Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 LAccepted-Finance | ₹31.8 L | L1 | Accepted-Finance Accepted,BeingL-1 |
| 2 | L2₹32.5 LRejected-Finance | ₹32.5 L | L2 | Rejected-Finance Rejected,BeingL-2 |
| 3 | Rejected-Technical TEACHERS COLONY BAHERI BAREILLY | BAHERI | BAREILLY | UTTAR PRADESH | - | - | Rejected-Technical Being Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Being Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Being Non Responsive |
| Sl No | Description | Qty | Unit | FEROZ KHAN CONRACTOR L2 | M/S TANISHAQ ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Supplying & Filling of old/used E.C. Bags with local earth/R.B.M from required lead by tractor trolly i/c sewing with sutli including all lead&lift, loding, unloading, labour, T&P and placing to worksite etc for proper completion of work as directed by engineer-in-charge. | 800 | Nos. | 20 ₹16,000 Lowest | 20.68 ₹16,544 |
| 2.00 | Providing & laying R.B.M for making coffer bund in down stream of barrage excluding cost of R.B.M including all lead&lift, loding, unloading, labour, T&P and placing to worksite etc for proper completion of work as directed by engineer-in-charge. | 225 | cum. | 415 ₹93,375 | 412.43 ₹92,796.75 Lowest |
| 3.00 | Providing & laying hand packed boulder 40-60 Kg. wt. in scour/damaged floor portion including cost of all materials carriage up to site of work, labour T&P etc. required for proper completion of work as directed by engineer-in-charge. | 120.1 | cum. | 1,945 ₹2,33,594.5 | 1,846.72 ₹2,21,791.07 Lowest |
| 4.00 | Providing and laying packing boulder 20 to 40 Kg. wt. in 8 S.W.G. (4mm.) G.I.Wire crate (size 3.0x1.50x1.0 m.) 15cm.x15cm. mesh double Knot type including cost of all material, carriage up to site T&P lead and lift and labour required for proer completion of workas directed by engineer-in-charge. | 20 | Nos. | 11,235 ₹2,24,700 | 10,934.56 ₹2,18,691.2 Lowest |
| 5.00 | Centering & Shuttering for C. C. Works including cost of centering & shuttering all materials ,labour ,T&P etc. required for proper complition of workas directed by engineer-in-charge. | 369.7 | sqm. | 640 ₹2,36,608 Lowest | 648.6 ₹2,39,787.42 |
| 6.00 | Cement concrete in 1:1:2 (1cement:1.0 coarse sand:2.0 stone grit size 12-20mm.) in damaged portion including cost of all materials, labour and T&P etc. required for proper completion of work as directed by engineer-in-charge. | 306.1 | cum. | 8,000 ₹24,48,800 | 7,794.56 ₹23,85,914.82 Lowest |
Tender Value
₹33.8 L
EMD Value
₹68,000
Closing Date
23 Feb 2026, 11:00 amClosed
Executive Engineer, Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Sharda Bairaj Banbasa ke ve - sankhya 31 Se 34 ke Madhya D/S Main Lunching Apron ke Kshatigrast C.C Deking kee Marmmat ke karya.
2026_UPIDC_1116871_1
E Tender No 08/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
30 days
Banbasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹68,000
Yes
10 Mar 2026
18 Feb 2026
23 Feb 2026
18 Feb 2026
23 Feb 2026
18 Feb 2026
Supplying & Filling of old/used E.C. Bags with local earth/R.B.M from required lead by tractor trolly i/c sewing with sutli including all lead&lift, loding, unloading, labour, T&P and placing to worksite etc for proper completion of work as directed by engineer-in-charge.
Providing & laying R.B.M for making coffer bund in down stream of barrage excluding cost of R.B.M including all lead&lift, loding, unloading, labour, T&P and placing to worksite etc for proper completion of work as directed by engineer-in-charge.
Providing & laying hand packed boulder 40-60 Kg. wt. in scour/damaged floor portion including cost of all materials carriage up to site of work, labour T&P etc. required for proper completion of work as directed by engineer-in-charge.
Providing and laying packing boulder 20 to 40 Kg. wt. in 8 S.W.G. (4mm.) G.I.Wire crate (size 3.0x1.50x1.0 m.) 15cm.x15cm. mesh double Knot type including cost of all material, carriage up to site T&P lead and lift and labour required for proer completion of workas directed by engineer-in-charge.
Centering & Shuttering for C. C. Works including cost of centering & shuttering all materials ,labour ,T&P etc. required for proper complition of workas directed by engineer-in-charge.
Cement concrete in 1:1:2 (1cement:1.0 coarse sand:2.0 stone grit size 12-20mm.) in damaged portion including cost of all materials, labour and T&P etc. required for proper completion of work as directed by engineer-in-charge.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_2074506.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].