| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.8 LAdmitted-Finance | -0.30% | ₹40.8 L | L1 | Admitted-Finance |
| 2 | L2₹41.7 L+₹94,011.35 (2.31%)Admitted-Finance | +2.00% | ₹41.7 L+₹94,011.35 (2.31%) | L2 | Admitted-Finance |
| 3 | L3₹42.9 L+₹2.2 L (5.32%)Admitted-Finance | +5.00% | ₹42.9 L+₹2.2 L (5.32%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical simillar type of work done not submited |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical M.O.S.T not valid, Bid capacity not submited, |
Tender Value
₹40.9 L
EMD Value
₹40,875
Closing Date
31 Mar 2026, 5:00 pmClosed
Add.Chief Executive Officer Z.P.Pune WellaslayRd.C
Add.Chief Executive Officer Z.P.Pune WellaslayRd.Camp Pune 411001
3 CONSTRUCTION IMPROVEMENT OF ROAD VADAJ TO (TONECHIWADI ) NIMDARI ROAD. TAL. JUNNAR. (V.R. 81) CH. 0/378 TO 2/000
2026_RDPUN_1289692_3
ZPPune/North/eTender/107/25-26
Open Tender
Civil Works - Roads
Percentage
PUNE
As Per NIT
9 documents required · 9 mandatory
₹590
₹40,875
8 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. | - | Cubic Metre | - | - |
| - | Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed | - | Cubic Metre | - | - |
| - | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97 % of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with vibratory roller. | - | Cubic Metre | - | - |
| - | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material | - | Cubic Metre | - | - |
| - | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-incharge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete(Non SCADA Item) | - | Cubic Metre | - | - |
| - | Providing and laying in situ cement concrete M -30 with tremix treatment for 200 mm thickness for Concrete Road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20 mm deep with necessary refilling with bitumen ( excluding reinforcement) with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) etc. complete with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete.(Non SCADA Item) | - | Cubic Metre | - | - |
| - | Supplying hard murum/ kankar at the road site, including conveying and stacking complete | 1 | Cubic Metre | - | - |
| - | Spreading hard murum/ soft murrum/ gravel or kankar for side width complet | 1 | Cubic Metre | - | - |
| - | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete | - | Square Metre | - | - |
| - | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 900mm diaMetre
in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. | - | Running Metre | - | - |
stage.html
html • 0.04 MB
techsummary_2217331.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.10 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.04 MB
Tendernotice_4.pdf
PDF • 0.63 MB
Tendernotice_5.pdf
PDF • 0.39 MB
Tendernotice_6.pdf
PDF • 0.12 MB
BOQ_2217331.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .