Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.4 LAccepted-Finance NO 1 57 CLIFFTHI COTTAGE NEAR KALLODI BAJPE MANGALURU 574 142 | DAKSHINA KANNADA | KARNATAKA | 574142 | ₹8.4 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹9.0 L+₹55,555.74 (6.58%)Rejected-Finance NO 6 BHEEMNAGAR MADARMADDI ROAD DHARWAD 580001 | DHARWAD | KARNATAKA | 580001 | ₹9.0 L+₹55,555.74 (6.58%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹9.3 L+₹86,192.22 (10.2%)Rejected-Finance | ₹9.3 L+₹86,192.22 (10.2%) | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | DSOUZA ELECTRICALS L1 | Puneeth constructions L3 | Nextera Distribution and Services pvt ltd L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 80.14 | Cubic Meter | 400 ₹32,056 Lowest | 600 ₹48,084 | 450 ₹36,063 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level -1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.58 | Cubic Meter | 7,500 ₹19,350 | 8,000 ₹20,640 | 6,850 ₹17,673 Lowest |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo- Mechanically Treated bars of grade Fe-500D or more. | 2,735.37 | Kilo Gram | 100 ₹2,73,537 Lowest | 120 ₹3,28,244.4 | 114.56 ₹3,13,363.99 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 54.97 | Square Meter | 800 ₹43,976 | 600 ₹32,982 | 560 ₹30,783.2 Lowest |
| 5.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in- charge, for the following grades of concrete.: Concrete of M30 grade with minimum cement content of 350 kg /cum | 39.99 | Cubic Meter | 8,500 ₹3,39,915 Lowest | 9,500 ₹3,79,905 | 10,500 ₹4,19,895 |
| 6.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 596.11 | Kilo Gram | 200 ₹1,19,222 | 180 ₹1,07,299.8 | 115 ₹68,552.65 Lowest |
| 7.00 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work | 15.45 | Square Meter | 200 ₹3,090 | 180 ₹2,781 | 145 ₹2,240.25 Lowest |
| 8.00 | 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) | 19.66 | Square Meter | 500 ₹9,830 | 472 ₹9,279.52 | 465 ₹9,141.9 Lowest |
| 9.00 | Finishing walls with Acrylic Smooth exterior paint of required shade.New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | 15.75 | Square Meter | 225 ₹3,543.75 | 95 ₹1,496.25 Lowest | 150 ₹2,362.5 |
Tender Value
Refer Docs
EMD Value
₹19,270
Closing Date
17 Jun 2026, 10:00 amClosed
DY.DIRECTOR
Deputy Director, NITK, Surathkal, 575025
Construction of Foundation and Pedestal for the MIG 21 at the front side of Main Administrative building in NITK
2026_NITK_911359_1
Tender No.08/2026-27/HD
Open Tender
Civil Works
Works
45 days
NITK, Surathkal
As per Tender Document
9 documents required · 9 mandatory
₹0
₹19,270
Yes
25 Jun 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
17 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 80.14 | Cubic Meter | 299.35 | ₹23,989.91 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level -1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.58 | Cubic Meter | 8,388.91 | ₹21,643.39 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo- Mechanically Treated bars of grade Fe-500D or more. | 2,735.37 | Kilo Gram | 124.03 | ₹3,39,267.94 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 54.97 | Square Meter | 450.97 | ₹24,789.82 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in- charge, for the following grades of concrete.: Concrete of M30 grade with minimum cement content of 350 kg /cum | 39.99 | Cubic Meter | 11,104.06 | ₹4,44,051.36 |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 596.11 | Kilo Gram | 153.76 | ₹91,657.87 |
| 7 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work | 15.45 | Square Meter | 278.01 | ₹4,295.25 |
| 8 | 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) | 19.66 | Square Meter | 542.05 | ₹10,656.7 |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade.New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | 15.75 | Square Meter | 196.77 | ₹3,099.13 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_957805.xls
BOQ • 0.32 MB
TenDoc08.pdf
Tender Documents • 2.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .