| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC NAN | ₹3.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 Cr+₹7.0 L (2.22%)Rejected-AOC | ₹3.2 Cr+₹7.0 L (2.22%) | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹6.7 L
Closing Date
15 Mar 2021, 11:00 amClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAJARIYA MAHOBA
Balance Earth Work and Pucca Work of Keolari Dam Sahayak Pariyojana
2021_UPIDC_565030_1
03/SE/ICCM/2020-21
Open Tender
Civil Works
Item Rate
180 days
MAHOBA
AS PER NIT AND TENDER NOTICE
2 documents required · 2 mandatory
₹2,354
₹6.7 L
22 May 2021
8 Mar 2021
15 Mar 2021
8 Mar 2021
15 Mar 2021
8 Mar 2021
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (G.S.T. will be paid extra as per rules)
Earth work for Consrtuction feeder channel/Nala in karker kaber ranker and kanker mixed soil in digging or in embankment including all lead & left including dressing making profile and manual compaction but excluding machenical compaction.
Earth work in excavation of hard rocks by blasting including cost of drilling explosivs and proper stacking
Earth work in back filling including lead and lift, all cost of material, labour and T&P etc. Proper completion of the work.
Earth work in foundation in M.K.R. & Kanker mixed soil and saturated soil with 30mm lead 1.50m lift.
Earth work in excavation of hard rocks by blasting including cost of drilling explosivs and proper stacking
Earth work in back filling including lead and lift, all cost of material, labour and T&P etc. Proper completion of the work.
Earth work in foundation in M.K.R. & Kanker mixed soil and saturated soil with 30mm lead 1.50m lift.
Excavation of foundatin in all type of strata excluding hard rock including disposal with all leads and lift & T&P etc. for proper completion of job as per direction of Engireer-in-Charge.
C.C. in 1:3:6 in foundation with stone ballast including cartage all labor and material. Complete.
C.C. in 1:2:4 in toe wall including all cost of all material, labour and T&P etc. Proper completion of the work.
R.C.C. in 1:1½:3 in slab with cost of stone grit all cost of material and labor T&P etc.
Reinforcement steel cutting bending binding with cost of all labor & material.
Centeriang & Shuttering for R.C.C. work cost of all labor and material complete.
P/F P.V.C. pipe 100mm dia including all cost of material labor T&P. etc.
S/L stone boulder pitching including cost of material, carriage loading and unloading including cost of labour etc.
Laying of NP3 R.C.C. Pipe 1600mm dia
Coarse Sand filling in foundation including supply of all material, labour and T&P etc. required for proper completion of work .
S/L stone boulder 40-63kg. (Min 23cm size) pitching in filter including cost of material, labor laying complete.
Random rubble stone Masonry in 1:4 cement -sand mortar including cost of all mateial, labour and T&P with all leads and lifts for proper completion of Job as per direction of Engineer-in-Charge.
Supply and Laying R.C.C. pipe 0.9 M Ø NP-3 with R.C.C. coller including all cost of all material, labour and T&P etc. Proper completion of the work.
First class brick work in 1:4 cement and coarse sand mortar including supply of all material, labour and T&P etc. required for proper completion of the work.
Raised or struck pointing in 1:2 cement sand mortar including cost of all material, labour T&P etc. for proper completion of Job as per direction of Engineer-in-charge.
M/S MANKAMESHWAR INFRA STRUCTURE
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .