| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | ₹19.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹19.8 LRejected-AOC | ₹19.8 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | M MUTHURAMALINGAM L2 | C.Thangachamy L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for FOUNDATION UNDER RETAINING WALL. | 214.38 | Cum | 410 ₹87,895.80 | 408 ₹87,467.04 |
| 1.02 | Plain Cement Concrete M15 Grade using 20mm ISS size hard broken granite metal including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, tools and plants and all incidental charges such as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for Levelling Course Below Retaining Wall. | 10.72 | sqm | 8,760 ₹93,907.20 | 8,750 ₹93,800 |
| 1.03 | Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm and below HBG graded metal including cost and conveyance of all materials to site excluding cost of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for Footings of Retaining Wall. | 62.62 | sqm | 10,210 ₹6.4 L | 10,198 ₹6.4 L |
| 1.04 | Vibrated Reinforced Cement Concete of Grade M35 using 20mm, 12mm ISS Graded HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVELS. | 12.75 | Cum | 14,580 ₹1.9 L | 14,562 ₹1.9 L |
| 1.05 | Vibrated Reinforced Cement Concete of Grade M35 using 20mm, 12mm ISS Graded HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVELS. | 40.94 | Cum | 16,080 ₹6.6 L | 15,998 ₹6.5 L |
| 1.06 | Providing and Fixing Class I PVC Seepage Pipes of 100mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V) BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS. | 60 | No | 222 ₹13,320 | 210 ₹12,600 |
| 1.07 | Supply and Fabrication of STEEL Grade Fe 500 with suitable anticorrosive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete., Fe 500 Grade. | 7.38 | No | 95 ₹701.10 | 91 ₹671.58 |
| 1.08 | Provision for Wheep Holes with 110mm PVC Pipes | 1 | No | 2,500 ₹2,500 | 2,000 ₹2,000 |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,02,739.21 ₹3.0 L | 3,01,636.98 ₹3.0 L |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
10 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP) THENI
BLOCK DEVELOPMENT OFFICER (BP) THENI
CONSTRUCTION OF RETAINING WALL AT LAKSHMIPURAM BURIAL GROUND PATHWAY NEAR LAKSHMIPURAM RIVER BRIDGE IN JANGALPATTI PANCHAYAT MINES-2025-26
2026_RDTN_651015_1
2763/2025/A.3
Open Tender
Civil Works
90 days
THENI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
13 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for FOUNDATION UNDER RETAINING WALL.
Plain Cement Concrete M15 Grade using 20mm ISS size hard broken granite metal including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, tools and plants and all incidental charges such as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for Levelling Course Below Retaining Wall.
Vibrated Reinforced Cement Concrete of Grade M35 using 20mm, 12mm and below HBG graded metal including cost and conveyance of all materials to site excluding cost of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for Footings of Retaining Wall.
Vibrated Reinforced Cement Concete of Grade M35 using 20mm, 12mm ISS Graded HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVELS.
Vibrated Reinforced Cement Concete of Grade M35 using 20mm, 12mm ISS Graded HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and plants and incidential charges etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVELS.
Providing and Fixing Class I PVC Seepage Pipes of 100mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V) BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS.
Supply and Fabrication of STEEL Grade Fe 500 with suitable anticorrosive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete., Fe 500 Grade.
Provision for Wheep Holes with 110mm PVC Pipes
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_780631.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid