Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.1 L+₹21,569.18 (5.61%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.2 L+₹36,142.94 (9.39%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.2 L+₹39,990.41 (10.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.3 L+₹40,748.25 (10.6%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.8 L
EMD Value
₹11,670
Closing Date
27 Jul 2026, 6:00 pmClosed
Executive Engineer RnB Division Kralpora
RnB Division Kralpora
Construction of Approach road to School Building Dohama at Paddergund
2026_PWDJK_315455_6
E tendering NIT No 20/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
20 days
Kralpora Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer RnB Division Kralpora
₹11,670
3 Aug 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
27 Jul 2026
10 Jul 2026
10 Jul 2026 - 24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Providing / laying of RCC Pipes in proper position/ grade including cutting of road surface upto required depth, providing requisite cushion including carriage of all materials and pipes upto site of work complete. 12'' dia | 9.76 | Rm | 3,200 | ₹31,232 |
| 1.2 | 18'' dia | 7.32 | Rm | 4,500 | ₹32,940 |
| 2 | Supply and filling of RBM /Nallah Muck/Stone soling of specified size including spreading, watering, ramming, compacting with PRR of 8 to 10 Tonne capacity including carriage of the same from approved source upto site of work complete | 214.62 | Cum | 1,000 | ₹2,14,620 |
| 3 | Earth work in excavation for all kinds of soil by manual / mechanical means in trenches for foundation, drains, pipes, cables, etc upto required depth not exceeding 1.5 m in width as well as 10 sqm on plan including dressing of sides and ramming of bottoms, disposal of excavated earth up to a lead as directed by site engineer incharge, disposed soil to be levelled and neatly dressed complete | 23.4 | Cum | 256.85 | ₹6,010.29 |
| 4 | Supply and laying of dry stone soling (hand packed) in foundation trenches and ramming, including all leads, lifts cost and carriage of materials involved complete. | 4.45 | Cum | 1,000 | ₹4,450 |
| 5 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 3.34 | Cum | 5,202.9 | ₹17,377.69 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, incl 75mm pipes for weep holes | 29.52 | Cum | 7,200 | ₹2,12,544 |
| 7.1 | Centering and shuttering including strutting, propping etc. and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. complete Job | 72 | Sqm | 628.95 | ₹45,284.4 |
| 7.2 | Centering & Shuttering using kitply including strutting propping etc & removal of form work including all leads, lifts, costs & carriages upto site of work complete in Foundation footings, Basis of colums, Plinth beams, walls & Mass concrete | 52.8 | Sqm | 286.35 | ₹15,119.28 |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate, including all leads, lifts, costs & carriages upto site of work | 6 | Sqm | 562.15 | ₹3,372.9 |
stage.html
html • 0.03 MB
finance_1023518.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1023518.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .