Closing Date
1 Aug 2022, 4:30 pmClosed
xen rew kathuaxen rew kathua
xen rew kathua
Constt. of one room with verandha at GPS Arjun Chack
2022_RDPR_180576_1
e-NIT No. 82/REW/K of 2022-23 Dated 23/07/2022
Open Tender
Civil Works
Item Rate
30 days
hiranagar
sbd
2 documents required · 2 mandatory
₹500
Yes
xen rew kathua
Exempted
16 Aug 2022
23 Jul 2022
2 Aug 2022
24 Jul 2022
1 Aug 2022
24 Jul 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
All kinds of soil
L/W &S/W 2*(20.75+12.75) * 3.0*3.0=604.80cft.,
Col. 3no*3.0*3.0*3.0=81.0"
Plinth=2(3+12.5)*2.0*1.5=93.00
778.8cft.=22.04cum
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level "with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) L/W & S/W 2*33.5*3.0*0.25=18.25cft" col. 3no*3.0*3.0*0.25=6.75cft u/floors=20.0*(12.0+20.00) *6.0*0.25=90.00 plinth=2(3+12.5)*2.0*0.25=15.5cft
[email protected]/cum=
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) walls=2*33.5*(2.75+2.25+1.75)*.833+(1.25*1.25)=479.88 plinth=2*(4.5+17.0)*(1.0+1.5)*1.0=105.0cft col.3*(2.75*2.75+2.25*2.25+1.75*1.75)*0.833=39.32cft 3*1.25*1.25*1.25= =5.85" total=630.05cft
Brick work with common burnt clay (non-modular) bricks of class designation7.5 in foundation and plinth including curing in Cement mortar 1:6 (1 cement : 6 coarse sand) walls 2(33.5+10)= = 672.0cft d/d d/w=1*3.0*7.0+2*4.5*4.5) =-61.5" =610.50*0.75=457.87cft col.=3.0*1.125*1.125*10.0= 37.96"
total=495.83cft
Extra for brick work in super structure
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level includincuring but excluding the cost of centring, shuttering,finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 5.3.2 DELETE slab=21.5*19.5=419.25sft*0.375=157.21cft beams= 2(19.5+21.5)*0.75*0.333=20.47 total=177.68cft
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth leve 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc . and removal of form for: i= Foundations, footings, bases of columns etc. for mass concret. 2*2*(21.5+19.5)*2.5=410.0sft=38.10
ii=lintle/beams=2*(21.5+12+6+9)*0.5=48.5sft
iii=slab 20.0*12.0=+21.5*6.0=369.00sft
iv=edges of slab=2*(21.5+16.5)=82.0 rft
15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 6 ( 1 cement : 6 coarse sand)
6MM CEMENT PLASTER 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand)
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought and fixed in position with hold fast lugs or with dash fasteners of required dia a nd length (hold fast lugs or with dash fasteners shall be paid for separately): i.Sal wood D=1*2*(3.0*+7.0)20.0 rft W=2*7*4.50= 63.0" total=83.0*0.25*0.417=8.652cft
Providing and fixing panelled or panelled and glazed shutters for doors,windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-chargeSecond class deodar wood D=1*3.0*7.0=21.0sft W=2*3*4.25*1.25=31.87sft total=52.87sft
Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick. i= MDF board 12 mm thick =21.0sft
ii=4 mm thick glass pane (weighing not less than 10 kg/sqm) W=6*4.0*1.25=30.0sft=
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Colour washing such as green blue or buff to give an even shade New work (two or more coats) with a basecoat of white washing with lime.
Applying priming coat: 13.58.1 With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood) D=3.0*7.0=21.0*2.6=54.6sft W=2*4.5*4.5 =40.5*1.6=64.8sft total= 119.4sft
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work
Cement concrete flooring 1:2:4 (1cement: 2 coarse : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. flooring=20.0*12.0+21.5*6.0=369.0sft
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Providing and fixing fly proof wire gauze to windows, clerestory windows and doors with M.S Flat 15x3 mm and nuts and bolts complete.10.29.1 Galvanized M.S wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides W=2*4.5*4.5=40.5 sft
Disposal of surplus mulba by MT av.1km lead qtty.vide item 1 =22.0 @ 50%
Provision for electric fittins
Carriage of material by MT Qtty.vide item:- Cement Stone agg.40mm&dwn 2. 3.69*3.4= 9.6bag 4.98cum 3. 17.84*4.4= 78.5 " 24.08" 4. 14.04*.25= 17.55 " 3.51" 6. 5.03*8.0= 40.24 " 6.79" 9. 60.26*7.2%= 4.33" 1.0" 10.30.0*8.6%= 2.58" 0.75" 11.39*7.34% = 2.86" 0.35" 16.34.29*.32= 10.97" 2.31" total= 166.28bags 43.77cum i.cement av. 2 km [email protected]=
ii.Stone agg. below 40mm size av 5.0km lead
iii.Bricks av.3.0km lead qtty.vide item 4=17.55*475=
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .