Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC l1 |
| 2 | L2₹2.1 LRejected-AOC | ₹2.1 L | L2 | Rejected-AOC l2 |
| 3 | L3₹2.1 LRejected-AOC | ₹2.1 L | L3 | Rejected-AOC l3 |
Tender Value
₹2.1 L
EMD Value
₹4,293
Closing Date
13 Dec 2025, 1:00 pmClosed
BLOCK DEVEPMENT OFFICER
PHANSIDEWA DARJEELING
Construction of CC road from PWD road to Prafulla Roy house Appx 115 Mtr under Jalash Nizamtara GP within Phansidewa development Block under APAS fund 2025 ID APAS-01-027-150-0003 Priority No 03 Booth No 27-150 Job16
2025_DMD_952201_16
56/BDO/PHD/APAS/JNGP/2025-26
Open Tender
CIVIL WORKS
30 days
JALASH NIJAMTARA GP
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,293
Yes
24 Jan 2026
19 Nov 2025
15 Dec 2025
19 Nov 2025
13 Dec 2025
19 Nov 2025
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (iv) For Construction of Sub Base by compacting river bed materials. Add cost at site of 1.28 m³ of materials to arrive at the complete rate.
Laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. NB - This rate only for Northern Circle, NBCC-I & NBCC-II
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree(a) 1:2:4 proportion
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
Supplying, fitting-fixing of iron frame display board at working site including writing with carring all other charges completed. ( L.S.)
Add @ 18% GST
Add @ 1% L.CESS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tendernotice_2.pdf
PDF • 0.15 MB
BOQ_2281813.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid