Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC COIMBATORE TAMIL NADU 18 | 18 | ₹5.1 Cr Quoted ₹5.3 Cr | L1 | Accepted-AOC Lowest rate quoted |
| 2 | L2₹5.4 Cr+₹10.7 L (2.04%)Rejected-Finance 12F ALOOKARAN HOUSE WOODCOCK ROAD ST MARYS HILL OOTY NILGIRIS DISTRICT 643 001 | THE NILGIRIS | TAMIL NADU | 643001 | ₹5.4 Cr+₹10.7 L (2.04%) | L2 | Rejected-Finance Highest Quoted Rate |
| 3 | L3₹5.5 Cr+₹23.5 L (4.47%)Rejected-Finance | ₹5.5 Cr+₹23.5 L (4.47%) | L3 | Rejected-Finance Highest Quoted Rate |
Tender Value
₹5.1 Cr
EMD Value
₹2.7 L
Closing Date
11 Nov 2019, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Office Highways Department Construction and Maintenance Coimbatore 641018
Improvements to riding quality Widening of pipe culvert, Constrution of protective wall and Up Keeping for a period of 60 months to Government Highways roads in Kothagiri Sub Division Package No. 64
2019_HWAY_142128_1
Package No 64
Open Tender
Civil Works - Highways
Percentage
180 days
Kothagiri
Refer pre qualification document volume I
12 documents required · 12 mandatory
₹0
₹2.7 L
29 Jan 2020
25 Oct 2019
13 Nov 2019
25 Oct 2019
11 Nov 2019
31 Oct 2019
29 Oct 2019 - 30 Oct 2019
eProcurement System Government of Tamil Nadu Created By: Karthikeyan Packiyaraj Created Date/Time: 18-Nov-2019 05:47 PM Tender Title: Package No 64 Tender ID: 2019_HWAY_142128_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Coimbatire Circle
Improvements to riding quality, Widening of pipe culvert, Constrution of protective wall and Up Keeping for a period of 60 months to Government Highways roads in Kothagiri (H) C&M Sub Division Jurisdiction – Package No. 64 A) Improvements to Riding Quality at km 10/2 - 13/8 of Coonoor Kattabettu road (MD 1073) includuing upkeeping for a period of 60 month B) Improvements to Riding Quality at Km 0/0 - 1/8 of Dhimbatty road upkeeping for a period of 60 month C) Improvements to Riding Quality at Km 0/0 - 2/4 of Getticombai Battakorai road upkeeping for a period of 60 month D) Improvements to Riding Quality at Km 6/0 - 9/0 of Marvala Road upkeeping for a period of 60 month F) Widening of Pipe Culvert at km 36/6 of Ooty - Kotagiri Mettupalayam - Sathi - Gobi - Erode Road Including Protective Wall (SH 15) upkeeping for a period of 60 month
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Hilltop Constructions (P) Ltd 45646566.030 5.000 53680361.000 Five Crore Thirty Six Lakh Eighty Thousand Three Hundred and Sixty One
2.00 TRENGARAJU AND CO BUILDERS 45646566.030 2.900 52606754.000 Five Crore Twenty Six Lakh Six Thousand Seven Hundred and Fifty Four
3.00 C K RAJAN 45646566.030 7.500 54958465.000 Five Crore Fourty Nine Lakh Fifty Eight Thousand Four Hundred and Sixty Five
Lowest Amount Quoted BY: TRENGARAJU AND CO BUILDERS(52606754.000)
BOQ Summary Details Tender Title: Package No 64 Tender ID: 2019_HWAY_142128_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 TRENGARAJU AND CO BUILDERS 52606754.000 L1
2 Hilltop Constructions (P) Ltd 53680361.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .