Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance M 13 S S HARMU HOUSING COLONY PS ARGORA PO DORANDA RANCHI JHARKHAND 834002 | RANCHI | JHARKHAND | 834002 | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹73,789 (0.35%)Admitted-Finance | ₹2.1 Cr+₹73,789 (0.35%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MANOJ KUMAR PANDEY L1 | BIRENDRA KUMAR PANDEY L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 66.82 | cum | - | - |
| 2.00 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 6.94 | cum | - | - |
| 3.00 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 45.54 | sqm | - | - |
| 4.00 | Providing P.C.C.M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering mixing cement concreting in mixer and placing in position vibrating striking curing, taxes and royalty all complete as per building specification and direction of E/I. | 6.94 | cum | - | - |
| 5.00 | Providing R.C.C.M-200 with nominal mix of (1:1.5:3) in foundation and plinth with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering mixing cement concreting in mixer and placing in position vibrating striking curing, taxes and royalty all complete as per building specification and direction of E/I. | 88.89 | cum | - | - |
| 6.00 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. | 164.66 | sqm | - | - |
| 7.00providing Tor steel reinforcement of 8mm,10mm dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. | |||||
| 7.01 | 8mm dia bar | 1.6 | MT | - | - |
| 7.02 | 10mm dia bar | 2.4 | MT | - | - |
| 8.00 | providing Tor steel reinforcement of 12mm dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. | 3.2 | MT | - | - |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
4 Mar 2020, 11:00 amClosed
Nodal Officer
e-Procurement Cell, Office of the Chief Engineer Combined office Building. Building Construction Department, Line Tank Road, Ranchi.
Construction of Foundation and Installation of Bronze Sculpture (Freedom Fighters of Jharkhand )at Rajbhawan,Ranchi
2020_BCD_44520_1
BCD/CE/43/Special Works Division /2019-20
Open Tender
Civil Works - Buildings
Item Rate
540 days
Ranchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EE BCD Special Works Division Ranchi
₹4.3 L
Yes
12 Mar 2020
26 Feb 2020
5 Mar 2020
26 Feb 2020
4 Mar 2020
26 Feb 2020
Amount
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.
Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume)
Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.
Providing P.C.C.M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering mixing cement concreting in mixer and placing in position vibrating striking curing, taxes and royalty all complete as per building specification and direction of E/I.
Providing R.C.C.M-200 with nominal mix of (1:1.5:3) in foundation and plinth with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering mixing cement concreting in mixer and placing in position vibrating striking curing, taxes and royalty all complete as per building specification and direction of E/I.
Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.
providing Tor steel reinforcement of 8mm,10mm dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
8mm dia bar
10mm dia bar
providing Tor steel reinforcement of 12mm dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
providing Tor steel reinforcement of 16mm dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite of any colour and shade Area of slab upto 0.50 sqm
CARRAGE OF MATERIALS
A) SAND , LEAD - 8KM(P)
B) STONE CHIPS , LEAD - 22KM(P)
C) BRICKS , LEAD-1k+7p=8KM.
E) LOCAL SAND , LEAD - 3KM
Non Schedule
Supplying fitting fixing in a particular Place Sinage Board Writing on Grenite Base all complete as per drawing specification and direction of E/I.
11 nos of human figures in standing posture 6 feet approx height.ie (A) Sidhu-Kanhu 2 nos. (B) Diva Kisun 2 Nos. (C ) Nilamber-Pitamber 2 Nos. (D) Gaya Munda 1 No. ( E ) Telangna Khariya 1 No. ( F) Tana Jatra Bhagat 1 No. (G) Tilka Manjhi 1 No. ( H) Shaheed Albert Ekka 1 No
Purchase of modeling clay for thirteen statue\sculpture and transportation from Diamond harbor to Ranchi.
Purchase of MS frame for hanging of the clay model and Making of base with 6'x 4'x5” Sal wood structure with lead or aluminum 6 or 8mm Solid rods coated with coconut ropes. (Pipe frame -1nos Lead rod – 25ft Ropes as per requirement ) with all complete as per direction of E/I .
Making of sculpture in clay:- Making of clay model with modelling clay and other structure making materials for modelling . It will include the making cost of the artists & its helping hands with all technical aspects required for the same (freedom fighters 11 Nos) as per direction of E/I .
Making of sculpture piece mould in Glass –Fiber in 2 layers:- Making of glass fibre piece mould from the clay pattern/sculpture with the help of G.P. resin and fibre mat etc as per technical requirement for making of mould including technical experts with all complete as per direction of E/I .
Making of sculpture in Glass –Fiber in 3 layers ( included assistant , labour and Sculptor costs ):-Making of G.F. statue in reinforced glass fiber resin for making of final pattern for approval and to be transformed in metal statue with all complete as per direction of E/I ..
Colouring of Sculpture with N.C colour with Spray with all complete as per direction of E/I . .
Making of all thirteen nos sculpture in Bees , Micro & Paraffin Wax of 6 to 8 mm thickness and covered with Grog -Plaster of Paris core with iron and mess reinforcements for pouring Bronze metal at 1340 degree temp. ( included assistant , labour and Sculptor costs ) it also includes the pouring channels made of wax composition with all complete as per direction of E/I.
De-waxing for 72 hours in brick chamber with a size of 8'x8'x8' with Coal and woods for the drainout of the wax pattern and burning of the grog mould to make it wax free for the preparation of metal pouring with all complete as per direction of E/I.
Cost of Bronze for all thirteen nos sculpture 10 times by weight of wax composition . 50 % of channels are reused so the cost of (Channels are deducted from the total weight of the metal Bronze ) Copper – 85.87 % , Tin – 3.5%, Lead – 3.5%, Zink – 3.5 %, with all complete as per direction of E/I.
Rent of instruments and cost of Crucible of 150 kg with all complete as per direction of E/I.
Making of temporary furnace with fire bricks and Metal door:- Making of furnace with fire bricks metal sheat and local chimney for melting bronze metal upto the temp of 1340°C approx.with all complete as per direction of E/I.
Labour components for pouring,de-gorging and channel Cuttings etc with all complete as per direction of E/I.
Bridging of bronze pieces with Bronze rods ( including labour components and required gas ):-Breezing of pieces of sculptures extracted from grog mould has to be welded with same material (Bronze) with iron frame with all complete as per direction of E/I.
Polishing , chipping and Patination with salts and required acids with all complete as per direction of E/I.
Final polishing at site with all complete as per direction of E/I.
Supply, transportation and installation with Crane and pulley . ( including labour components) with all complete as per direction of E/I.
Artist charges for making sculpture:-Artist charge of making completion of the bronze statue with all making and chiseling and punching work as required to make the statue complete finished with all complete as per direction of E/I.
Making of sculpture of Bir Budhu Bhagat mounted upon horse(height 8 feet approx)
Purchase of MS frame for hanging of the clay model and Making of base with 11'x 7'x5” Sal wood structure with lead or aluminum 6 or 8mm Solid rods coated with coconut ropes. (Pipe frame -1nos Lead rod – 25ft Ropes as per requirement ) with all complete as per direction of E/I .
Making of sculpture in clay ( included assistant , labour and Sculptor costs):- Model of Beer Budhu Bhagat (8ft approx)mounted upon horse with all war equipments he used as per historical references has to be made with modelling clay with required frame work with metal rods & channels etc. It will include all artist and helping people changes for making clay model of same with all complete as per direction of E/I .
Making of sculpture piece mould in Glass –Fiber in 2 layers:- Making of glass fibre piece mould from the clay pattern/sculpture with the help of G.P. resin and fibre mat etc as per technical requirement for making of mould including technical experts with all complete as per direction of E/I .
Making of sculpture of Beer Budhu Bhagat and Swami Vivekananda in Glass –Fiber in 3 layers ( included assistant , labour and Sculptor costs ):-Making of G.F. statue in reinforced glass fiber resin for making of final pattern for approval and to be transformed in metal statue with all complete as per direction of E/I.
Colouring of Sculpture with N.C colour with Spraywith all complete as per direction of E/I.
De-waxing for 72 hours in brick chamber with size of 8'x6'x8' with Coal and woods for the drainout of the wax pattern and burning of the grog mould to make it wax free for the preparation of metal pouring with all complete as per direction of E/I.
Rent of instruments and cost of Crucible of 150 kg with all complete as per direction of E/I.
Making of temporary furnace with a size of 8'x6'x8' with fire bricks and Metal door:- Making of furnace with fire bricks metal sheat and local chimney for melting bronze metal upto the temp of 1340°C approx.with all complete as per direction of E/I.
Labour components for pouring,de-gorging and channel Cuttings and fixing of iron reinforcement material with the help of bridging etc with all complete as per direction of E/I.
Bridging of bronze pieces for Beer Budhu Bhagat and Swami Vivekananda with Bronze rods ( including labour components and required gas ):-Breezing of pieces of sculptures extracted from grog mould has to be welded with same material (Bronze) with iron frame with all complete as per direction of E/I.
Polishing , chipping and Patination with salts, and required acids and required heat treatment with fire blowgan with as per requiement of the metal with all complete as per direction of E/I.
Final polishing of Beer Budhu Bhagat and Swami Vivekananda at site with all complete as per direction of E/I.
Supply, transportation and installation by lifting the statua to the distanation with Crane and pulley. ( including labour components) with all complete as per direction of E/I.
Artist charges for making sculpture of Beer Budhu Bhagat :-Artist charge of making completion of the bronze statue with all making and chiseling and punching work as required to make the statue complete finished with all complete as per direction of E/I.
Making sculpture in bronze of Swami Vivekananda in sitting posture
Purchase of MS frame for hanging of the clay model and Making of base with 6'x6'x 5” Sal wood structure with lead or aluminum 6mm Solid rods coated with coconut ropes. (Pipe frame -1nos Lead rod – 25ft Ropes as per requirement ) with all complete as per direction of E/I.
Making of sculpture in clay ( included assistant , labour and Sculptor costs):- Model of Swami Vivekananda (5ft approx) has to be made with modelling clay with required frame work with metal rods & channels etc. It will include all artist and helping people changes for making clay model of same with all complete as per direction of E/I .
Making of sculpture of Swami Vivekananda (5ft approx) piece mould in Glass –Fiber in 2 layers:- Making of glass fibre piece mould from the clay pattern/sculpture with the help of G.P. resin and fibre mat etc as per technical requirement for making of mould including technical experts with all complete as per direction of E/I .
Colouring of Swami Vivekananda Sculpture with N.C colour with Spray with all complete as per direction of E/I . .
De-waxing for 72 hours in brick chamber with size of 7'x7'x8' with Coal and woods for the drainout of the wax pattern and burning of the grog mould to make it wax free for the preparation of metal pouring with all complete as per direction of E/I.
Hiring of instruments and cost of Crucible of 150 kg with all complete as per direction of E/I.
Making of temporary furnace with a size of 8'x7'x9' with fire bricks and Metal door:- Making of furnace with fire bricks metal sheat and local chimney for melting bronze metal upto the temp of 1340°C approx.with all complete as per direction of E/I.
Labour components for pouring,de-gorging and channel Cuttings chipping of channel ends and fixing of iron reinforcement material with the help of bridging etc with all complete as per direction of E/I.
Polishing , chipping and Patination with salts and required acids with heat bloowing system with all complete as per direction of E/I.
Supply, transportation and installation of Swami Vivekananda statue with Crane and pulley upon the RCC pedastal . ( including labour components) with all complete as per direction of E/I.
Artist charges for making of Swami Vivekananda sculpture in bronze metal with all complete as per direction of E/I. .
Add 12 % GST
Add 1% Labour Cess
BIRENDRA KUMAR PANDEY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
F2-43.pdf
Tender Documents • 0.46 MB
BOQ_58330.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .