | 400 ₹32,361.6 |
| 7.00 | R.C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc . | 41.92 | Cum | 7,299 ₹3,05,995.98 | 7,000 ₹2,93,461 | 5,661.89 ₹2,37,363.41 Lowest | 6,500 ₹2,72,499.5 | 6,070.54 ₹2,54,495.25 | 6,100 ₹2,55,730.3 |
| 8.00 | C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc . | 6.97 | Cum | 6,299 ₹43,891.43 | 6,000 ₹41,808 | 5,168.59 ₹36,014.74 Lowest | 6,500 ₹45,292 | 5,541.64 ₹38,614.15 | 5,400 ₹37,627.2 |
| 9.00 | Reinforced steel including bending, binding,cutting and placing in position including cost of matarial and labour complete. | 2.74 | MT | 69,999 ₹1,91,517.26 | 80,000 ₹2,18,880 | 68,994 ₹1,88,767.58 | 65,000 ₹1,77,840 Lowest | 73,973.84 ₹2,02,392.43 | 72,000 ₹1,96,992 |
| 10.00 | Earth Work in making diversion and ramp during construction in all type of soil including all lead, lift and T&P etc required for proper completion of item of work. | 344.46 | M³ | 99 ₹34,101.54 | 70 ₹24,112.2 | 129 ₹44,435.34 | 60 ₹20,667.6 | 138.58 ₹47,735.27 | 20 ₹6,889.2 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
31 May 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
ICD Firozabad Hq Shikohabad
Reconstruction of VRB at Km 3.200 of Ubty Dy
2023_UPIDC_804020_2
01/EE/2023-24
Open Tender
Civil Works - Canal
Item Rate
180 days
Reconstruction of VRB at Km 3.200 of Ubty Dy
Please refer tender documents
2 documents required · 2 mandatory
₹384
Executive Engineer
₹1.3 L
12 Jun 2023
22 May 2023
1 Jun 2023
22 May 2023
31 May 2023
22 May 2023
Amount
Dismantling brick work or stone work and cement concrete, RCC & RB work in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in charge
Earth work in Foundation in dry ordinary soil including liftup to 1.50 meter and lead up to 30 meter including back filling, watering and ramming of excavated earth including cost of all materials, labour , dewatering and T&P complete etc .
Cement concrete 1:4:8 in foundation with cement, coarse sand , and stone grit 20-40 mm size including cost of all materials, labour , T&P complete etc .
Ist class brick work (M 15) in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc
Cement Pointing(Struck deep) on Brick Masonry with cement mortar 1:2 including cost of all materials, Labour and T& P etc
Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintel,sun shades, columns and wall etc
R.C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc .
C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc .
Reinforced steel including bending, binding,cutting and placing in position including cost of matarial and labour complete.
Earth Work in making diversion and ramp during construction in all type of soil including all lead, lift and T&P etc required for proper completion of item of work.
Construction joint with thermocol including cost of all materials, labour T &P etc.
Supplying and Fixing 90 mm dia drainage pipe.
Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applid @ 0.75Ltr/10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work.for two coat.
Hiring of diesel pumps 5 HP including operater POL and maintenance
Laying and fixing in position and alignment RCC hume pipe NP-3 (Socket hume pipe) 1000 mm dia including excavation and back filling including cost of material.
Information sign Board Made of 18 gauge m.s. sheet and angle iron 50X50X6 mm two part of angle of iron 3 mtr. Long
M/s CHANDRA PAL SINGH
M/s GAYATRI CONTRACTOR and SUPPLER
M/s Mani Construction
M/S SHIVAM SINGH CONTRACTOR
M/s SHRI MAHIPAL SINGH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .