Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAdmitted-Finance | ₹15.8 L | L1 | Admitted-Finance |
| 2 | L2₹15.9 L+₹13,976.70 (0.88%)Admitted-Finance | ₹15.9 L+₹13,976.70 (0.88%) | L2 | Admitted-Finance |
| 3 | L3₹16.8 L+₹94,614.35 (5.99%)Admitted-Finance | ₹16.8 L+₹94,614.35 (5.99%) | L3 | Admitted-Finance |
| 4 | L4₹17.3 L+₹1.5 L (9.63%)Admitted-Finance | ₹17.3 L+₹1.5 L (9.63%) | L4 | Admitted-Finance |
| 5 | L5₹24.9 L+₹9.1 L (57.5%)Admitted-Finance | ₹24.9 L+₹9.1 L (57.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TANUJ CONST. CO. L3 | Dashmesh Enterprises L2 | pyarelal galar L5 | MANISH INDUSTRIES L4 | PK CONSULTANT L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for attending /cleanig daily complaints of blockage of floor traps, WCs (Indian/European) WHB traps, kitchen traps, urinal traps etc at ground floor or above ground floors with and including necessary T&P as required for this purpose complete all as specified and directed.
Note: (a) Complaint slip shall collected by the contractor/supervisor from MES complaint cell and submit the same duly signed by the occupant at 1630 hrs in the complaint cell. It will be responsibility of contractor to ensure their attendance & completion of complaints.
(b) If any complaint not resolved within 24 hrs the recovery @ Rs 500 per complaint per day will be charged from RAR or Final Bill.
(c) During cleaning of blockage remove grating will be refixed in existing position with white/grey cement after clearing of blockage from trapes.
(d) The contractor will ensure the cleaning /cleaning of all the complaints (Irrespective of Nos) within 24 hrs by deploying additional sewer man /safaiwala if needed. Nothing extra shall be paid on this account.
(e) Contractor shall be solely responsible for supplying all the safety measures required by the sewer man/safaiwala during working hours.
(f) All the waste material/sludge shall be disposed of out of MoD land. | 470 | Each | 100 ₹47,000 Lowest | 150 ₹70,500 | 200 ₹94,000 | 170 ₹79,900 | 125 ₹58,750 |
| 2.00 | Taking out RCC cover slab of septic tank of the 100 users capacity carefully, taking out the sludge including foul water collect the sludge in closed container and burried the same in earth pit below 30 cm of the gound level with in the defence land where directed by the Engineer-in-charge to a distance exc 250 m and n.exc 500 m, returning, filling in the earth in excavated pit after complete removal of sludge from the container, inlet and outlet pipe, M.S ring and septic tank complete cleaning with fresh water as directed and placing the RCC cover slab in position and set in CM 1:6 complete all as specified and directed | 1 | Each | 1,500 ₹1,500 | 150 ₹150 Lowest | 1,500 ₹1,500 | 1,125 ₹1,125 | 1,500 ₹1,500 |
| 3.00 | All as per ser item no 2.00 here-in-before but 50 users capacity complete all as specified and directed. | 3 | Each | 1,200 ₹3,600 | 100 ₹300 Lowest | 1,000 ₹3,000 | 1,150 ₹3,450 | 1,100 ₹3,300 |
| 4.00 | All as per ser item no 2.00 here-in-before but 25 users capacity complete all as specified and directed. | 5 | Each | 900 ₹4,500 | 50 ₹250 Lowest | 800 ₹4,000 | 975 ₹4,875 | 800 ₹4,000 |
| 5.00 | All as per item No. 2.00 here-in-before but for cleaning of man holes of any size depth n.exc 60 cm complete all as specified and directed. | 40 | Each | 200 ₹8,000 | 75 ₹3,000 Lowest | 300 ₹12,000 | 425 ₹17,000 | 355 ₹14,200 |
| 6.00 | All as per item No. 2.00 here-in-before but for cleaning of man holes of any size depth exc 60 cm and n.exc 1.20 mtr complete all as specified and directed. | 30 | Each | 200 ₹6,000 | 100 ₹3,000 Lowest | 500 ₹15,000 | 490 ₹14,700 | 355 ₹10,650 |
| 7.00 | All as per item No. 2.00 here-in-before but for cleaning of man holes of any size depth exc 1.20 mtr complete all as specified and directed. | 20 | Each | 200 ₹4,000 | 150 ₹3,000 Lowest | 800 ₹16,000 | 550 ₹11,000 | 625 ₹12,500 |
| 8.00 | Dewatering/Desludding from existing soakage well of size 2.4 M dia x 3.00 M deep by sewage suction machine truck mounting equipped with sewage storage tank and removing/dispose off foul material/sludge out side the defence land on the location enmarked by civil authorities complete all as specified and directed. | 2 | Each | 1,250 ₹2,500 | 3,000 ₹6,000 | 560 ₹1,120 | 520 ₹1,040 Lowest | 1,000 ₹2,000 |
| 9.00 | All as per item No. 8.00 here-in-before but for size 1.8 M dia X 3.0M deep complete all as specified and directed. | 4 | Each | 950 ₹3,800 | 1,800 ₹7,200 | 600 ₹2,400 Lowest | 1,310 ₹5,240 | 800 ₹3,200 |
| 10.00 | All as per item No. 8.00 here-in-before but for size size 1.2 M dia X 3.0M deep complete all as specified and directed. | 6 | Each | 650 ₹3,900 | 1,500 ₹9,000 | 1,500 ₹9,000 | 1,080 ₹6,480 | 600 ₹3,600 Lowest |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
22 Aug 2026, 6:00 pmClosed
Col Pawan Kumar, CWE
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
REPAIRS/REPLACEMENT OF DAMAGED SEWAGE LINE, CLEANING OF SEWAGE LINE, SEPTIC TANK, MANHOLES ETC AT ADMIN AREA AND TECH AREA TAKU CPE ITARSI UNDER GE BHOPAL
2026_MES_780983_1
84304/E8
Open Tender
Civil Works
Item Rate
180 days
Bhopal
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹500
Yes
GE Bhopal
₹30,000
Yes
31 Aug 2026
27 Jul 2026
24 Aug 2026
27 Jul 2026
22 Aug 2026
10 Aug 2026
27 Jul 2026 - 10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for attending /cleanig daily complaints of blockage of floor traps, WCs (Indian/European) WHB traps, kitchen traps, urinal traps etc at ground floor or above ground floors with and including necessary T&P as required for this purpose complete all as specified and directed.
Note: (a) Complaint slip shall collected by the contractor/supervisor from MES complaint cell and submit the same duly signed by the occupant at 1630 hrs in the complaint cell. It will be responsibility of contractor to ensure their attendance & completion of complaints.
(b) If any complaint not resolved within 24 hrs the recovery @ Rs 500 per complaint per day will be charged from RAR or Final Bill.
(c) During cleaning of blockage remove grating will be refixed in existing position with white/grey cement after clearing of blockage from trapes.
(d) The contractor will ensure the cleaning /cleaning of all the complaints (Irrespective of Nos) within 24 hrs by deploying additional sewer man /safaiwala if needed. Nothing extra shall be paid on this account.
(e) Contractor shall be solely responsible for supplying all the safety measures required by the sewer man/safaiwala during working hours.
(f) All the waste material/sludge shall be disposed of out of MoD land. | 470 | Each | - | - |
| 2 | Taking out RCC cover slab of septic tank of the 100 users capacity carefully, taking out the sludge including foul water collect the sludge in closed container and burried the same in earth pit below 30 cm of the gound level with in the defence land where directed by the Engineer-in-charge to a distance exc 250 m and n.exc 500 m, returning, filling in the earth in excavated pit after complete removal of sludge from the container, inlet and outlet pipe, M.S ring and septic tank complete cleaning with fresh water as directed and placing the RCC cover slab in position and set in CM 1:6 complete all as specified and directed | 1 | Each | - | - |
| 3 | All as per ser item no 2.00 here-in-before but 50 users capacity complete all as specified and directed. | 3 | Each | - | - |
| 4 | All as per ser item no 2.00 here-in-before but 25 users capacity complete all as specified and directed. | 5 | Each | - | - |
| 5 | All as per item No. 2.00 here-in-before but for cleaning of man holes of any size depth n.exc 60 cm complete all as specified and directed. | 40 | Each | - | - |
| 6 | All as per item No. 2.00 here-in-before but for cleaning of man holes of any size depth exc 60 cm and n.exc 1.20 mtr complete all as specified and directed. | 30 | Each | - | - |
| 7 | All as per item No. 2.00 here-in-before but for cleaning of man holes of any size depth exc 1.20 mtr complete all as specified and directed. | 20 | Each | - | - |
| 8 | Dewatering/Desludding from existing soakage well of size 2.4 M dia x 3.00 M deep by sewage suction machine truck mounting equipped with sewage storage tank and removing/dispose off foul material/sludge out side the defence land on the location enmarked by civil authorities complete all as specified and directed. | 2 | Each | - | - |
| 9 | All as per item No. 8.00 here-in-before but for size 1.8 M dia X 3.0M deep complete all as specified and directed. | 4 | Each | - | - |
| 10 | All as per item No. 8.00 here-in-before but for size size 1.2 M dia X 3.0M deep complete all as specified and directed. | 6 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_874867.xls
BOQ • 0.26 MB
84304TenderDocuments.pdf
Tender Documents • 1.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .