Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.9 LAccepted-AOC GONDA | UTTAR PRADESH | 271305 | L1 | Accepted-AOC L1 | |
| 2 | L2₹34.4 L+₹42,743.74 (1.26%)Rejected-AOC SIDDHARTH NAGAR | L2 | Rejected-AOC L2 |
Tender Value
₹43.5 L
EMD Value
₹88,000
Closing Date
4 Mar 2024, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S. E, Irrigation Construction Circle Basti
S. E, Irrigation Construction Circle Basti
C. C. Lining Work of Bhatpar Dy. between Km. 6.450 to Km. 6.700 and between Km 7.700 to 7.900.
2024_UPIDC_904909_1
07/S.E/2023-24
Open Tender
Civil Works
Item Wise
180 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,514
₹88,000
16 Mar 2024
26 Feb 2024
4 Mar 2024
26 Feb 2024
4 Mar 2024
26 Feb 2024
Amount
E/W In making canal section for C.C.lining with proper compaction i/c cost of all lead lift T &P material labour etc complete.
E/W In lip cutting for proper disposal, compaction and dressing i/c cost of all lead lift T &P material labour etc complete.
E/W in foundation for longitudinal and cross sleeper with proper dressing and manual compaction in all type of soil including of lead, lift T&P etc.
Centering and Shuttering for sleeper including cost of all material labour T&P etc.
Laying CC in M-20 1:1.5:3 for sleeper 200x150 including cost of all material, lead, lift, labour, T&P etc.
Preparation of sub grade for lining work including cost of all material labour T&P etc.
Laying local sand as filler material in bed and side slope with cost of material, labour etc. As per required for proper completion of work.
Supply and laying LDPE film 200 micron thick in bed and side slope over filler material including cost of all material, labour etc. required for proper completion of work.
Laying 65mm thick CC M-20 grade for lining by manual in bed and side slope including cost of all material, labour etc. required for proper completion of work.
Making construction joint, painting with sealing primer and filling with sealing compund i/c cost of all material labour T & P etc complete.
Making Contraction groove, painting with sealing primer and filling with sealing compund i/c cost of all material labour T & P etc complete.
M/S MAA VAISHNAV CONSTRUCTION COMPANY
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .