Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.2 LAccepted-AOC NEW GRAIN MARKET SHOP NO 159 NEW GRAIN MARKET GHRAUNDA 132114 | GHARAUNDA | KARNAL | HARYANA | 132114 | L1 | Accepted-AOC OK | |
| 2 | L2₹31.5 L+₹30,104.08 (0.96%)Rejected-AOC | L2 | Rejected-AOC Rejected due to rates on higher side |
Tender Value
₹29 L
EMD Value
₹58,000
Closing Date
18 Apr 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Indri W/S Division, Karnal
Executive Engineer, Indri W/S Division, Karnal
Construction of V.R. Bridge at RD. 40300 of Bazida Disty.
2022_HRY_216298_1
3559/33-A Dt. 08/04/2022
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
₹58,000
Yes
7 Jun 2022
8 Apr 2022
19 Apr 2022
8 Apr 2022
18 Apr 2022
8 Apr 2022
90 days
Amount
Works Details
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge as per old HSR 8.5 (b)
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead as per HSR No. 5.45
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1 :2:4 or leaner mix (i/c equivalent design mix) as per old HSR Item No. 8.6 (d)
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil as per HSR 4.12.1
Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 Km also including, ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete (HSR item No. 4.33)
Dressing side slopes and preparation of sub grade for lining by mechanical/ mannual means as per HSR Item 14.2
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete as per HSR 6.30.1
All works up to Plinth Level M-15 grade plain cement concrete. (cement content considered @ 240 kg/cum) as per HSR 6.22.2.2
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:3 (1 cement:3 coarse sand) as per HSR item No.7.21.1
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content 330 kg manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 All works up to plinth level as per HSR 6.24.1 (Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix).
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies as per HSR 6.30.3
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts as per HSR 6.30.6
Providing and fixing in position 12mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, depth sealing compound Grade-A in expansion joints as per HSR item No. 6.58
Providing and fixing 150 mm dia PVC pipe as per HSR B0242
Back filling behind abutment, wing wall and return wall complete as per drawing and MoRT&H Specification Sandy material already approved rate
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending,placing in position, binding, wastage, overlaps, welded joints,spacer bars, chairs, stays, hangers and annealed steel wire etc.complete in all respect below plinth level as per HSR item No. 6.33.6
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. As per HSR 11.59
Finishing walls with Acrylic Smooth exterior paint of required shade : 11.95.1 New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 as per HSR 11.95.1
Providing and Laying 80 mm thick ISi marked lntertocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. As per HSR 17.69.2
Credit item No. 1
JASPAL SINGH CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .