| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-AOC | ₹18.2 L | L1 | Accepted-AOC Financial bid accepted at the rate |
| 2 | L2₹18.6 LRejected-Finance | ₹18.6 L | L2 | Rejected-Finance reject being highest rate |
| 3 | L3₹19.1 LRejected-Finance | ₹19.1 L | L3 | Rejected-Finance reject being highest rate |
| 4 | L4₹19.2 LRejected-Finance | ₹19.2 L | L4 | Rejected-Finance reject being highest rate |
| Sl No | Description | Qty | Unit | HARGOVIND RATHAUR L2 | SHRISHTI ASSOCIATE L1 | M/S SAROJ L4 | M/S SINGH CONTRACTOR AND SUPPLIERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in trenches for foundations and pipes cables etc in ordinary soil (loan clay or sand) including lift upto 1.5 m, lead upto 50 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer- in- charge with in a lead of 50m. | 42 | Cum | 99.97 ₹4,198.74 | 90 ₹3,780 | 102.79 ₹4,317.18 | 102 ₹4,284 |
| 2.00 | Earth work in foundation of walls, piers, abutments etc. with disposal within 30-m lead and 1.5 m. lift-In Mar, Kabar and Rankar soil. | 121.73 | Cum | 268.25 ₹32,654.07 | 250 ₹30,432.50 | 275.5 ₹33,536.62 | 274 ₹33,354.02 |
| 3.00 | Laying C.C. 1:3:6 per Cum i/c laying, ramming, curing and including cost of material, labour , T&P for proper comletion of work. | 15.35 | Cum | 4,535.9 ₹69,626.07 | 4,600 ₹70,610 | 4,663.55 ₹71,585.49 | 4,639 ₹71,208.65 |
| 4.00 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface | 139.45 | sqm | 188.49 ₹26,284.93 | 180 ₹25,101 | 193.8 ₹27,025.41 | 193 ₹26,913.85 |
| 5.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources). | 29.83 | sqm | 417.87 ₹12,465.06 | 430 ₹12,826.90 | 429.64 ₹12,816.16 | 427 ₹12,737.41 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete.(Mild steel and Medium Tensile steel bars) | 2,710.27 | kg | 83.16 ₹2.3 L | 80 ₹2.2 L | 85.5 ₹2.3 L | 85 ₹2.3 L |
| 7.00 | Centering & shuttering for R.C.C. slabs, lintels & simple beams including all materials & T&P | 184.08 | sqm | 529 ₹97,378.32 | 480 ₹88,358.40 | 543.88 ₹1.0 L | 541 ₹99,587.28 |
| 8.00 | Centering & shuttering for R.C.C. slabs, lintels & simple beams including all materials & T&P | 230.47 | sqm | 868.19 ₹2.0 L | 850 ₹2.0 L | 892.62 ₹2.1 L | 888 ₹2.0 L |
| 9.00 | R.C.C. work 1:1.5:3 per Cum i/c mixing laying and curing excluding centering,shuttering and reinforcement. and including cost of material, labour , T&P etc. With proper completion of work . | 37.83 | cum | 5,994 ₹2.3 L | 6,000 ₹2.3 L | 6,162.65 ₹2.3 L | 6,130 ₹2.3 L |
| 10.00 | First class brick work in cement morter 1:4 (1cement: 4Sand) using 1st class building bricks i/c all cost of material,labour T&P etc.with proper ccompletion of work. | 77.03 | cum | 5,493.2 ₹4.2 L | 5,500 ₹4.2 L | 5,647.75 ₹4.4 L | 5,618 ₹4.3 L |
Tender Value
Refer Docs
EMD Value
₹41,000
Closing Date
15 Oct 2025, 1:00 pmClosed
EE. Tubewell division first orai Jalaun
Office of EE. Tubewell division first orai Jalaun
CONSTRUCTION OF SUB DIVISIONAL OFFICE IN JALAUN, TEHSIL- JALAUN, DIST.- JALAUN
2025_UPIDM_1080040_1
1224 /T.w.d. fo/EE/25-26 date- 18-09-2025
Open Tender
Civil Works
120 days
Orai
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹41,000
Yes
18 Dec 2025
4 Oct 2025
15 Oct 2025
4 Oct 2025
15 Oct 2025
4 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid