| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC 4 A 39 2 MACHADO NAGAR OPP APC COLLEGE TUTICORIN 2 | TUTICORIN | TAMIL NADU | 626202 | ₹12.7 L Quoted ₹14.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.2 LRejected-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | ₹16.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ABR ENGINEERS L1 | S. MURUGAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for removing the HB breaker from cubicles, dismantling the breaker truck cover, dismantling the mechanism from the truck disconnection of wiring from terminal block, dismantling the main mechanism parts such as lever , cam disk drive shaft complete, eccentric shaft, trip bar, close /trip magnetic coils assembly, spring charge motor etc., cleaning them with rustoline / NC thinner/Molykote checking the parts and replacing them if necessary – Dismantling the spring charge motor, removal of carbon dust on the commutator with molykote, checking the condition of needle bearing bush etc., replacing them if necessary – Cleaning of main spring drive chain and assembling main mechanism parts with proper alignment if necessary inspection the insulating rod and replacing the same, cleaning the moving contact and fixed contact fingers , removal of carbon scale using molykote, checking the condition of ‘O’ rings and replacing the same assembling the 3 phase pole part in the housing with proper alignment and checking the breaker operations evacuating the pole with the evacuating the pole with the evacuating pump and then filling up the poles with SF6 Gas to adequate pressure dismantling 3 No. wheels in the truck, checking needle bearing and renewing if necessary replacing the 24 Nos. wheel balls, applying grease and assembling in the truck all joints, terminations and bolts tightness to be checked. Assembling the main mechanism in the truck restoring the wiring connection in the respective TB’s connecting the adjusting rod between pole operating shaft and main mechanism lever including cost of consumables like banian waste, grease, NC thinner , rustoline and electrical contact cleaner (Kli-nit spray gun) and all T & P hire charges, etc., | 5 | Nos. | 1,25,525 ₹1.5 L | 1,37,500 ₹1.6 L |
| 2.00 | Charges for removing the HPA breaker from cassette box, dismantling all the breaker mechanism parts servicing them checking the condition of the parts, servicing the spring charging motor, micro switches limit switches etc., if necessary replacing the identified wornout parts, including cost of consumables like banian waste, grease, NC thinner, rusholine and electrical contact cleaner (Kli-nit spray gun ) and hire charges for all T & P etc., complete.(Required spares will be supplied by Board) | 54 | Nos. | 13,55,670 ₹16.0 L | 14,85,000 ₹17.5 L |
Tender Value
Refer Docs
EMD Value
₹10,400
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ICHP- Complete servicing of ABB make 6.6 KV, HB HPA type SF6 Breakers in HT Bus-5A 5B.
2025_EB_633039_1
CE/SE/MI/TTPS/21/2026-2027
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,400
Yes
23 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Charges for removing the HB breaker from cubicles, dismantling the breaker truck cover, dismantling the mechanism from the truck disconnection of wiring from terminal block, dismantling the main mechanism parts such as lever , cam disk drive shaft complete, eccentric shaft, trip bar, close /trip magnetic coils assembly, spring charge motor etc., cleaning them with rustoline / NC thinner/Molykote checking the parts and replacing them if necessary – Dismantling the spring charge motor, removal of carbon dust on the commutator with molykote, checking the condition of needle bearing bush etc., replacing them if necessary – Cleaning of main spring drive chain and assembling main mechanism parts with proper alignment if necessary inspection the insulating rod and replacing the same, cleaning the moving contact and fixed contact fingers , removal of carbon scale using molykote, checking the condition of ‘O’ rings and replacing the same assembling the 3 phase pole part in the housing with proper alignment and checking the breaker operations evacuating the pole with the evacuating the pole with the evacuating pump and then filling up the poles with SF6 Gas to adequate pressure dismantling 3 No. wheels in the truck, checking needle bearing and renewing if necessary replacing the 24 Nos. wheel balls, applying grease and assembling in the truck all joints, terminations and bolts tightness to be checked. Assembling the main mechanism in the truck restoring the wiring connection in the respective TB’s connecting the adjusting rod between pole operating shaft and main mechanism lever including cost of consumables like banian waste, grease, NC thinner , rustoline and electrical contact cleaner (Kli-nit spray gun) and all T & P hire charges, etc.,
Charges for removing the HPA breaker from cassette box, dismantling all the breaker mechanism parts servicing them checking the condition of the parts, servicing the spring charging motor, micro switches limit switches etc., if necessary replacing the identified wornout parts, including cost of consumables like banian waste, grease, NC thinner, rusholine and electrical contact cleaner (Kli-nit spray gun ) and hire charges for all T & P etc., complete.(Required spares will be supplied by Board)
S. MURUGAN CONTRACTOR (BID ID -1550440)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_757355.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid