Loading…
Loading…
Tender Value
₹35 L
EMD Value
₹3.5 L
Closing Date
6 Oct 2026, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
Rest House Parisar me Boundary wall ka Nirman Karya
2026_CEUBZ_1191272_2
4938/4E-NIVIDA-BASTI CIRCLE/2026-27 DATED-25-08-2026
Open Tender
Civil Works - Buildings
Percentage
90 days
BASTI
AS PER MBD
2 documents required · 2 mandatory
₹2,714
₹3.5 L
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
30 Sept 2026
30 Sept 2026
6 Oct 2026
30 Sept 2026
6 Oct 2026
30 Sept 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.. complete in all aspects or as per direction of E/I As per DSR No 2.8.1 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 285 | cum | 180 | ₹51,300 |
| 2 | Providing and laying in position ready mixed or site batched design mix cementconcrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Concrete of M10 grade with minimum cementcontent of 220 kg /cum with curing complete in all aspects or as per direction of E/I As per DSR No 4.20.1.1 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 28 | cum | 6,110 | ₹1,71,080 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) R.C.C.in Plinth band cum with curing complete in all aspects or as per direction of E/I As per DSR No 5.1.2 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 11 | cum | 6,255 | ₹68,805 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). cum with curing complete in all aspects or as per direction of E/I As per DSR No 5.3 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 14 | cum | 7,955 | ₹1,11,370 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) R.C.C.in Column cum with curing complete in all aspects or as per direction of E/I As per DSR No 5.1.2 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 9 | cum | 6,255 | ₹56,295 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) cum with curing complete in all aspects or as per direction of E/I As per DSR No 5.2.2 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 15 | cum | 7,505 | ₹1,12,575 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) R.C.C. work in footing cum with curing complete in all aspects or as per direction of E/I As per DSR No 5.1.2 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 31 | cum | 6,255 | ₹1,93,905 |
| 8 | TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. complete in all aspects or as per direction of E/I As per DSR No 5.22.6 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 124 | Qtl | 7,460 | ₹9,25,040 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class 150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) cum with curing complete in all aspects or as per direction of E/I As per DSR No 6.1.1 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 83 | cum | 5,095 | ₹4,22,885 |
| 10 | M-150 Brick work in super-structure above plinth level up to floor two level ( up to two storeys ) including necessary cutting and moulding of brick work as required and also including honeycombed brick work in thickness of wall more than 12cms. (1:6 cement : Coarse sand). cum with curing complete in all aspects or as per direction of E/I As per DSR No 6.4.2 (Rates are Excluding GST but Including of all other taxes labour cess ,material ,labour and T&P etc) | 9 | cum | 6,295 | ₹56,655 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_2246366.xls
BOQ • 0.43 MB
2.pdf
Tender Documents • 3.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .